<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Archiving and Interchange DTD v1.0 20120330//EN" "JATS-archivearticle1.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta />
    <article-meta>
      <title-group>
        <article-title>Assessment and Improvement of Information Quality through Information Management Process Concept</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>Ismael Caballero</string-name>
          <email>Ismael.Caballero@uclm.es</email>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Mario Piattini</string-name>
          <email>Mario.Piattini@uclm.es</email>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <aff id="aff0">
          <label>0</label>
          <institution>---------------- • Ismael Caballero is with the ALARCOS Research Group. Escuela Superior de Informática (UCLM).Paseo de la Universidad</institution>
          ,
          <addr-line>4, 13071, Ciudad Real</addr-line>
          ,
          <country country="ES">Spain</country>
        </aff>
      </contrib-group>
      <pub-date>
        <year>2004</year>
      </pub-date>
      <abstract>
        <p>- It is a well known fact that information is one of the most important assets for today's enterprises since it is the basis for organizational decisions. However, as information is produced from data, both data and information quality must be assured. Although many researches have proposed technical and managerial solutions to some specific information quality problems, an integrative framework which brings together these kinds of solutions is still lacking. Our proposal consists of a framework for assessing and improving information quality through the concept of Information Management Process (IMP). An IMP is assessed according to an information quality maturity model by using an assessment and improvement methodology. The framework provides a consistent roadway for coordinating efforts and resources to manage information quality with a strategic perspective. As an application example, a study case has been included in the paper.</p>
      </abstract>
      <kwd-group>
        <kwd />
        <kwd>Information Quality</kwd>
        <kwd>Information Quality Management</kwd>
        <kwd>Information Quality Assessment</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>1 INTRODUCTION</title>
      <p>
        Aof a data manufacturing process, where data must be
s [
        <xref ref-type="bibr" rid="ref39">39</xref>
        ] states, information can be obtained as the result
considered as non-ideal raw material for this process.
      </p>
      <p>
        Data is said to be non- ideal due to different and specific
potholes related to special characteristics of data: multiple
sources of data can generate different values; systematic
errors can generate information losses; a large amount of
data can be unmanageable for an application in a
reasonable time; distributed and heterogeneous systems can
generate inconsistent formats, values or definitions, … [
        <xref ref-type="bibr" rid="ref37">37</xref>
        ].
      </p>
      <p>
        These potholes are all sources of ongoing information
quality problems, like unused data, barriers to data accessibility
or data utilization difficulty. The need to consider data and
information as one of the most important assets for
organizations [
        <xref ref-type="bibr" rid="ref19">19</xref>
        ] (and therefore one of the most precious
resources [
        <xref ref-type="bibr" rid="ref30">30</xref>
        ]) has been demonstrated since it is the basis for
tactical, strategic or operational decisions [
        <xref ref-type="bibr" rid="ref33 ref36">33, 36</xref>
        ]. Poor data
and information quality will have a negative impact on the
global efficiency of organizations [
        <xref ref-type="bibr" rid="ref33">33</xref>
        ].
      </p>
      <p>
        Fortunately, more and more organizations have at last
realized the importance of information quality and they try to
implement some of the frameworks proposed by
researchers [
        <xref ref-type="bibr" rid="ref1 ref13 ref19 ref23 ref28 ref30 ref33 ref36 ref38 ref40 ref7">1, 7, 13, 19, 23, 28, 30, 33, 36, 38, 40</xref>
        ] for improving
specific information quality issues, although many of these
organizations do not yet have the right techniques, tools
and practices to achieve a high information quality level
[
        <xref ref-type="bibr" rid="ref25">25</xref>
        ]. One of the reasons for this fact, is that information
quality problems are not usually understood as a global
problem by the entire organization. It is a matter for the
quality management team, encouraged by organization
heads, who must implement several quality management
concepts like information quality policy, information
strategy, information quality planning, information quality
control and information quality assurance through
organization [
        <xref ref-type="bibr" rid="ref16 ref17">16, 17</xref>
        ], implying all the workers and trying to
coordinate efforts and commitments in order to control and
improve information quality issues [
        <xref ref-type="bibr" rid="ref29">29</xref>
        ].
      </p>
      <p>
        Unfortunately, there is not an integrative framework that
guides organizations to achieving information quality goals
through management by implementing the
abovementioned concepts [
        <xref ref-type="bibr" rid="ref14 ref23">14, 23</xref>
        ]. In spite of the fact that some
researches have provided several information quality
measurements and/or assessment methodologies [
        <xref ref-type="bibr" rid="ref30 ref33 ref40">7 19, 30,
33, 40</xref>
        ], none of them are focused on group efforts or
commitments extending to the entire organization in both
analytic and pragmatic ways [
        <xref ref-type="bibr" rid="ref9">9</xref>
        ]. What is required is to know
how an organization works, and to develop the ability to
identify major problems or standardize an information
quality culture by implying both leaders and infrastructure
[
        <xref ref-type="bibr" rid="ref15 ref20">15, 20</xref>
        ] in technical and management tasks.
      </p>
      <p>
        In an effort to fill this void, we propose an integrative
framework in which information is considered as a product
(what allows the user to take an engineering point of view
of information quality [
        <xref ref-type="bibr" rid="ref23 ref4">4, 23</xref>
        ]) and taking into account the
Software Process definition given by [
        <xref ref-type="bibr" rid="ref12">12</xref>
        ] (what allows the
identification of who is doing what, when, using which
resources and how), a perception of both Information
Management and Information Quality Management activities
can be created as an Information Management Process
(IMP). An IMP is intended to model what how information
quality might be managed by drawing the relationship
among the main components of the Information Systems.
