        <article-title>Applying Social and Technical Topics in the Design of Management and Information Systems.</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>Paola Mauri</string-name>
          <email>paola.mauri@alice.it</email>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <aff id="aff0">
          <label>0</label>
          <institution>Senior consultant in System Management ICMCI Certified Management Consultant Star s.</institution>
          <addr-line>r.l - Via Piave 22060 Cabiate-</addr-line>
          <country country="IT">Italy</country>
        </aff>
      </contrib-group>
      <fpage>39</fpage>
      <lpage>49</lpage>
      <abstract>
        <p>The methodological topics proposed by Process Analysis, Social Behavior, Socio-technical perspective are often applied in my practitioner activities. Two experiences are presented. The first experience is running in government-owned company. The aim of the project is to develop a management system in conformity with the requirements of an international standard. The novelty is the implementation of this model in a public context constrained by several regulatory requirements. The methodological focus of this experience is on the role of the management model and the influence of the context. The second experience is running in a co-operative organization that provides caring services. The aim of this project is the updating of the organizational structure and the re-engineering of its processes, including the management of information. In this experience the Process Analysis and the Socio-technical approach have been widely applied. The lessons learned through the described experiences are presented to evaluate the effectiveness of the proposed methods. In addition the relationship between practitioner and his/her customer are explored with reference to the topics of an Ethnographic approach.</p>
      </abstract>
      <kwd-group>
        <kwd>Process Analysis</kwd>
        <kwd>Social Behavior</kwd>
        <kwd>Socio-technical Design</kwd>
        <kwd>Management System</kwd>
        <kwd>Information System</kwd>
        <kwd>Ethnographic Approach</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>-</title>
      <p>
        My practitioner activity is mainly oriented to the design of management systems in
conformity to several standards, in particular the standard ISO 9001 “Quality
Management Systems. Requirements” [
        <xref ref-type="bibr" rid="ref1">1</xref>
        ]. In these activities I have to understand the
organization and its context and to take into account and to integrate management
matters, technical matters and behavioral matters. My methodological framework
includes the Process Analysis that influences and is influenced by Social Behaviors [
        <xref ref-type="bibr" rid="ref2">2</xref>
        ].
      </p>
      <p>
        For the importance I assign to social concerns, I proposed in [
        <xref ref-type="bibr" rid="ref3">3</xref>
        ] that the topics of
the Socio-technical Design, described in [
        <xref ref-type="bibr" rid="ref4">4</xref>
        ], could be effectively merged with Process
Analysis in the development of management systems. Furthermore I think that the
behavioral concerns could be refined with the suggestions of the Ethnographic
Approach described in [
        <xref ref-type="bibr" rid="ref5">5</xref>
        ].
      </p>
      <p>In this paper I summarize the key topics of these methods and I describe two
experiences that I am following as a practitioner and where I am using these topics as a
conceptual framework.</p>
      <p>The first experience has been developed in a government-owned company and is
mainly focused on the role of the management model and the influence of the context.
The second experience is running in a co-operative organization that provides caring
services. This experience could be useful to describe a system where data and process
flows are crucial and where a Socio-technical approach has been successfully applied.</p>
      <p>The lessons learned drive the conclusion and the proposal for future research.
2</p>
    </sec>
    <sec id="sec-2">
      <title>Methodological topics</title>
      <p>The methodological framework that supports my practice encompasses several topics.
A short summary of these topics is described in the following, focusing on Process
Analysis, Socio-technical Design and Ethnographic Approach. They have been
progressively introduced in my methodological toolkit and applied in the described
experiences.
2.1</p>
      <sec id="sec-2-1">
        <title>Process Analysis</title>
        <p>
          From 2000, the Standard ISO 9001 introduced the process approach as a key
requirement of the quality management system. Since then, in implementing management
system, I have to develop Process Analysis for “understanding and managing
interrelated processes as a system” [
          <xref ref-type="bibr" rid="ref1">1</xref>
          ]. This practice allowed me to refine a method, in
particular for defining the conceptual coordinates that drives the analysis and to the
phases that drive the design.
