        <article-title>Verification Validation and Testing: Passion and Deployment challenges in the Italian Eco-System</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>Sara Ricciardi</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>IASF Bologna INAF Bologna</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Italy ricciardi@iasfbo.inaf</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>SKA HQ SKA Organization Macclesfield</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Great Britain</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Tetra Pak Packaging Solution Modena Italy</string-name>
        </contrib>
      </contrib-group>
      <abstract>
        <p>- Having a solid verification and validation Plan and a clear strategy to implement it plays a crucial role in successfully delivering any project e.g. governative, commercial or scientific. A specific tailoring is required but at the same ti me it is fundamental to share needs, experiences and methods spreading the best practices in the Italian Eco-S ystem and highlighting the commonalities. In this framework the VVT working group of AIS E hosted a 1-day workshop held in Bologna at the Area della Ricerca the 26th of May 2016 “Verification Validation and Testing: Passion and Deployment challenges”. This workshop coordinated by AIS E and organized by a Research Institute (INAF) and an Industrial partner (Tetra Pak Packaging S olutions) gathered together practitioners for different background (academia, research, industry, software vendors) for a full day discussion and collaborative workshop. This paper presents the outcomes and foresees future steps</p>
      </abstract>
      <kwd-group>
        <kwd>system engineering</kwd>
        <kwd>verification and validation</kwd>
        <kwd>best practices</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>-</title>
      <p>INT RODUCTION</p>
      <p>
        There is a general rule in software engineer that states that
to fix a problem during requirement analysis it costs 1$, to fix
the same problem during coding it costs 10$, but the cost to
fix it during the testing phase is 100$ [
        <xref ref-type="bibr" rid="ref1">1</xref>
        ]. In literature there are
many studies to measure the cost of the verification and test
processes and to measure the ROI on the life cycle of a
project. Indeed, Nagano [
        <xref ref-type="bibr" rid="ref2">2</xref>
        ] presents a thorough analysis of the
verification process through space programs , and he shows the
importance of controlled processes. In [
        <xref ref-type="bibr" rid="ref3">3</xref>
        ] it is stated that
debugging, testing, and verification activities in software
projects can easily range from 50 to 75 percent of the total
development cost. The verification, validation, and test
processes are very expensive in any project, but a proper
process execution can minimize risks of mission un -success
[
        <xref ref-type="bibr" rid="ref2">2</xref>
        ].
      </p>
      <p>On the base of this fact, the Italian Validation,
Verification, and Test (VVT) group formed in late 2014. The
group is one of the working group of AISE, Associazione
Italiana di System Engineering, the Italian chapter of
INCOSE. The group is counting a very heterogeneous group
of people that belong to different environments. In the group it
is easy to find experts and professionals in VVT p rocesses
from the academic world, from the research business, and
from industry. Its main aim is to share different experiences in
different contexts, and to foster members to work together to
improve the application of VVT processes. During its first
meeting in 2014, the VVT group agreed to work on a list of
six objectives. The first two points are: 1) to contribute to the
development of a leaner application of VVT processes, 2) to
contribute to the dissemination of VVT best practices between
the industrial world and the academic world. In order to fulfil
these two objectives the VVT group organized in May 2016
the first Italian Workshop on VVT.</p>
      <p>Different kind of workshops on general System
Engineering topics are common abroad and in Italy, and most
of them are dedicated to requirements processes or to MBSE
(Model Based System Engineering). There are a few examples
of workshops fully devote to Verification and Test, but
normally they are dealing with specific environment; one
example is the “5th international workshop on verification and
test of space systems” that was organized in May 2016 by the
European Space Agency (ESA). In the VVT group we thought
that a more general workshop could stem interesting
discussion and could foster a direct sharing of knowled ge on
VVT processes.</p>
      <p>II.</p>
      <p>WORKSHOP ORGANIZATION AND MODUSOPERANDI
In this framework we, as members of the VVT group,
decided to focus the Italian professionals interested to VVT
around an event and we asked ourselves how to do it. We
immediately agreed the gathering should be informal, open
and it should produce an outcome that in principle could be
the incipit for a deeper engagement of the community. We
agreed the one-day workshop formula could work for our
needs.</p>
      <p>Organizing the workshop we asked ourselves “small”
questions that immediately translated into big ones; e.g. we
were wondering which kind of professionals could be
interested in such a workshop, and which channel of
communication will be more suitable to promote it. In the
process, we ended-up wandering about the composition of our
community (AISE members), about the Italian SE
ecosystem, about the VVT professionals already in the market
and the companies/ institutions where they belong; we asked
ourselves if such professionals and their companies are aware
of AISE activities and if and how this workshop could be
appealing for them.</p>
      <p>Doing that definitely, our point of view was not completely
neuter and our vision was driven and somehow biased by o ur
personal work environment and previous experiences.