      </p>
      <p>
        Having in mind this perception, entire organizational
information quality can be managed by assessing and im- information quality in organizations. By optimizing the
proving each IMP in organization taking into account that most important and critical IMPs, an organization can reach
several IMP can share several resources. It is true there are a satisfactory information quality state.
several frameworks for assessing and improving software The remainder of this paper is structured as follows: section
processes such as CMM (Capability M [
        <xref ref-type="bibr" rid="ref20 ref31">20, 31</xref>
        ], CMMI [
        <xref ref-type="bibr" rid="ref35">35</xref>
        ], 2 describes CALDEA; section 3 presents a brief summary of
ISO 9001 [
        <xref ref-type="bibr" rid="ref5">5</xref>
        ], BootStrap [
        <xref ref-type="bibr" rid="ref3">3</xref>
        ] and SPICE [
        <xref ref-type="bibr" rid="ref21">21</xref>
        ]; but none of EVAMECAL. Section 4 shows the results of applying
them have focused on information quality nor have they EVAMECAL to a specific kind of organization. Lastly, some
even taken it into account. conclusions and futures lines of research related to the
In [
        <xref ref-type="bibr" rid="ref9">9</xref>
        ] four conditions for a good information quality model are explained.
framework are established :
1. irtiashacocuolrddpinrgovtoidwehaicshysitnefmoramtiactaionndccaonnbceiseevsaeltuoaftecdr.ite- 2 CALDEA: AN INFORMATION QUALITY MODEL
2. it should provide a scheme to analyze and solve infor- BASED ON MATURITY LEVELS
mation quality problems. CALDEA defines five information quality maturity levels
3. it should provide the basis for information quality for an IMP: Initial, Definition, Integration, Quantitative
measurement and proactive management. Management and Optimizing. The levels are ordered by
4. it should provide the research community with a con- taking into account several information quality goals and
ceptual map that can be used to structure a variety of their relative importance, providing a systematic and
conapproaches, theories, and information quality related cise set of criteria according to which information can be
phenomena. evaluated. Thus, at higher levels where more information
Our proposal defines two main components: quality issues are assured, it would be possible to state that
• An information quality model based on maturity more organizational requirements are satisfied. It is also
staged levels, known as CALDEA, which main aim is possible to affirm that the higher the information quality
to coordinate the relationships among the IMP’s com- maturity levels an organization has reached for its most
ponents by creating several growing maturity levels important IMPs, the more competitive this organization can
with growing information quality goals and require- be due to the absence of information quality problems. The
ments. For each level, several Key Processes Areas levels are drawn like the staged ones of CMMI, because it
(KPA) are described proposed. These KPAs are fo- appears to be easier to work with a well-defined sequence
cused on management and technical issues. For each of improvements (which cover from basic management
KPA, some tools, techniques, standards, and practices project fundamentals to complex data quality management
and metrics as required, are proposed, but not im- issues). As previously explained, for each level, CALDEA
posed, although due to length restrictions they are not addresses specific KPAs, which meet specific information
included in this paper. quality goals. These KPAs are focused on not only technical
• An assessment and improvement methodology, but also managerial issues, providing the basis for
informaknown as EVAMECAL, in the style of CBA-IPI [
        <xref ref-type="bibr" rid="ref6">6</xref>
        ], tion quality measurement and management and integrating
SCAMPI [
        <xref ref-type="bibr" rid="ref34">34</xref>
        ] or SPICE [
        <xref ref-type="bibr" rid="ref22">22</xref>
        ] which consists of a set of both aspects in order to compensate the lack of integrative
steps that provides a basis for data/information quality frameworks mentioned in the introductory section. Each
measurement and proactive management. The main KPA has been divided into activities and tasks, which can
element is a set of questionnaires for assessment and a be satisfied by using several techniques, practices and tools
rule system for identifying the path to improvement in order to transform a set of incoming products into other
based on the results of this assessment. outgoing ones. In order to make the framework as
univerThis structure satisfy the [
        <xref ref-type="bibr" rid="ref9">9</xref>
        ]’s four conditions: as CAL- sal and general as possible, none of the techniques,
pracDEA is structured in maturity levels with KPAs, a system- tices and tools are mandatory as previously mentioned, but
atic and concise set of criteria for information quality as- organizations must choose the best suited to each KPA on
sessment is provided, satisfying the first condition. By de- their own. We should emphasize that the chosen KPAs are
fining KPAs for each level, some of which are focused on based on CMMI’s KPAs [
        <xref ref-type="bibr" rid="ref35">35</xref>
        ] and the chosen activities and
management issues, the basis for proactive management tasks on our experiences with industrial and scientific
iniand measurements is provided, satisfying the third condi- tiatives regarding information quality, which have been the
tion. And finally, by being structured in such staged levels main rationale for their choice. Anyway, the contents of this
describing KPAs and proposing (not imposing) tools, tech- research paper are in continuous progress in order to
niques, and standards, a conceptual map has been provided achieve theoretical validation. In the other hand and, due to
for the research community in order to address a variety of paper length restrictions, neither techniques nor tools will
approaches, theories and information quality related phe- be looked at in detail
nomena, satisfying the fourth condition. On the other hand,
EVAMECAL provides a schema for analyzing and solving 2.1 Initial Level
information quality problems, satisfying the second condi- An IMP is said to be at Initial Level when no efforts are
tion. made in order to achieve any information quality goals.
      </p>
      <p>The main idea of the framework is to use EVAMECAL
for assessing and improving an IMP using CALDEA’s lev- 2.2 Definition Level
els as reference in the guidance of the optimization of the An IMP is said to be at Definition Level or Defined when it
has been defined and planned. This implies identifying all
its components and their relationship to the requirements.</p>
      <p>To achieve this goal, the following KPAs need to be
satisfied:
• (IQATM) Information Quality Assurance Team</p>
      <p>
        Management. The aim of this KPA is to form a team
composed of people having direct responsibility for
information and for its integrity. This team will
encourage the entire organization to take on
commitments regarding information quality policies [
        <xref ref-type="bibr" rid="ref2">2</xref>
        ] and
make corresponding efforts in order to support the
activities of this maturity model.
• (IPM) IMP Project Management. This is a
management KPA aimed at developing a plan for IMP in
order to coordinate both managerial and technical
efforts and elaborate all related documentation.
• (URM) User Requirements Management. User
Requirements must be collected and documented. Three
kinds of requirements might be identified: those
related to final product (URS), those related to IMP –
which must be gathered in the User Requirement
Specification for IMP document (URS-IMP) document
- and those related to Information Quality –which
must be gathered in the Information Quality User
Requirements Specification (URS-IQ).
• (DSTM) Data Sources and Data Targets
Management. Due to the intrinsic characteristics of data, both
data sources and targets must be identified and
documented, in order to avoid problems like uncontrolled
data redundancy or problems with data format
interchange [
        <xref ref-type="bibr" rid="ref28">28</xref>
        ].