        </p>
        <p>
          This long term experience moved my attention from the technicalities of the
process analysis to the social and behavioral characteristics that could influence the
organizations. I realized that the process analysis is ‘a two-way interaction between
processes and behaviors: practitioners need to take into account social behavior in
developing the analysis while analysis and modeling can influence and modify social
behavior’ [
          <xref ref-type="bibr" rid="ref2">2</xref>
          ].
        </p>
        <p>Presently, in my practitioner activities, the process analysis, developed for
obtaining the compliance to the requirement of the standard ISO 9001, is considered as a
useful way to understand and interact with the organizations and to support
involvement and participation.
2.2</p>
      </sec>
      <sec id="sec-2-2">
        <title>Socio-technical Design</title>
        <p>
          Recently, I found very interesting the approach of a Socio-technical Design described
in [
          <xref ref-type="bibr" rid="ref3">3</xref>
          ], which suggested to my practice challenging topics. I think that this approach,
conceived for information systems, could be applied to the design of any kind of
management system.
        </p>
        <p>In the Socio-technical approach I have identified several similarities with the
concerns of my practitioner activities: the idea that “technical structure and work roles are
both part of an inclusive system”, the attention on the environment and on the
adaptive systems, the social support designed to reinforce social behavior, the
incompletion of the design, conceived as an iterative process.</p>
        <p>
          For this reason, I proposed in [
          <xref ref-type="bibr" rid="ref4">4</xref>
          ] to merge Process Analysis and Socio-technical
Design, suggesting a method where the Process Analysis could be useful to define
criteria and phases and the Social approach could be useful to define principles and
values. In [
          <xref ref-type="bibr" rid="ref4">4</xref>
          ] I suggested that this approach has to deal with several challenging
topics. Some of them are summarized in the following.
• The objective of the design could be influenced by management models. For
instance, predefined management models enforce the role of their requirements in the
description of the processes while lean and adaptive approaches propose less
structured frameworks.
• The criteria for exploring the environment and developing the process analysis
could be influenced by the stakeholder’s point of view. For instance, for the
shareholder, the key characteristics of the process could be related to investment risk
while, for workers, to health and safety concerns.
• The concept of social could be wide. A clear definition of “who commits, who
designs, who practices” is fundamental for identifying the objective, the scope, the
interfaces, the internal and external subjects of the project team and hence the
required competences and attitudes.
• The relationship with incompletion and iteration could be crucial and it requires the
assumption of a never-ending approach. Continuous monitoring, for instance,
through process based audits and an in-depth check of several actual cases allows
testing and verifying the effectiveness of the results.
2.3
        </p>
      </sec>
      <sec id="sec-2-3">
        <title>Ethnographic Approach</title>
        <p>
          Last but not least, the Ethnographic Approach described in [
          <xref ref-type="bibr" rid="ref5">5</xref>
          ] suggests interesting
questions for the observation of social interaction. “The way the ethnographer is
introduced in the field, the way she talks and she behaves have significant effect on her
relationship towards the people in the field and the data the ethnographer will be able
to have access to.”
        </p>
        <p>The methods proposed by ethnography, in particular the reflexive position of the
ethnographer, the observer/participant positions and the insider/outsider perception
are applied in the requirements elicitation for information systems and I think that
they could be applied to design management systems and to investigate the
relationship between a practitioner and the organization.</p>
        <p>These topics suggested an interesting analysis on my behavior and on the
relationships between me and my customers. These relationships, often, could determine the
success or the failure of a project.
3</p>
      </sec>
    </sec>
    <sec id="sec-3">
      <title>Experience_1. The influence of the management model and of its relationship with the context</title>
      <p>With reference to the described methodological topics, the key features of this
experience are related to the influence of a prescriptive model that has to be transferred to a
context with a high level of complexity and a low level of adaptability.
3.1</p>
      <sec id="sec-3-1">
        <title>The project</title>
        <p>The context is a government-owned company where the top management responds to
an area of the government structure. The company statutory rules and the internal
code of conduct are constrained by the national and country laws of the Public
Administration. Furthermore, the governance is influenced by several political issues.</p>
        <p>One of the functional areas of this company has a department that performs
inspection services on the import/export of goods. The inspection process and its
practicalities, for instance the inspection methods, are established by national and international
regulatory requirements.</p>
        <p>
          On the basis of a law of the European Community (in development), the functional
area that performs inspections is required to become an inspection body compliant
with the Standard ISO/IEC 17020 [
          <xref ref-type="bibr" rid="ref6">6</xref>
          ]. This objective was assumed by the manager of
the functional area that performs inspection and it is the commitment of the project.