Luckily, the LOC members belong to different background
and experiences (SR researcher at INAF - Istituto Nazionale di
Astrofisica, CL quantitative Systems Engineer at Tetra Pak,
LS head project engineer at SKA - SQUARE KILOMETRE
ARRAY Organization). It would be great for the next time to
have an even more extended and diverse board of
organizer/mentor in order to have a more broader view of our
community and to target in a more efficient way our next
event.</p>
      <p>At the best of our knowledge we delineated the profiles of the
interested VVT professionals and we tailored the workshop on
such pictures. During this process we identified four macro
classes of possible stakeholders defining the work
environment where they belong: Academia, Research,
Industry, Software Houses.</p>
    </sec>
    <sec id="sec-2">
      <title>A. Academia</title>
      <p>In this macro category we grouped the professionals and
practitioners (University Professors, Researchers, Post-Docs,
Students) that analys e the System Engineering process es
themselves and in particular the VVT process es. Since in Italy
currently there is just one University offering a degree in SE
(University of Rome "Tor Vergata" Postgraduate Master
degree in Systems Engineering) we invited also Professors
from Engineering departments such Department of
Management, Economics, Industrial Engineering, Mechanical
Engineering, that developed a strong interest in the System
point of view.
In this macro category we grouped all the stakeholders that
apply SE and VVT practices as a tool in the research
environment.</p>
      <p>Doing science in the 21th century means to be able to design,
develop, build, and test very large and expensive equipment,
before to be able to exploit them scientifically. The project
could be a satellite, a large ground facility, an accelerator of
particles, but for each of these examples a system approach is
mandatory to meet the requirements in term of budget, time
and quality. The vast majority of representatives of this group
registered to the workshop belonged to INAF. Naturally this
branch of research had more space in the workshop.</p>
    </sec>
    <sec id="sec-3">
      <title>C. Industry</title>
      <p>In this macro category we grouped all the stakeholders
belonging to the industry. This was probably the slice of
stakeholder more difficult to reach because besides the
companies already known for their involvement in AISE it
was very difficult to reach other companies potentially
interested. We attempted to reach other potential companies
partnering with CRIT, a technology scouting society based on
a consortium of industries based in the Emilia Romagna area,
that offers services to private companies regarding
technological R&amp;D scouting, industrial best practices and
innovation support. CRIT also helped us communicating the
event.</p>
    </sec>
    <sec id="sec-4">
      <title>D. Software Houses</title>
      <p>A Software Houses definitely is an Industry; because of the
relevance and the role of this particular industry in SE and in
VVT process we decided to separate this kind of companies
from other Industries. The software Houses build the SE tools
that other Industries will use so somehow they play a different
role. SW life cycle has the biggest cost in verification, as
stated in the introduction, and a better application of System
Engineering process are an effective way to control these
costs. The SW discipline has his own dedicated standard on
ISO/IEC/IEEE 12207.</p>
      <p>Once the players were identified, the most important goal of
this workshop was to get professionals and practitioners from
these different backgrounds together; to look for
commonalities, to highlight good practices , and to depict a
common scenario, the Italian eco-System, where the
professionals work. At the same time we were in need to
clearly hear the diverse voices from different stakeholders and
get to know different work environments where VVT is
applied. For this reason we organized the day in two sessions .
In the morning we did listen to lecturers for each class of
stakeholder giving a general overview of their work
environment and focussing on a key statement that can
somehow summarize their point of view of VVT practices.
In the afternoon the workshop itself took place. To get things
really going we needed diverse people talking each other
about their VVT experiences in an informal way; we needed
to keep track of the informal discussion; we need ed a common
framework to highlight natually the commonalities.
Therefore we divided the partecipants in 7 groups assuring
some variety in the composition. We asked the partecipants to
work together to identify the commonalities between different
environments either positive (e.g. best practices) or negatives
(e.g. not adequate expertise/education, “walls” to overcome).