• (ADMPM) Database or Data Warehouse
Acquisition, Development or Maintenance Project
Management. In order to improve information quality, it
is highly recommendable to draw up a project for
acquisition, development or maintenance of a database
or a data warehouse management system, supporting
both URS-IQ and URS-IMP.
• (IQM) Information Quality Management in IMP
      </p>
      <p>
        Components. For each information quality
component, information quality dimensions from URS-IQ
must be identified, controlled and monitored. It is
necessary to identify from the URS-IQ the dimensions
of quality of information that must be controlled [
        <xref ref-type="bibr" rid="ref19">19</xref>
        ],
as well as the metrics adapted for each one of those
dimensions [
        <xref ref-type="bibr" rid="ref23 ref32">23, 32</xref>
        ].
      </p>
      <sec id="sec-1-1">
        <title>2.3 Integration Level</title>
        <p>
          An IMP is said to be at Integration Level or Integrated
when besides having been Defined (Definition level has
been achieved), many efforts are made in order to assure
that the IMP is in compliance with organizational
information quality requirements and standards. This implies
standardizing different information quality learned lessons in
order to avoid previous errors and improve future work..
The following KPAs must be satisfied:
• (VV) Information Products and IMP Components
Validation and Verification. Both information
products (obtained as a result of data transformation
process) and IMP components must be verified and
validated to correct defects and/or discord with the
USRIMP, USR-IQ and the organizational information
quality policies.
• (RM) Risk and Poor Information Quality Impact
Management. Authors like [
          <xref ref-type="bibr" rid="ref7">7</xref>
          ] affirm that it is
necessary to determine the impact of risks due to the poor
quality of information in the IMP in order to limit
them at organizational level.
• (IQSM) Information Quality Standardization
Management. All lessons learned through specific
experiences should be properly gathered, documented and
transmitted to all new people who are going to be
part of an IMP. Thus, IMP performance will be higher
than it would otherwise be.
• (OIQPM) Organizational Information Quality
Policies Management. The means by which all the efforts
previously mentioned can be implemented, consisting
of defining policies of information quality based on
the previously defined standards affecting not only
single IMPs, but also the whole organization.
        </p>
      </sec>
      <sec id="sec-1-2">
        <title>2.4 Quantitative Management</title>
        <p>
          An IMP is said to be at a Quantitative Management Level
or quantitatively managed when after having been
Integrated (Integration level has been achieved) several
Measurement Plans have been developed and implemented and
measurement procedures have been automated. Therefore,
the main information quality goal of this level is to obtain a
quantitative compliance that IMP performance over a
reasonable time period, remains as consistent as required in
terms of variation and stability through a reliable set of
measurements [
          <xref ref-type="bibr" rid="ref11">11</xref>
          ] of information quality characteristics of
IMP. This level is composed of the following KPA:
• (MM) IMP Measurement Management. Since
metrics about IMP components have been drawn up at
definition level, the aim of this KPA is to define when
and how to make the measurements and how to
represent the results and to whom. These metrics are
used to check conformity to specifications [
          <xref ref-type="bibr" rid="ref15 ref24">15, 24</xref>
          ]
• (AMP) IMP Measurement Plan Automation
Management. In order to increase the reliability and
repeatability of measures, measurement procedures
must be automated as required by [
          <xref ref-type="bibr" rid="ref18">18</xref>
          ]. This KPA
aims to study all the issues related to the automation
of these management procedures.
        </p>
      </sec>
      <sec id="sec-1-3">
        <title>2.5 Optimizing Level</title>
        <p>An IMP is said to be at Optimizing Level if when being
quantitatively managed the obtained measurements are
used to develop a continuous improvement by eliminating
defects or by proposing and implementing several
improvements. The following two KPAs must be satisfied:
• (CADPM) Causal Analysis for Defect Prevention
Management. From the study of the measurement
results, some typical quality techniques and tools like
Statistical Control Process (SPC) or Ishikawa’s
diagrams can be applied to detect defects of information
quality and identify their root causes. The obtained
conclusions must form a basis for a corresponding
maintenance process for removing detected defects in
affected resources.
• (IODM) Innovation and Organizational
Development Management. Similarly to the previous KPA,
here the results can be used to improve the IMP, in
terms of performance, planned time or budget. This is
the basis for the idea of continuous improvement.</p>
      </sec>
      <sec id="sec-1-4">
        <title>2.6 Achieving higher levels of CALDEA</title>
        <p>In the proposed framework, a KPA can be in one of these
states: {“Fully Satisfied”, “Satisfied”, “Partially Satisfied” and
“Not Satisfied”}. An information quality maturity level is
said to be achieved when all contained KPAs are at least
“Satisfied”, that is to say, in order to achieve higher levels of
CALDEA, the Information Quality Management Team
must guide an IMP to the “Satisfied” state of all contained
KPA for the lower level. This goal can be achieved by
applying the assessment and improvement methodology,
which is next described.
3</p>
      </sec>
    </sec>
    <sec id="sec-2">
      <title>EVAMECAL: AN ASSESSMENT AND IMPROVEMENT METHODOLOGY</title>
      <p>As previously mentioned, an assessment and
improvement methodology is required in order to guide
organizations to reach higher information quality maturity levels for
each IMP. Basically, the methodology consists of a PDCA
cycle. The following is a brief summary of the steps to be
taken:
1.
2.
3.</p>
      <p>Choose an IMP which needs to be optimized
Elaborate a Plan for its assessment.</p>
      <p>Execute the assessment plan by conducting the
surveys and measuring as required. (see section 3.1
where a set of surveys are described)
4. Analyze the results and elaborate an Improvement</p>
      <p>Plan.
5. Study the viability of the Improvement Plan and the
solution.