        </p>
        <p>To reach the conformity to the standard, the inspection area has to implement a
management model in accordance with its requirements of the organizational
structure, the operating procedures, the data recording, the employee competences, etc.</p>
        <p>One of the key requirements of the standard is the management of risk of
impartiality and independence and the analysis of the relationships that could influence the
impartiality (parent organization, departments within the same organization, related
companies, regulators, clients, personnel, etc.).</p>
        <p>In the project I was directly involved from the beginning, with the support of a
colleague. As practitioners, our responsibilities include: planning and leading the design
process, explaining the standard requirements and transferring them into the
organization. The outcome of our activities has been documented in a Quality Manual that
references organization chart, procedures, registration sheets, etc. This documentation
has to be evaluated by the Accreditation Body and its implementation audited on the
field.</p>
        <p>The first step of the project was a feasibility study (three months, a meeting every
week). This activity was performed by a project team, composed of the two
practitioners (myself and my colleague), the manager of the functional area (‘who commits,
who designs’), the manager of the inspection department and an internal coordinator
(‘who designs, who practices’). The team developed a gap analysis through the
comparison of the management models, in particular analyzing the rules of governance of
a public administration structure and the ISO/IEC standard requirements. The gap
analysis was exploited to measure the “distance” from the objective and hence to
define the project planning and the required resources.</p>
        <p>After the approval of the project and of its budget, the team started the activities. A
great effort of the analysis was devoted to the internal relationships that have been
redesigned for managing the risk of independence. For this objective, a new
organizational structure was discussed, defined and formally issued by the CEO of the
company. During this phase of the project (six months, a meeting every week) all the
processes were analyzed in the team and the inspection activities were observed on the
field. The information systems, that assist the inspection activities, were evaluated
too. They are outsourced, ‘not agile’ and centralized: a lot of time is required to
update/modify the applications.</p>
        <p>Following the accreditation rules, a detailed description of the whole functional
area, was produced, approved by the manager of the area and by the CEO. The
documentation describes the responsibilities and the methods exploited by the
management system. At the end of this phase the documentation was submitted, for
evaluation, to the Accreditation Body.</p>
        <p>At the same time, ‘outside’ of the project boundaries, the organizational structure
of the whole company was deeply revised by the CEO and a new organization chart
was issued. This organization seems not to fully guarantee the impartiality required by
the standard, in particular because the functional role of the manager of the inspection
area seems not to guarantee complete independence.</p>
        <p>Recently, the company received from the Accreditation Body the evaluation report:
the main remark was on the impartiality and it will be deeply discussed during the
next steps of the accreditation process.
3.2</p>
      </sec>
      <sec id="sec-3-2">
        <title>Methodological topics of the project</title>
        <p>Two aspects feature the environment of the government-owned organization: the
influence of political parties and the presence of legal requirements that lead the
governance. This kind of system is not ‘agile’ and has a low level of adaptability. The
ISO/IEC 17020 management standard, in turn, is very prescriptive. In this project the
management models are predefined, strongly structured and influenced by external
issues. Then the design process was strongly constrained by the compliance, with the
aim to modify and to adapt the context to the new requirements.</p>
        <p>The Socio-technical approach was applied in the team: practitioners and internal
members worked hard to understand environment, systems and objectives and to
share methods. For instance the risk of independence, not considered in the internal
risk management, was deeply analyzed and transferred in the new management
model.</p>
        <p>During the feasibility study the practitioners focused on the observation and on the
understanding of the context, while during the project development, their aim was to
define the new procedures and to support the implementation of the system.</p>
        <p>The awareness and the knowledge in the team changed during the project and the
members shared common points of view: the initial distance of the conceptual
coordinates of the team members was reduced. The system developed inside the boundaries
of the inspection area was consistent and compliant.</p>
        <p>Outside the boundaries of the inspection area, the project encountered several
problems. For instance, it was very difficult to involve the IT department and no
communication was established with the other functional area and with the top management.