The basic idea was to create a visual map showing the
connections between the four sectors (academia, research,
industry and software houses) in term of commonalities, walls
and quicksands relatives to VVT practices.</p>
      <p>It was important in our point of view to produce an tangible
outcome to direct the efforts of the partecipants and to obtain a
product from the workshop. To stimulate this process the
LOC, with the contribution of the lecturers, provided a draft of
this map where the conveneers could scatch their ideas. A
“head” was assigned to each group to explain the preliminary
map and to lead the discussion; each group nominated a
“writer” to present the outcome of the discussion to the other
groups and then write it down for further refinements and the
map’s wrap-up.</p>
      <p>III.</p>
      <sec id="sec-4-1">
        <title>PART ECIPANTS</title>
        <p>In this section we will briefly resume some stats about the
participation to the workshop. We got about 60 people that
registered for the workshop and about 30 that showed up. The
composition of the participant is resumed in Fig. 3 . It is clear
that half of the participants belong to the research sector and
within this sector astrophysics play a crucial role; almost 90%
of the researchers belong to INAF (Istituto Nazionale di
Astrofisica) or they have worked there. In the Industry sector,
about 35%, we see two large groups composed from
professionals affiliated to Tetra Pak and to Datalogic.
The Software Houses and the Academia sector provide both
about 7% of the participants. The professional in the first
sector belong to IBM, Blizzard, ESTECO; the ones from
Academia belong to Politecnico di Milano, Università di
Modena e Reggio Emilia, DIMES Università della Calabria.
SE for complexity management</p>
        <p>Mith or real opportunity?
Citation index</p>
        <p>Academia
Needs Demonstrative solutions</p>
        <p>
          Spin offs
Specific fields knowCleodmgpeetences/Skills
confoundings
feedbacks
The level of participation was pretty good for this kind of
event especially thinking that the area of interest of this
workshop is very narrow (VVT practices) and the typical
number of participants for such events . (E.g. the SESE 2016
tour
http://aise-incose-italia.it/events/southern-europesystems-engineering-tour-sese/). The fact that we record such
large participation for INAF and Tetra Pak shows that the
promotion of an event plays a crucial role. Another interesting
fact is that recently INAF itself organized a workshop on SE
so probably this community or at least some members are
already adopting a system approach and VVT techniques and
were ready to jump in. There is also an historical reason. SE
was born with big projects like the ICBM (Inter Continental
Ballistic Missile) in the late 50s [
          <xref ref-type="bibr" rid="ref4">4</xref>
          ]. The rocket used for the
ICBM, the big Atlas rocket, was used by the just formed
NASA (1958) for its most important dream; to bring a man in
an orbital flight. This was the Mercury program. The new born
space agency started to configure all the engineering processes
that worked so well for the pioneering programs, and with
time they become standards. This effort was concluded in the
publication of the NASA System Engineering Handbook in
1995. In more recent times (1996) the new European
Cooperation for Space Standardization (ECSS), established in
1993, released the first set of standards; any contractor of the
European Space Agency (ESA) must adhere to these set of
standards. This means that SE is well known and used in the
space business since a few decades . Even if the main reference
for Ground astronomy the European Southern Observatory
was established in 1962, fifteen years before ESA was created,
the standardization in ESO and the application of configured
processes in system engineer came much later. ESO simply
was the first organization of its kind and it couldn’t benefit of
the heritage of NASA. This difference is still visible in the
system culture of the engineers, even if ESO and many of
ground projects have started to following tailored version of
ECSS standards or simply adopting other standards (e.g. ISO
standards) or handbook as the INCOSE Handbook.
The workshop occasion encouraged many of Tetra Pak
Systems Engineers and VVT practitioners to openly and
actively participate and share during the workshop their
viewpoint with the research community.
        </p>
        <p>The workshop got an occasion to engage the community being
a starting point for following activities.</p>
        <p>IV.</p>
        <p>THE WORKSHOP
In this paragraph we discuss the key statement that each
lecturer provided, we resume the outcome of the workshop
and we present the updated conceptual map</p>
      </sec>
    </sec>
    <sec id="sec-5">
      <title>A. Key statement analysis</title>
      <sec id="sec-5-1">
        <title>The academia point of view</title>
        <p>Cesare Fantuzzi Director of the Doctoral School in
Engineering of Industrial Innovation, Department of
Engineering Sciences and Methods. The development of
mechatronic systems involves the use of different disciplines..