6. Execute the Improvement Plan.
7. Confirm the improvements and obtain and
standardize conclusions.</p>
      <p>As demonstrated in this document, the numbering for
sections upper case Arabic numerals, then upper case Arabic
numerals, separated by periods. Initial paragraphs after the
section title are not indented. Only the initial, introductory
paragraph has a drop cap.</p>
      <sec id="sec-2-1">
        <title>3.1 The surveys</title>
        <p>For the assessment process, a set of surveys has been
elaborated. This set consists of four different classes of
questionnaires, with different goals:
A. In order to delimit and characterize the organization, a
total of fifteen questions.</p>
        <p>B. In order to delimit and characterize the IMP to be
assessed, a total of six questions.</p>
        <p>C. In order to assess the degree of achievement of each
maturity level, several questions organized in different
and selective blocks have been developed. The
questions are focused on the KPAs, activities, tasks,
proposed techniques, tools and practices and required
developed products. The idea of organizing the
questionnaire in several depth levels is so that questions will be
asked from top down and only if necessary. Thus, the
block of questions of the first depth level serves to
evaluate if KPAs are satisfied or not, avoiding at this
depth level other questions which are not important for
establishing specific aspects about the accom-plishment
of the more specific issues, which are dealt with in
lower depth levels. So, if all the answers to the
questions of the first depth level differ from “Not Satisfied”,
then questions in the level immediately below should
be answered, and so on. Altogether one hundred and
ninety questions would be answered in the case of all
the answers to the questions of the first and the second
depth level differing from "Not Satisfied". On the other
hand, a maturity level of a given IMP can be achieved a
level only if the lower ones have been achieved. Table 1
gathers the number of questions made by each
maturity level and each depth level. Due to length
restrictions none of the questions are included in this paper. It
is important to say that we are working on checking
the validity and efficiency of each block and question
inside the blocks for each depth level. The answers to
these questions must be a number between 0 and 100,
in order to quantitatively assess the degree of
satisfaction for each task, activity and KPA. Thus, it is possible
to set a numeric qualification for each state by
calculating a weighted average of the obtained qualification in
each one of the KPAs for that level according to a
proposed weight given by a critically degree. In the
proposal, it has been established that if this qualification is
between 0 and 20, the KPA is said to be “Not Satisfied”;
if it is between 20 and 60 is said to be “Partially
Satisfied”; if it is between 60 and 90 it is said to be “Satisfied”;
otherwise it is said to be “Fully Satisfied”. Table 2 shows
in the first column the KPA of each level of maturity
and in the second one, the degree of criticality of each
KPA for that level. The degrees of criticality also serve
as a criteria in order to choose which KPAs must be
satisfied first in the third step of EVAMECAL. These
degrees of criticality are a hypothesis according to the
supposed degree of importance. It is a line of future
research to determine these weights based on the
demands of the different organizations interviewed and
to set finely the ranges for qualification.</p>
        <p>D. Finally, in order to collate and compare the answers
with previous questionnaires, there is a last block of
questions with descriptive and textual language.</p>
        <p>The surveys are going to be conducted at assessment
time.</p>
      </sec>
    </sec>
    <sec id="sec-3">
      <title>4 EXPERIENCES APPLYING THE FRAMEWORK.</title>
      <p>In order to empirically validate the framework and test
its practical applicability and efficiency, it has been applied
to different IMPs from several organizations. The following
shows the results obtained from applying the framework to
a particular organization with proven experience in the
information management field. EVAMECAL was first
applied by following the steps previously detailed. The results
of questionnaires A and B are presented in subsection 4.1
and 4.2; in 4.3 the results of questionnaire C and a list of
proposed improvements are presented. Since finishing this
paper, the organization has continued working on the
improvement plan, although several subgoals have already
been achieved.</p>
      <sec id="sec-3-1">
        <title>4.1 Characterization of the company</title>
        <p>The main activity of the company is software
development with a solid knowledge of and training in software
quality standards and Software Engineering (all the
developments are carried out by following one of the most
important and widely used national software development
methodologies). The company has obtained an ISO 9000
certification. Their offered services are consulting,
development, training courses, technical attendance, sale of
licenses, database and data warehouse administration,
system planning projects and migration to an important
commercial DBMS (e.g. Oracle of which they are certified
partners). With a total of eighty-nine employees, it is the
eighteen of the department of systems who organize the
resources of computing support for the rest of the
departments.</p>
      </sec>
      <sec id="sec-3-2">
        <title>4.2 Characterization of studied IMP</title>
        <p>Among all the IMPs, the framework was applied to that
related to the Training Management Process, which is a
responsibility of the consulting department. The main goal
of the IMP in question is to manage data regarding training,
which consists of gathering both internal and external
requests for training, choosing who are going to be the
trainers, determining which resources are going to be used and
managing several quality training issues This process is
adequately specified and documented in the quality
manual of the organization.</p>
        <p>Some different forms exist for gathering data about course
demands, assignations and quality evaluations of proposed
exercises, didactic materials, trainer capability, installations,
assistance and used resources.</p>
        <p>The organization runs a software application, which is an
internally developed tool to manage all previously
mentioned data. One of the employees of the consulting
department, normally always the same one, is responsible for
transcribing data from the forms to the tool and for
obtaining the information, which will be given to the adequate
person.</p>
      </sec>
      <sec id="sec-3-3">
        <title>4.3 Assessment and Improvement of the IMP.</title>
        <p>All the questions in the surveys were made to the head of
the consulting department. In table 3 the main results of
these surveys can be found. These results reflect that none
of the KPAs belonging to level 2 or higher are at least
“Satisfied”. This means that the Definition level is at a “Not
Achieved” state. As an example, the conclusions drawn are
included:
• (IQATM) Information Quality Assurance Team
Management. In spite of not properly satisfying this KPA, the
organization presents a quality infrastructure that can
adequately support information quality.
• (IPM) IMP Project Management. This KPA is also not
satisfied.
• (URM) User Requirements Management. User
Requirements have been managed for the training
procedures, although information quality requirements
have not been taken into account.
• (DSTM) Data Sources and Data Targets Management. In
the IMP definition, both data sources and data
product targets are identified and documented. There are
some forms in order to standardize data interchange
formats.
• (ADMPM) Database or data warehouse Acquisition,
development or maintenance Project Management. The
database where data is stored is an organizational one
adequately modified to support the training
managerial software tool. Thus, data and procedure models
were modified and extended, although none of the
information quality issues were considered.
• (IQM) Information Quality Management in IMP
Components. This KPA has not been satisfied because
information quality is not one of the goals of the IMP.
Taking into account the criticality degree of each of the
KPAs (see table 2) the following recommendations were
proposed in order to satisfy KPAs at Definition level:
1. Create an Information Quality Assurance Team
which assumes the responsibility of IMP project
management
2. Adequately manage user requirements, both IMP
and IQ ones.
3. Identify and define both data sources and data
product targets, as well as the data interchange formats.