3.3</p>
      </sec>
      <sec id="sec-3-3">
        <title>Results and Lesson learned</title>
        <p>With reference to the methodological topics some points of discussion are posed in
the following.</p>
        <p>The criteria followed for the analysis were strongly influenced by the standard
requirements on the management model, and then the analysis method was driven and
constrained by the prescriptions and by the context. The effort to match the
impartiality and independence requirements with company relationships and hence with the
organizational structure seemed fruitful but the changes in the organization and in the
internal responsibilities, determined by the executive board, nullified the result. A less
structured system could better adapt to the changes, but the context and the
commitment do not allow this choice.</p>
        <p>The Socio-technical Design was applied in the boundaries of the project, involving
the team and, partially, the employees that perform the inspection activities. But the
method was not extended to the other functional areas and the team had insufficient
attention of the changes running in the other organizational areas and in the board.</p>
        <p>The commitment influenced my relationship with the team: even during the
feasibility study. From an ethnographic point of view I was not a ‘pure observer’ because
the context was observed with the aim to modify it in accordance to a defined model.
The way I introduced in the field was effective, I was considered insider in the project
team and at the end of the development of the model I shared with the team member a
common design approach. But, as seen before, the field was influenced by external
issues that have not been considered and I had no opportunity to establish relationship
with the other people.</p>
        <p>The strength of the commitment of a manager could become a weakness, if the
internal responsibilities change because often an organization is a set of “ethnic
groups”.
4</p>
      </sec>
    </sec>
    <sec id="sec-4">
      <title>Experience 2. The role of process analysis and of the sociotechnical design</title>
      <p>The experience described in the following is an example of how a Socio-technical
approach could be positively applied to perform Process Analysis and to improve the
management system and the information system as well.</p>
      <p>In this case the design choices were not constrained by a model and hence a less
prescriptive commitment allows me and the team to freely develop the project.
4.1</p>
      <sec id="sec-4-1">
        <title>The project</title>
        <p>The context is a co-operative organization that provides caring services for young
people in need, for people suffering from physical and mental disability and for
elderly people. The co-operative has a broad distribution and rootedness in the local
territory, with relationship with several interested parties: care receivers, families,
communities and public structures. The co-operative is managed by a board of directors.
The activities are widespread on several territorial areas and hence the working places
are distributed on the territory. The employees are also “associates” of the
cooperative and the organization shares social values with the employees.</p>
        <p>As practitioner, I understood the complexity of this structure during a previous
project for the development of the quality management system, in compliance with ISO
9001 standard. The management system is running with good results, actually
improving the processes of caring services.</p>
        <p>A weak point of the systems is the functional area that manages the supporting
processes, such as financial and purchasing processes. The responsible retired and the
area suffers a lack of defined responsibilities. In particular the management of data
and information is ineffective: the co-operative had a previous negative experience
with the implementation of an information system that was not tailored on the internal
processes. Presently, most of the information are recorded on paper and copied in
several spreadsheets.</p>
        <p>The commitment of the board of directors is to update the organizational structure
and its responsibilities and to re-engineer the processes, including processes for
information management.</p>
        <p>The project group is composed by the director and by all the employee of the
functional area and by me. The project has been conceived with a Socio-technical
approach and based on the Process Analysis: the meeting has been held with the
participation of the director and all the employees.</p>
        <p>
          In this experience I act as a facilitator and my responsibility is relaxed. I attended
the meeting, tracking the discussion and the proposals and suggesting possible
solutions. The meetings developed through an initial brainstorming on all the activities,
listed and sketched on a board, without predefined model. The sketches has been
modelled in IDEF0 diagrams by myself and shared with all the team members for a
better understanding (see Fig.1). The discussion was worth to fix the critical points
and to discover the cross functional activities. As described in [
          <xref ref-type="bibr" rid="ref2">2</xref>
          ] the main result of
the orienteering has been “Getting people together”, also catching feelings and
relationships among employees.