Traditionally, every discipline is developed independently and
then integrated to generate the final system. However,
increasing complexity of automatic machine design makes
unavoidable to integrate simultaneously these disciplines. The
resulting integrated approach carries an intrinsic complexity
into system design process. To achieve this goal, the
methodology treats the problem of linking the conceptual with
executable models to enable the validation by simulation. The
key statement presented by Prof. Fantuzzi “System
Engineering as a solution to manag e complexity in design
processes applied to complex industrial automatic machines:
just a myth or a real opportunity? showed a possible and
credible solution of the problem based on MBSE and virtual
commissioning simulation processes.</p>
        <p>Sergio Terzi – Politecnico di Milano – Department of
Management, Economics and Industrial Engineering: In this
talk the observatory GeCo (Collaborative Process
Management of Design) was presented. The study presented is
based on a series of surveys among more than 400 small,
medium and large Italian manufacturing companies from four
industrial macro-areas. Those survey are fundamental to
bridge the gap between the literature theory and the industrial
practice about New Product Development (NPD) process and
Innovation. The key statement reported by Prof. Terzi is: “In
their design process companies have still to understand the
potentialities of system oriented approaches. Test and
experimentations are still made too late. Some excellences
exist and they can be highlighted as good examples to the
wider manufacturing and engineering context”
Alfredo Garro, Ph.D. associated professor at the university
of Calabria and visiting professor at NASA proposed ,
connected from Houston, an innovative approach to one of th e
pillars of VVT strategies: “Formal Requirements Modelling
for Simulation-Based Verification”. Writing good
requirements is not sufficient for delivering systems value.
Efficiently validating and verifying them is the key to success.
Modelling requirements according to a standard and enabling
all the tasks and the testing strategies in the SE processes by
the model by associating requirements and architecture with
behavioural models is what Prof. Garro proposed . The “W”
aspect of systems life-cycles, explicitly including the usage,
maintenance and disposal phases is considered.</p>
        <p>Examples and live demos of requirements validation were
proposed.</p>
      </sec>
      <sec id="sec-5-2">
        <title>The research point of view</title>
        <p>
          The research brought two different examples as case studies.
The first one related to a scientific instrumentation based on
ground (i.e. the optical telescope VLT) and the second one a
deep space instrument (i.e. the sorption cooler on the Plank
satellite). The distinction is important, because of the so
different operation phases, the validation and verification
processes are quite different in the two cases. Moreover, the
Plank Satellite followed a very mature set of ECSS standards.
Davide Fierro – INAF – Chief Engineer Office INAF. In his
talk he reported his personal experience during the complex
integration, verification, and test of the VST telescope [
          <xref ref-type="bibr" rid="ref5">5</xref>
          ]. The
VST is the largest telescope in the world designed for
surveying the sky in visible light. This state-of-the-art 2.6-m
telescope is on Cerro Paranal, a perfect location for
groundbased astronomical observations. The key statement reads that
a correct configuration control is a key process for VVT. The
configuration control management is part of the technical
management process, but for complex projects it assumes a
strategic importance. Projects as the VST, or in general
scientific instruments projects, are a joint venture of different
and distributed players. These players , eventually, come in the
same place during the system integration and verification
phases. Modern observatories are placed in very remote
places: therefore, the time spent on site must be minimized.
Documentation plays a strategic role to conduct the interfaces
integration, that normally belong to different systems owned
by different players, and to test (i.e. verify) them in the correct
way and in the most efficient way.
The configuration control is extended to items that deserve
specific attention. Each of the 84 actuators that composes the
active source has a story that must be under configuration
control. This story, from the component construction to the
assembly of the single actuator, is extremely important for the
fine characterization that is needed for such instrument.
Without these information, made available in a proper
configuration control system, would be nearly impossible to
calibrate this instrument at the accuracy requested by the
science cases.