4. From these requirement specifications, adequately
manage the information quality dimensions for each
component of the system
5. Modify database or data warehouse to give support
to the information quality
6. Plan a project for the development of the IMP.
Definition Level Not Achieved
(IQATM) Information Quality Assurance Not Satisfied
Team Management
(URM) User Requirements Management. Not Satisfied
(DSTM) Data Sources and Data Targets Partially Satisfied
Management.
(ADMPM) Database or data warehouse
Acquisition, development or maintenance Partially Satisfied
Project Management
i(nIQIMM)PICnfoomrmpoantieonntsQ. uality Management Not Satisfied
Integration Level Not Achieved
(CVoVm)poInnefonrtsmVaatiloidnatiPornoadnudctVseraifnicdatioIMn.P Not Satisfied
(RM) Risk and Poor Information Quality Not Satisfied
Impact Management
t(iIoQnSMM)anInagfoermmeanttion Quality Standardiza- Not Satisfied
(OIQPM) Organizational Information Not Satisfied
Quality Policies Management
Cuantitative Management Level Not Achieved
(MM) IMP Measurement Management Not Satisfied
t(iAoMnMP)anIMagPemMeenats.urement Plan Automa- Not Satisfied
Optimizing Level Not Achieved
(PCreAvDenPtMio)n MCaaunsaaglemAennatlysis for Defects Not Satisfied
(DI OevDeMlop)mInenntoMvaatinoangemanednt.Organizational Not Satisfied</p>
      </sec>
    </sec>
    <sec id="sec-4">
      <title>5 CONCLUSIONS AND FUTURE WORK</title>
      <p>In this paper, an integrative framework for assessing and
improving information quality for organizations has been
briefly presented, and one experience of applying this
framework has been described. The framework consist of
two main components: CALDEA, an information quality
model based on maturity levels which serves as references
when assesing and guidance when improving; both
activities, assessement and improvement are supported by the
second component, EVAMECAL.</p>
      <p>
        On one hand, the IMP concept with both CALDEA and
EVAMECAL satisfies the four goals required for a good
information quality framework [
        <xref ref-type="bibr" rid="ref9">9</xref>
        ]:
1. CALDEA provides a systematic and concise set of
criteria for information quality according to which
information can be evaluated.
2. EVAMECAL provides a schema for analyzing and
solving information quality problems
3. Some KPAs in CALDEA provide the basis for
information quality measurement and proactive
management.
4. CALDEA is by itself a conceptual map that can be
used to structure a variety of approaches, theories
and information quality related phenomena since
KPA does not propose a closed set of tools,
techniques and methodologies.
      </p>
      <p>On the other hand, the experience of applying the
framework to real case studies has allowed both CALDEA
and EVAMECAL to be refined and has demonstrated that
although it is known that information quality is becoming
increasingly important, organizations do not have or do not
provide enough time or resources to deal with it. This fact
is aggravated by the lack of an information quality
enterprise culture.</p>
      <p>Although the presented framework is becoming more
widely used much work has to be done, beginning with a
validation of both models, all the questionnaires of the
surveys, and the criticality degrees for each KPA. Another line
of work being pursued, consists of choosing (or even
developing when they do not exist) some standards, practices,
techniques and tools in order to satisfy the majority of the
information quality requirements for the majority of the
organizations.</p>
    </sec>
    <sec id="sec-5">
      <title>ACKNOWLEDGMENT</title>
      <p>This research is part of both CALIPO- supported by
Dirección General de Investigación of the Ministerio de Ciencia y
Tecnología (TIC2003-07804-C05-03)- and MESSENGER
project - supported by Consejería de Ciencia y Tecnología de la
Junta de Comunidades de Castilla-La Mancha
(PCC-03-0031).</p>
    </sec>
  </body>
  <back>
    <ref-list>
      <ref id="ref1">
        <mixed-citation>
          [1]
          <string-name>
            <surname>Ballou</surname>
            <given-names>D.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Wang</surname>
            <given-names>R.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Pazer</surname>
            ,
            <given-names>H.</given-names>
          </string-name>
          , and
          <string-name>
            <surname>Tayi</surname>
            ,
            <given-names>G.K.</given-names>
          </string-name>
          “
          <article-title>Modeling Information Manufacturing Systems to Determine Information Product Quality”</article-title>
          .
          <source>Management Science</source>
          <volume>44</volume>
          (
          <issue>4</issue>
          ),
          <year>1998</year>
          , Pp.
          <fpage>462</fpage>
          -
          <lpage>484</lpage>
        </mixed-citation>
      </ref>
      <ref id="ref2">
        <mixed-citation>
          [2]
          <string-name>
            <surname>Ballou</surname>
            ,
            <given-names>D.</given-names>
          </string-name>
          and
          <string-name>
            <surname>Tayi</surname>
            ,
            <given-names>G.K.</given-names>
          </string-name>
          “
          <article-title>Enhancing data quality in Data Warehouse Environments”</article-title>
          .
          <source>Communications of the ACM</source>
          ,
          <year>January 1999</year>
          / Vol 42,
          <string-name>
            <surname>No</surname>
            <given-names>I.</given-names>
          </string-name>
        </mixed-citation>
      </ref>
      <ref id="ref3">
        <mixed-citation>
          [3]
          <string-name>
            <surname>Bicego</surname>
            ,
            <given-names>A.</given-names>
          </string-name>
          , and
          <string-name>
            <surname>Kuvaja</surname>
            ,
            <given-names>D.</given-names>
          </string-name>
          “Bootstrap”,
          <string-name>
            <surname>Europe's Assesment</surname>
            <given-names>Method</given-names>
          </string-name>
          , IEEE Software,
          <year>1993</year>
          , Pp.
          <fpage>93</fpage>
          -
          <lpage>95</lpage>
          .
        </mixed-citation>
      </ref>
      <ref id="ref4">
        <mixed-citation>
          [4]
          <string-name>
            <surname>Bobrowski</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Marré</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Yankelevich</surname>
            ,
            <given-names>D. “</given-names>
          </string-name>
          <article-title>A software Engineering View of Data Quality”</article-title>
          .