        </p>
        <p>The project has been developed with the aim to share the practices: the changes
discussed during the meeting have been applied and tested during the everyday
activities. The process mapping facilitates the definition of a new functional organization
and the understanding of information requirements (see Fig.2). For instance the data
structure and the recording of job time were transferred in a spreadsheet template,
exploited by employees to record their hours and to define the communication rules
among the functional areas. The continuous monitoring allows testing and verifying
the effectiveness of the analysis results.</p>
        <p>The design phase of Process Analysis has been closed and presently the group is
testing the responsibilities and the processes also to define the requirements for the
new information system. The deadline of the project is fixed for the end of this year.</p>
        <p>The confirmation of the result is mainly based on a good definition of
responsibilities and method that could be verified through internal audit and through the
implementation of the new information system.
4.2</p>
      </sec>
      <sec id="sec-4-2">
        <title>Method and topics</title>
        <p>The collective behavior of the co-operative organization is characterized by social
values that are shared inside the structure with the involvement of the associates and
outside with the attention to the caring needs in the local communities. The quality
management model is tailored on the co-operative identity and it has been designed
by means of a deep process analysis that allowed practitioner and responsible to share
knowledge and experience. For these reasons this context was still orientated to social
approach and to process management and it was quite easy to apply a Socio-technical
Design exploited by means of Process Analysis.</p>
        <p>I proposed a project team composed by all the employees because, in this way, the
group can capture and modify behavior. Most of team member are employed for a
long time and they have a great experience. Their practice is tailored on their habits
and this could cause resistance to change and suspicion to new tools and methods.
Then a shared approach can mitigate this resistance.</p>
        <p>I was not constrained by predefined management models. Then I can observe the
team and maintain equidistance between the director (‘who commits, who designs’)
and the employees (‘who designs, who practices’) and among the team members. The
participation of all the employees reduced the bias in gathering information, because
the information was controlled in real time. From an ethnographic point of view,
because of my previous experience in the organization, I was considered as an ‘insider’
in the project team and, in some sense, in the whole organization. For instance I am
aware of the relationship between front-office and back office and of their interrelated
processes.
4.3</p>
      </sec>
      <sec id="sec-4-3">
        <title>Results and lesson learned</title>
        <p>The project achieved positive results because the Socio-technical Design and the
Process Analysis improved the common vision of the activities and of their interaction, as
well as effectively re-engineering the organizational structure and related processes.</p>
        <p>In particular the Process Analysis increased the knowledge of the group on the
logical structure of information and data flows and improved the effectiveness in data
recording and analysis. This knowledge is now exploited for a preliminary elicitation
of the information system requirements that will support in choosing the IT supplier.
The requirements could include the same social approach.</p>
        <p>As weak point of this project could be the lack of a simultaneous involvement of
all the required competences, in particular the practitioners with competence in the
management system and the practitioner with competence in the information system.
5</p>
      </sec>
    </sec>
    <sec id="sec-5">
      <title>Outlook</title>
      <p>The methodological framework described in the previous sections will continue to
support my practitioner activities. The described experiences are still running and
hence the results and lessons learned require completion and updating.</p>
      <p>Using the described approach I am developing new projects with the aim to
implement and integrate management system where the requirement of quality, of
environment and of occupational health and safety could be supported by a common
information system.</p>
      <p>I think that this method could require changes in the management approach of the
organizations. For instance the management of data and information is often projected
as an outsourced activity and the relationship of information systems with social
behavior and processes neglected and underestimated.</p>
      <p>This approach could require changes in practitioners and consultant companies as
well. For instance the practitioner’s point of view is strongly influenced by their
models and by specialized skills. For these reasons, an Ethnographic Approach could help
them to understand their role in the customer environment and to make more flexible
their conceptual frames.
6</p>
    </sec>
    <sec id="sec-6">
      <title>Conclusions</title>
      <p>In this paper I describe two working experiences where I am applying a
methodological framework that merge Process Analysis and Socio-technical Design. The
experiences have been useful to evaluate the effectiveness of this method and to reflect on
some topics related to the analysis criteria and to the design process. In these
experiences I considered some suggestion of an Ethnographic Approach as well.</p>
      <p>I think that the proposed method could be a useful way for overcoming the
separation of functional areas and hence for supporting communication and integration of
management systems and information systems. This positive result has been reached
in one of the described experience.</p>
      <p>Some weak points have been presented as well. In particular the commitment could
negatively influence the effectiveness of the Socio-technical approach if the
management model is too prescriptive and the scope of the project is too strict.