        </p>
        <p>Gianluca Morgante – INAF – Head Thermal Engineer for
several ESA space missions had the unusual chance to look at
the same problem from two different point of view. The
“problem” was to design, build and test the Planck Hydrogen
Sorption Cooler and the two points of view were the NASA
and ESA different perspectives. Morgante was member of the
US team at the Jet Propulsion Laboratory that developed the
Planck cooler for 7 years (1998-2005) and then he moved
back to Europe to conduct the ESA test campaign and to
deliver the instrument. Planck was the first European mission
dedicated to map, with unprecedented sensitivity, the
microwave cosmic background radiation (CMB), that is the
relic of the Big Bang and to investigate the Universe evolution
(birth, expansion, future, content). The scientific goals
required a thermal architecture based on a passive and active
systems combination and results in the most complex
cryogenic mission to date. Overall the cryo-chain
performances are among the biggest technological
achievement of the Planck mission therefore Planck leaves a
large heritage and a wealth of lessons learned for future cryo
missions. The specifications required were demanding in
terms of operating temperature, cooling power and vibration
levels and they should be satisfied within the mass and power
allocations of an ESA medium size mission. No existing
system was fulfilling these requirements. The ESA approach
at the time was typically very conservative, meaning to relax
the requirements and to use whatever technology was already
available. The NASA plan to find a solution instead was very
ambitious and obviously more risky. The approach implied to
come up with a creative and innovative solution: to ass emble a
team of people with different expertise able to design, build
and verify such a system following an approach similar, under
some aspects, to the Faster, Cheaper, Better philosophy. The
FCB approach is now controversial due to failures suffered by
some projects but it was also able to lead important missions,
such as Mars Pathfinder, to a resounding success. The US
team had to demonstrate to ESA and to themselves that the
undertaken endeavour was solid and promising so they built a
prototype for a balloon experiment to demonstrate the TRL.
This attempt was unsuccessful but the lessons learned from
that first attempt were the inception of a complete new
concept for the Planck cryo-coolers and their VVT.
Planck Sorption Cooler testing process was complex as for
any space instrumentation. The verification of the system took
a long time and many resources as depicted in Fig. 5.
In summary the Planck mission lessons learned in terms of
systemVVT can be condensed in few bullets:
 System Engineering and good VVT practices are
fundamental for a mission success specially to avoid
over-designing and over-testing
 Testing is critical. Test as much and as long as possible:
anticipating tests at system level even with earlier models
(QM’s, EBB’s, etc.) is really important to highlight
possible issue that don’t show up at subsystemlevel.
 Researchers/scientists need to build a sound knowledge
of System Engineering approaches and VVT practices.
This is still a weak spot in the expertise of scientific team
members in space projects. In particular, SE and VVT
should become part of education programs in the
Universities also for space science courses.
 When starting new projects, it is critical to involve
competent personnel and build on previous missions
lessons learned, avoiding to re-invent the wheel.</p>
        <p>To demonstate TRL
System Tests
Operation
End of Life</p>
        <p>Cold End
Qualification Model</p>
        <p>(QM)</p>
        <p>Complete functional and
performance test campaign on
ground
2006 - 2008
2009 - 2013</p>
        <p>2013
Fig. 5. Planck/Sorption Cooler Life Cycle
In the end it is still hard to find an answer to the starting
question: “Test better to test less?”. Is there a definitive
answer? For sure, VVT practices applied and declined case by
case are one of the possible answer.</p>
        <p>Fabrizio Villa – INAF – Senior Researcher, Head of
Cryowaves Lab. Cryowaves is a made-up word from the
fusion of CRYOgenics and microWAVES with the aim to
identify a Science and Technology branch mainly focused to
develop technologies and facilities to build and operate
wideband high performance radio, microwave, and mm-wave
receivers and antennas operated in cryogenic environment.
Modern microwave and mm-wave astrophysics uses detectors
that needs to be cooled at cryogenic temperatures to minimize
the detector noise, then reaching the impressive sensitivity to
observe celestial sources as required by science needs.
Examples of this kind of technology is the ESA Planck
Satellite (up to now the most advance cryogenic system fo r
space) that measured the Big-Bang sound in intensity and
polarization at microK level and ALMA Observatory
(www.almaobservatory.org) that, for instance, recently
permitted to take an image of a proto-planetary disk rotating
around a distant star.</p>
        <p>Thanks to the iALMA premiale and ESO ALMA upgrades
plan Dot. Villa has been engaged in the development of a new
prototype receiver for ALMA. The technology legacy of
Planck permitted to create a laboratory at
INAF/IASFBologna (Cryowaves laboratory) to exploit cryowaves at their
best. The idea was to setup a state-of-the-art laboratory to
integrate, characterize, calibrate complex scientific
instrumentation at cryogenic temperatures. In this respect the
laboratory and related activities (design and simulations) are
well focused on the VTT and more general SE disciplines.