          <source>Proceedings of Second International Software Quality in Europe. Belgium. November</source>
          <year>1998</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref5">
        <mixed-citation>
          [5]
          <string-name>
            <surname>Coallier</surname>
            ,
            <given-names>F.</given-names>
          </string-name>
          “
          <article-title>How ISO 9001 fits into the software world”</article-title>
          ,
          <source>IEEE Software. January</source>
          <year>1994</year>
          , pp
          <fpage>98</fpage>
          -
          <lpage>100</lpage>
        </mixed-citation>
      </ref>
      <ref id="ref6">
        <mixed-citation>
          [6]
          <string-name>
            <surname>Dunaway</surname>
            ,
            <given-names>D. K.</given-names>
          </string-name>
          <article-title>CMM SM -Based Appraisal for Internal Process Improvement. (CBA IPI) Lead Assessor's Guide (CMU</article-title>
          /SEI-96
          <string-name>
            <surname>-</surname>
          </string-name>
          HB-003). Software Engineering Institute, Carnegie Mellon University, Pittsburgh,
          <year>1996</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref7">
        <mixed-citation>
          [7]
          <string-name>
            <surname>English</surname>
            ,
            <given-names>L.P.</given-names>
          </string-name>
          <string-name>
            <surname>Improving</surname>
          </string-name>
          <article-title>Data Warehouse and Business Information Quality: Methods for reducing costs and increasing Profits</article-title>
          . Willey &amp; Sons,
          <year>1999</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref8">
        <mixed-citation>
          [8]
          <string-name>
            <surname>Eppler</surname>
            ,
            <given-names>M.J.</given-names>
          </string-name>
          (
          <year>2001</year>
          ) “
          <article-title>Increasing Information Quality through Knowledge Management Systems Services”</article-title>
          .
          <source>Proceedings of the 2001 International Symposium on Information System and Engineering (ISE'01) June</source>
          <volume>25</volume>
          -28,
          <year>2001</year>
          . Las Vegas, Nevada, USA
        </mixed-citation>
      </ref>
      <ref id="ref9">
        <mixed-citation>
          [9]
          <string-name>
            <surname>Eppler</surname>
            ,
            <given-names>M.J.</given-names>
          </string-name>
          and
          <string-name>
            <surname>Wittig</surname>
            ,
            <given-names>D.</given-names>
          </string-name>
          “
          <article-title>Conceptualizing Information Quality: A review of Information Quality Frameworks from the last ten years</article-title>
          .
          <source>” Proceedings of the 2000 Conference on Information Quality. Pp 83-96</source>
        </mixed-citation>
      </ref>
      <ref id="ref10">
        <mixed-citation>
          [10]
          <string-name>
            <surname>Firth</surname>
            ,
            <given-names>C.M.</given-names>
          </string-name>
          and
          <string-name>
            <surname>Wang</surname>
          </string-name>
          , R. “
          <article-title>Closing the data quality gap: using ISO 9000 to study data quality. TDQM working paper. Data Quality Research: A framework, survey and analysis</article-title>
          (TDQM-93-03)”
          <article-title>Total Data Quality Management (TDQM) Research Program</article-title>
          , MIT Sloan School of Management, April 1993
        </mixed-citation>
      </ref>
      <ref id="ref11">
        <mixed-citation>
          [11]
          <string-name>
            <surname>Florac</surname>
            ,
            <given-names>W</given-names>
          </string-name>
          , A.and
          <string-name>
            <surname>Carleton</surname>
            ,
            <given-names>A.D.</given-names>
          </string-name>
          “
          <article-title>Using Statistical Process Control to Measure Software Process”</article-title>
          .
          <source>In Fundamental Concepts for the Software Quality Engineer. Taz Daughtrey Editor. American Society for Quality</source>
          .
          <source>2002</source>
        </mixed-citation>
      </ref>
      <ref id="ref12">
        <mixed-citation>
          [12]
          <string-name>
            <surname>Fuggeta</surname>
            ,
            <given-names>A.</given-names>
          </string-name>
          “
          <article-title>Software Process: A roadmap. The future of Software Engineering”</article-title>
          , ed. A.
          <string-name>
            <surname>Finkelstein</surname>
            <given-names>ACM</given-names>
          </string-name>
          , Press,
          <year>2000</year>
          , pp.
          <fpage>27</fpage>
          -
          <lpage>34</lpage>
          .
        </mixed-citation>
      </ref>
      <ref id="ref13">
        <mixed-citation>
          [13]
          <string-name>
            <surname>Genero</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          and
          <string-name>
            <surname>Piattini</surname>
            ,
            <given-names>M. “</given-names>
          </string-name>
          <article-title>Quality in conceptual Modelling”</article-title>
          .
          <source>In Information and Database Quality</source>
          . Kluwer Academic Publishers.
          <year>2002</year>
          . Pp.
          <volume>13</volume>
          -
          <fpage>44</fpage>
        </mixed-citation>
      </ref>
      <ref id="ref14">
        <mixed-citation>
          [14]
          <string-name>
            <surname>Giannoccaro</surname>
            ,
            <given-names>A.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Shanks</surname>
            ,
            <given-names>G.</given-names>
          </string-name>
          , and
          <string-name>
            <surname>Darke</surname>
          </string-name>
          , P. Stakeholder “
          <article-title>Perceptions of Data Quality in a Data Warehouse environment”</article-title>
          .
          <source>In Proceedings of 10th Australasian Conference on Information System</source>
          . (
          <year>1999</year>
          )
          <article-title>Pp 344-355</article-title>
        </mixed-citation>
      </ref>
      <ref id="ref15">
        <mixed-citation>
          [15]
          <string-name>
            <surname>Grimmer</surname>
            ,
            <given-names>U.</given-names>
          </string-name>
          , and
          <string-name>
            <surname>Hinrichs</surname>
          </string-name>
          , H. “
          <article-title>A methodological approach to data quality management supported by data mining”</article-title>
          .
          <source>Proceedings of the Sixth International conference on Information Quality</source>
          .
          <source>2001 Pp 217-232</source>
        </mixed-citation>
      </ref>
      <ref id="ref16">
        <mixed-citation>
          [16]
          <string-name>
            <surname>Helfert</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          , and
          <string-name>
            <surname>von Maur</surname>
          </string-name>
          , E. “
          <article-title>A Strategy for managing data quality in data warehouse systems</article-title>
          .
          <source>Proceedings of the Sixth International Conference on Information Quality</source>
          .
          <year>2002</year>
          . Pp 62-
          <fpage>76</fpage>
        </mixed-citation>
      </ref>
      <ref id="ref17">
        <mixed-citation>
          [17]
          <string-name>
            <surname>Hinrichs</surname>
            ,
            <given-names>H.</given-names>
          </string-name>
          “
          <article-title>CLIQ- Inteligent Data Quality Management”</article-title>
          .