7</p>
    </sec>
  </body>
  <back>
    <ref-list>
      <ref id="ref1">
        <mixed-citation>
          1. ISO 9001:
          <year>2015</year>
          “
          <article-title>Quality Management Systems</article-title>
          . Requirements.”
        </mixed-citation>
      </ref>
      <ref id="ref2">
        <mixed-citation>
          2.
          <string-name>
            <given-names>Paola</given-names>
            <surname>Mauri</surname>
          </string-name>
          .
          <article-title>Process Analysis and Collective Behavior in Organizations. A Practitioner Experience</article-title>
          . Y.T. Demey and H.
          <string-name>
            <surname>Panetto</surname>
          </string-name>
          (Eds.):
          <article-title>OTM 2013 Workshops</article-title>
          , LNCS
          <volume>8186</volume>
          , pp.
          <fpage>124</fpage>
          -
          <lpage>133</lpage>
          ,
          <year>2013</year>
          . Springer-Verlag Berlin Heidelberg 2013
        </mixed-citation>
      </ref>
      <ref id="ref3">
        <mixed-citation>
          3.
          <string-name>
            <given-names>Enid</given-names>
            <surname>Mumford</surname>
          </string-name>
          .
          <article-title>The story of socio-technical design: reflections on its successes, failures and potential</article-title>
          .
          <source>Info Systems Journal</source>
          (
          <year>2006</year>
          )
          <volume>16</volume>
          ,
          <fpage>317</fpage>
          -
          <lpage>342</lpage>
          Blackwell publishing Ltd
        </mixed-citation>
      </ref>
      <ref id="ref4">
        <mixed-citation>
          4.
          <string-name>
            <given-names>Paola</given-names>
            <surname>Mauri</surname>
          </string-name>
          .
          <article-title>The Process Analysis as a Frame to Merge Social and Technical Issues in the Design of Information and Management System</article-title>
          . S.Kowalski,
          <string-name>
            <given-names>P.</given-names>
            <surname>Bednar</surname>
          </string-name>
          , I.Bieder (Eds.) CAiSE 2015 Workshop STPIS 2015 CEUR Vol-
          <volume>1374</volume>
          , pp.
          <fpage>100</fpage>
          -
          <lpage>105</lpage>
        </mixed-citation>
      </ref>
      <ref id="ref5">
        <mixed-citation>
          5.
          <string-name>
            <given-names>Gil</given-names>
            <surname>Regev</surname>
          </string-name>
          , Laura Regev, Yasmina Naim, Julie Lang,
          <string-name>
            <given-names>Alain</given-names>
            <surname>Wegman</surname>
          </string-name>
          .
          <article-title>Teaching an Ethnographic Approach to Requirements Elicitation in an Enterprise Architecture Course</article-title>
          . S.Kowalski,
          <string-name>
            <given-names>P.</given-names>
            <surname>Bednar</surname>
          </string-name>
          , I.Bieder (Eds.)
          <source>CAiSE 2015 Workshop STPIS 2015 CEUR Vol1374</source>
          , pp.
          <fpage>5</fpage>
          -
          <lpage>19</lpage>
        </mixed-citation>
      </ref>
      <ref id="ref6">
        <mixed-citation>
          6. ISO/IEC 17020:
          <year>2012</year>
          “
          <article-title>Conformity assessment - Requirements for the operation of various types of bodies performing inspection”</article-title>
        </mixed-citation>
      </ref>
      <ref id="ref7">
        <mixed-citation>
          7.
          <string-name>
            <given-names>T.C.</given-names>
            <surname>Powell</surname>
          </string-name>
          ,
          <string-name>
            <given-names>D.</given-names>
            <surname>Lovallo</surname>
          </string-name>
          , and
          <string-name>
            <given-names>C.R.</given-names>
            <surname>Fox</surname>
          </string-name>
          . Behavioral Strategy.
          <source>Strategic Management Journal</source>
          <volume>32</volume>
          :
          <fpage>1369</fpage>
          -
          <lpage>1386</lpage>
          John Wiley &amp; Sons (
          <year>2011</year>
          )
        </mixed-citation>
      </ref>
      <ref id="ref8">
        <mixed-citation>
          8.