The final goal is to set up a laboratory and a dedicated
workgroup of people where facilities, technologies
knowledges and skills are in place and ready to tackle
challenges related to cryogenic, integration, test, verification
for space technology and beyond. The SE and VVT best
Single Component</p>
        <p>Testing</p>
        <p>Elegant BreadBoard</p>
        <p>(EBB)
2002 - 2006</p>
        <p>Flight Model 1</p>
        <p>Flight Model 2
practices are expected to be applied at all level and during all
the phases; the team has a demonstrate experience in the field
of integration and test for spatial mission and for complex
scientific instrumentation.</p>
      </sec>
      <sec id="sec-5-3">
        <title>The industrial point of view</title>
      </sec>
      <sec id="sec-5-4">
        <title>Gaetano Cutrona – Andrea Margini – The key statement</title>
        <p>proposed by Dr. Ing. Cutrona Gaetano and Dr. Ing. Margini
Andrea from Tetra Pak Packaging Solutions concern ed the
potentialities of the Agile methodologies to facilitate the
identification and introducing new VVT methodologies from
the academic to the industrial work.</p>
        <p>The deployment of SE methodologies in the industry and in
the service market in the last decade, focused on the “Lean
SE” and on the Systems Product Line Engineering. Combining
these two aspects an interesting issue for the V&amp;V
practitioners is the evaluation of a value-related, sufficient but
not redundant effort during the usage phase of the system
lifecycle.</p>
        <p>The intervention proposed during the workshop, highlighted
the human factors and the varied system responsiveness. New
individuals and organizations, which were only typically
marginally informed and consulted during the development
phase, are involved in the usage and maintenance phase. The
final user, the customer and the maintenance are typical but
not the only examples. The expected net present value
(ENPV) estimations find their confirmation or contradiction.
Finally, the “intended environment” confirms its rapidly
changing behaviour.</p>
        <p>
          The SCRUM framework [
          <xref ref-type="bibr" rid="ref6">6</xref>
          ] has been used firstly by the
software industry and it is now extending the service one. A
different attitude to developments projects and teams
organizations is required to support “sprint”, daily or weekly,
backlogs, design tasks and related verifications for
incremental system evolution.
        </p>
        <p>A liquid food packaging case study has been proposed. The
V&amp;V activity is strongly driven by effective V&amp;V plans and
Test Reports. The sprint backlogs converge to minimization of
the requirements.
Development and verification teams integration and
consistency among cycling artefacts are highlighted as the
keys to success for the application of Agile V&amp;V
methodologies within SCRUM framework. The basic question
arose during the workgroups discussion regards the
identification of a minimal set of VVT tools and
methodologies, part of the ones applied d uring the
development phases, suitable to efficiently enable the usage
and maintenance phase of the system.</p>
      </sec>
      <sec id="sec-5-5">
        <title>The software house point of view</title>
        <p>Carlo Poloni – ESTECO – Prof. Carlo Poloni addressed
during his intervention the following question: “What is the
VVT potential role of the virtual prototyping?”
Collaborative Multidisciplinary Optimization generates
relevant info while simulations are strictly connected with
physical experiments during verification and validation
processes.</p>
        <p>The general observation is that isolated simulation “pearls” are
implemented and reported by experts on sub -systems,
components and sometimes also on systems. They are
although rarely integrated into a consistent V&amp;V strategy. The
models are developed, as necessary, and their results remain
typically isolated in the overall development overview.
Moreover, the required skills to design, run and document the
applications are in the hands of highly skilled experts whom
do not relate continuously with the rest of the development
team.</p>
        <p>Prof. Poloni highlighted the importance of a network of
information which sustains the system conceptual and
architecture phase with the simulations performed within the
VVT strategy during the design and verification phase.
Fig. 7. Simulations integrated by a network of information.</p>
        <p>Raw Data, fundamental to the simulation process require a
structured, coherent and visible effort of integration in order to
feed the Optimization and analysis process.
Looking at another dimension a models’ hierarchy helps to
maintain the coherence between the “VEE” model vertical, i.e.
system maturity, and the horizontal system evolution
dimensions.</p>
        <p>Simulations model often anticipate physical testing when
prototypes maturity is not sufficient or not available at all.