          <source>Proceedings of the fourth IEEE international Baltic Workshop on databases and Information System</source>
          . (
          <year>2000</year>
          )
        </mixed-citation>
      </ref>
      <ref id="ref18">
        <mixed-citation>
          [18]
          <string-name>
            <surname>Hinrichs</surname>
            ,
            <given-names>H.</given-names>
          </string-name>
          <article-title>and</article-title>
          <string-name>
            <surname>Aden</surname>
            ,
            <given-names>T.</given-names>
          </string-name>
          “
          <article-title>An ISO 9001:2000 compliant quality management System for Data Integration in Data Warehouse System”</article-title>
          .
          <source>Proceedings of the International Workshop on Design and Management of Data Warehouse (DMDW'2001) Interlaken</source>
          , Switzerland, June 4, 2001
        </mixed-citation>
      </ref>
      <ref id="ref19">
        <mixed-citation>
          [19]
          <string-name>
            <surname>Huang</surname>
            ,
            <given-names>K.T.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Lee</surname>
            ,
            <given-names>Y.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Wang</surname>
            ,
            <given-names>R. Quality</given-names>
          </string-name>
          <string-name>
            <surname>Information</surname>
          </string-name>
          and Knowledge. Prentice Hall, Upper Saddle River,
          <year>1999</year>
        </mixed-citation>
      </ref>
      <ref id="ref20">
        <mixed-citation>
          [20]
          <string-name>
            <surname>Humphrey</surname>
            ,
            <given-names>W. Managing</given-names>
          </string-name>
          <article-title>the software process</article-title>
          , Addison - Wesley, Reading Mass.,
          <year>1989</year>
        </mixed-citation>
      </ref>
      <ref id="ref21">
        <mixed-citation>
          [21]
          <string-name>
            <given-names>ISO</given-names>
            <surname>IEC 15504</surname>
          </string-name>
          <article-title>TR2:1998, part 2: A reference model for processes and process capability</article-title>
          ,
          <source>ISO/IEC JTC1/SC7</source>
          ,
          <year>1998</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref22">
        <mixed-citation>
          <source>[22] ISO IEC 15504 TR2:</source>
          <year>1998</year>
          ,
          <string-name>
            <given-names>Software</given-names>
            <surname>Process</surname>
          </string-name>
          Assessment -
          <article-title>Part 7 :Guide for use in process improvement</article-title>
          ,
          <source>ISO/IEC JTC1/SC7</source>
          ,
          <year>1998</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref23">
        <mixed-citation>
          [23]
          <string-name>
            <surname>Kahn</surname>
            ,
            <given-names>B.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Strong</surname>
            ,
            <given-names>D.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Wang</surname>
            ,
            <given-names>R.</given-names>
          </string-name>
          “Information Quality Benchmarks:
          <article-title>Product and Service Performance”</article-title>
          .
          <source>Communications of the ACM April</source>
          <year>2002</year>
          /Vol.
          <volume>45</volume>
          , No. 4
        </mixed-citation>
      </ref>
      <ref id="ref24">
        <mixed-citation>
          [24]
          <string-name>
            <surname>Kan</surname>
            ,
            <given-names>S.</given-names>
          </string-name>
          , “
          <article-title>Metrics and models” in Software quality engineering</article-title>
          .
          <source>Second Edition</source>
          . Addison - Wesley Ed.
          <year>2002</year>
        </mixed-citation>
      </ref>
      <ref id="ref25">
        <mixed-citation>
          [25]
          <string-name>
            <surname>Kim</surname>
            ,
            <given-names>W.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Choi</surname>
            ,
            <given-names>B.</given-names>
          </string-name>
          ,
          <source>“Towards Quantifying Data Quality Costs” in Journal of Object Technology</source>
          , Vol.
          <volume>2</volume>
          , no.
          <issue>4</issue>
          ,
          <string-name>
            <surname>July</surname>
            <given-names>-August</given-names>
          </string-name>
          <year>2003</year>
          . Pp.
          <volume>69</volume>
          -
          <fpage>76</fpage>
        </mixed-citation>
      </ref>
      <ref id="ref26">
        <mixed-citation>
          [26]
          <string-name>
            <surname>Lee</surname>
            ,
            <given-names>Y.W.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Strong</surname>
            ,
            <given-names>D.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Kahn</surname>
            ,
            <given-names>B.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Wang</surname>
            ,
            <given-names>R.</given-names>
          </string-name>
          “
          <article-title>AIMQ: a methodology for information quality assessment”</article-title>
          .
          <source>Information &amp; Management</source>
          , 2001
        </mixed-citation>
      </ref>
      <ref id="ref27">
        <mixed-citation>
          [27]
          <string-name>
            <surname>Liu</surname>
            ,
            <given-names>L.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Chi</surname>
            ,
            <given-names>L.N.</given-names>
          </string-name>
          “
          <article-title>Evolutional Data Quality : A theory-specific view”</article-title>
          .
          <source>Proceedings of the Seventh International Conference on Information Quality (ICIQ-02) 2002 Pp 292-304</source>
        </mixed-citation>
      </ref>
      <ref id="ref28">
        <mixed-citation>
          [28]
          <string-name>
            <surname>Loshin</surname>
            <given-names>D.</given-names>
          </string-name>
          <article-title>Enterprises Knowledge Management: The Data Quality Approach</article-title>
          . Morgan Kauffman, San Francisco (California),
          <fpage>2001</fpage>
        </mixed-citation>
      </ref>
      <ref id="ref29">
        <mixed-citation>
          [29]
          <string-name>
            <surname>Motha</surname>
            ,
            <given-names>W. M.</given-names>
          </string-name>
          and
          <string-name>
            <surname>Viktor</surname>
            <given-names>H.L.</given-names>
          </string-name>
          “
          <article-title>Expanding Organizational Excellence: The Interplay between Data Quality and Organizational Performance”</article-title>
          ,
          <source>International Conference on Systems, Cybernetics</source>
          and Informatics (SCI'
          <year>2001</year>
          ),
          <source>Orlando: USA, July 22-25</source>
          ,
          <string-name>
            <surname>Volume</surname>
            <given-names>XI</given-names>
          </string-name>
          ,
          <year>2001</year>
          , Pp.