          <string-name>
            <given-names>Quy</given-names>
            <surname>Nguyen Huy .How Middle Managers Group-Focus Emotions</surname>
          </string-name>
          and
          <article-title>Social Identities Influence Strategy Implementation</article-title>
          .
          <source>Strategic Management Journal</source>
          <volume>32</volume>
          :
          <fpage>1387</fpage>
          -
          <lpage>1410</lpage>
          John Wiley &amp; Sons (
          <year>2011</year>
          )
        </mixed-citation>
      </ref>
      <ref id="ref9">
        <mixed-citation>
          9.
          <string-name>
            <surname>James</surname>
            <given-names>J.</given-names>
          </string-name>
          <string-name>
            <surname>Chrisman</surname>
          </string-name>
          ,
          <string-name>
            <surname>Jess H. Chua</surname>
            , Allison W. Pearson,
            <given-names>Tim</given-names>
          </string-name>
          <string-name>
            <surname>Barnett</surname>
          </string-name>
          . Family Involvement, Family Influence, and
          <article-title>Family-Centered Non-Economic Goals in Small Firms</article-title>
          ,
          <source>ET&amp;P March</source>
          <year>2012</year>
          ,
          <fpage>267</fpage>
          -
          <lpage>293</lpage>
        </mixed-citation>
      </ref>
      <ref id="ref10">
        <mixed-citation>
          10.
          <string-name>
            <surname>C. Moore</surname>
            ,
            <given-names>J.R.</given-names>
          </string-name>
          <string-name>
            <surname>Detert</surname>
            ,
            <given-names>L.K.</given-names>
          </string-name>
          <string-name>
            <surname>Trevino</surname>
            ,
            <given-names>V.L.</given-names>
          </string-name>
          <string-name>
            <surname>Backer</surname>
            ,
            <given-names>D.M.</given-names>
          </string-name>
          <string-name>
            <surname>Mayer</surname>
          </string-name>
          .
          <article-title>Why Employees Do Bad Things: Moral Disengagement and Unethical Organizational Behavior</article-title>
          .
          <source>Personel Psychology</source>
          ,
          <year>2013</year>
          ,
          <volume>65</volume>
          ,
          <fpage>1</fpage>
          -
          <lpage>48</lpage>
          John Wiley &amp; Sons (
          <year>2012</year>
          )
        </mixed-citation>
      </ref>
      <ref id="ref11">
        <mixed-citation>
          11.
          <string-name>
            <given-names>Ilia</given-names>
            <surname>Bieder</surname>
          </string-name>
          .
          <article-title>Towards a Non-workflow Theory of Business Processes M. La Rosa and</article-title>
          P. Soffer (Eds.):
          <article-title>BPM 2012 Workshops</article-title>
          , LNBIP
          <volume>132</volume>
          , pp.
          <fpage>1</fpage>
          -
          <lpage>2</lpage>
          ,
          <year>2013</year>
          . Springer-Verlag Berlin Heidelberg 2013
        </mixed-citation>
      </ref>
      <ref id="ref12">
        <mixed-citation>
          12.
          <string-name>
            <surname>K.D. Swenson</surname>
          </string-name>
          .
          <article-title>Position: BPMN Is Incompatible with ACM. M. La Rosa and</article-title>
          P. Soffer (Eds.):
          <article-title>BPM 2012 Workshops</article-title>
          , LNBIP
          <volume>132</volume>
          , pp.
          <fpage>55</fpage>
          -
          <lpage>58</lpage>
          ,
          <year>2013</year>
          . Springer-Verlag Berlin Heidelberg 2013
        </mixed-citation>
      </ref>
      <ref id="ref13">
        <mixed-citation>
          13. Paul E. Spector and
          <string-name>
            <surname>Laurenz L. Meier</surname>
          </string-name>
          .
          <article-title>Methodologies for the study of organizational behavior processes: how to find your keys in the dark</article-title>
          .
          <source>Journal of Organizational Behavior</source>
          ,
          <volume>35</volume>
          ,
          <fpage>1109</fpage>
          -
          <lpage>1119</lpage>
          John Wiley &amp; Sons (
          <year>2014</year>
          )
        </mixed-citation>
      </ref>
    </ref-list>