          <fpage>60</fpage>
          -
          <lpage>65</lpage>
          .
        </mixed-citation>
      </ref>
      <ref id="ref30">
        <mixed-citation>
          [30]
          <string-name>
            <surname>Olson</surname>
            ,
            <given-names>J. E.</given-names>
          </string-name>
          <string-name>
            <surname>Data</surname>
          </string-name>
          <article-title>Quality: the accuracy dimension</article-title>
          . Ed. Morgan Kaufmann Publishers.
          <year>2003</year>
        </mixed-citation>
      </ref>
      <ref id="ref31">
        <mixed-citation>
          [31]
          <string-name>
            <surname>Paulk</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          ,
          <string-name>
            <given-names>C.</given-names>
            <surname>Weber</surname>
          </string-name>
          ,
          <string-name>
            <given-names>B.</given-names>
            <surname>Curtis</surname>
          </string-name>
          , and
          <string-name>
            <surname>Chrissis</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          <article-title>The Capability Maturity Model Guideline for Improving the software Process, Addison-</article-title>
          <string-name>
            <surname>Wesley</surname>
          </string-name>
          , Reading, Mass. 1995
        </mixed-citation>
      </ref>
      <ref id="ref32">
        <mixed-citation>
          [32]
          <string-name>
            <surname>Pipino</surname>
            ,
            <given-names>L.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Lee</surname>
            ,
            <given-names>Y.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Wang</surname>
            ,
            <given-names>R.</given-names>
          </string-name>
          “
          <source>Data Quality Assessment” Communications of the ACM April</source>
          <year>2002</year>
          /Vol.
          <volume>45</volume>
          , No. 4
        </mixed-citation>
      </ref>
      <ref id="ref33">
        <mixed-citation>
          [33]
          <string-name>
            <surname>Redman</surname>
          </string-name>
          , T.C.
          <article-title>Data Quality for the Information Age</article-title>
          . Artech House Publishers, Boston. 1996
        </mixed-citation>
      </ref>
      <ref id="ref34">
        <mixed-citation>
          [34]
          <string-name>
            <surname>Standard CMMI SM</surname>
          </string-name>
          <article-title>Appraisal Method for Process Improvement (SCAMPI SM)</article-title>
          ,
          <year>Version1</year>
          .1:
          <string-name>
            <given-names>Method</given-names>
            <surname>Definition</surname>
          </string-name>
          <article-title>Document</article-title>
          . CMU/SEI-2001
          <string-name>
            <surname>-</surname>
          </string-name>
          HB-001.
        </mixed-citation>
      </ref>
      <ref id="ref35">
        <mixed-citation>
          [35]
          <string-name>
            <surname>SEI. Capability Maturity</surname>
          </string-name>
          <article-title>Model® Integration (CMMISM), Version 1.1 CMMISM (CMMI-SE/SW</article-title>
          /IPPD/SS,
          <year>V1</year>
          .1)
          <string-name>
            <given-names>Staged</given-names>
            <surname>Representation</surname>
          </string-name>
          <string-name>
            <given-names>CMU</given-names>
            /SEI
            <surname>-</surname>
            2002-
          </string-name>
          TR-012
          <string-name>
            <surname>ESC-TR-</surname>
          </string-name>
          2002-012. en http://www.sei.cmu.edu/publications/ docments/02.reports/02tr00 2.
          <source>html (last access on June</source>
          <year>2004</year>
          )
        </mixed-citation>
      </ref>
      <ref id="ref36">
        <mixed-citation>
          [36]
          <string-name>
            <surname>Strong</surname>
            ,
            <given-names>D.M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Lee</surname>
            ,
            <given-names>Y. W.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Wang</surname>
            <given-names>R.Y.</given-names>
          </string-name>
          “
          <article-title>Data Quality in context”</article-title>
          .
          <source>Communications of the ACM. May</source>
          <year>1997</year>
          , pp
          <fpage>103</fpage>
          -
          <lpage>110</lpage>
        </mixed-citation>
      </ref>
      <ref id="ref37">
        <mixed-citation>
          [37]
          <string-name>
            <surname>Strong</surname>
            ,
            <given-names>D.M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Lee</surname>
            ,
            <given-names>Y. W.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Wang R</surname>
          </string-name>
          .Y. “
          <article-title>Ten potholes in the road to information quality”</article-title>
          .
          <source>IEEE Computer August</source>
          <year>1997</year>
          , pp
          <fpage>38</fpage>
          -
          <lpage>46</lpage>
        </mixed-citation>
      </ref>
      <ref id="ref38">
        <mixed-citation>
          [38]
          <string-name>
            <surname>Wand</surname>
            ,
            <given-names>Y.</given-names>
          </string-name>
          and
          <string-name>
            <surname>Wang</surname>
          </string-name>
          , R. “
          <article-title>Anchoring Data Quality Dimensions in Ontological Foundations”. Communica-tions of the ACM (CACM</article-title>
          ),
          <volume>39</volume>
          , (
          <issue>11</issue>
          ),
          <year>1996</year>
          . Pp 86-
          <fpage>95</fpage>
        </mixed-citation>
      </ref>
      <ref id="ref39">
        <mixed-citation>
          [39]
          <string-name>
            <surname>Wang</surname>
            ,
            <given-names>R.</given-names>
          </string-name>
          , “
          <article-title>A product perspective on data quality management”</article-title>
          .
          <source>Communications of the ACM. February 1998</source>
          Vol
          <volume>41</volume>
          (
          <issue>2</issue>
          )
          <fpage>pp58</fpage>
          -
          <lpage>65</lpage>
        </mixed-citation>
      </ref>
      <ref id="ref40">
        <mixed-citation>
          [40]
          <string-name>
            <surname>Wang</surname>
            ,
            <given-names>R.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Storey</surname>
            <given-names>V.C.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Firth</surname>
            ,
            <given-names>C. F.</given-names>
          </string-name>
          “
          <article-title>A framework for analysis of Data Quality Research”</article-title>
          .
          <source>IEEE Transactions on Knowledge and Data Engineering</source>
          , Vol
          <volume>7</volume>
          (
          <issue>4</issue>
          ). (
          <year>1995</year>
          ) Pp
          <fpage>623</fpage>
          -
          <lpage>640</lpage>
          .
        </mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>