Their development cost is not irrelevant and the re-usability
must be included into the V&amp;V strategy.</p>
        <p>The coherency among the models and the systems maturity is
one of the key factors to optimize the info/effort ratio.
Examples and success stories with different multi-domain
integrated tools, analytics and graphics were proposed to the
attendees.</p>
        <p>Fioravanti – Blizzard – Dr. Ing. Fioravanti, representing
Blizzard srl, proposed the “Simply … Agile” alias
methodologies and tools to implement Agile methods in SW
development. Basically the actually available Agile
development processes are still too complex in order to reach
their basic objectives. The main causes of failed SW
developed projects are proposed and analysed. Among them:
insufficient tests in the intermediate phase.</p>
        <p>The renovated Agile mantra lies on a wise step-by-step
approach where flexibility allows managing the growing
complexity with the right VVT effort. Working in small but
complete and closed steps allows proposing to the final user,
by fast prototyping, allows testing and usage by the final users
of the implemented functions . The discussion with the
workshop participants regarded the reasons of un-successful
and successful projects.</p>
        <p>V.</p>
        <sec id="sec-5-5-1">
          <title>WORKSHOP OUT COMES</title>
          <p>The resumed outputs of the groups discussion, proposed to the
attention of the overall attendees can be shown in the updated
conceptual map Fig. 9 and resumed as in the following
paragraphs.</p>
          <p>Gr5</p>
          <p>Group 5 “Registro”
VVT and SE not teaèched at the university</p>
          <p>Not applied in the research
Approach properly the issues</p>
          <p>Different mindset
Bureaucracy “quicksand” in the projects</p>
          <p>and in the organizations</p>
          <p>Resistance to change and diffuse
Negative events which can facilitate the alignment</p>
          <p>Job rotations among the two worlds
(G.PCruottreocntat,hmeipneurtseosntaolbkenorewc-ohvoewred)
More similarities than differences among the represented
viewpoints. Many of the practitioners belong , or belonged, to
more than one environment at the same time for limited or
longer periods. This aspect is remarked as one of the more
powerful catapults to speed-up the innovation deployment.
Spin-offs, PhD theses, temporary assignments in the
industries, European research funded occasions can furnish the
fertile ground for growing-up commonalities. Furthermore, a
SW tool developer and vendo r, a research centre, an
university, a PMI or a big industry, despite their different
foundations and organizational characteristics, need organized
development processes following the concepts of the systems
engineering.</p>
          <p>Tailoring is the link among the different environments around
the same concepts. The exposed failures in VVT experiences
and the recovering strategies proposed fro m different
panellists during the discussion reinforced similarities more
than differences. Starting from the requirements int erpretation
ambiguities , through the “verification war”, and finally to the
validation challenges , similar issues were presented and
discussed. Tailoring for the VVT processes is one of the key.
Great telescopes, one of a type prototype, mass productions o r
production lines could require VVT processes tailoring.
Bureaucracy and resistance to change characterize all the
environments. Only a real understanding of how the SE
processes can leverage the system value of the personal
Test Better to Test Less
Also a failed test brings useful info</p>
          <p>(G. Morgante)
` `</p>
          <p>Gr4</p>
          <p>Group 4 “Valore”
Institutional reflection pause
Being informed about WIP
Reciprocal info exchange
Come out of your’s shel
SW development integrated</p>
          <p>Different objectives
Pay attention to value return</p>
          <p>Rationalize results
(C. Poloni)</p>
          <p>Human expertise
and plan
growth can bypass this attitude. E.g. the VVT expert is not
any more an isolated, although fundamental passage but he is
one of the main wheels that convey, together with the other
persons and specialists , to the success. Prejudices do no t h e lp
to bypass the resistance to learn and change. Reciprocal
knowledge and real opportunities to cooperate are needed.
The fundamentals and the practice of the systems engineering
are not diffused enough in all involved environments.
Common understanding and faster deployment of research
deliverables passes through training and connecting the
researcher and the industrial systems engineers on the SE
fundamentals, e.g. the TRL concept, and on the interactions
among the Integration, Verification, Validation processes with
the other ones. Monitoring the VVT SE applications in order
to furnish a methodological reference is highlighted as one of
the factors to address the state of the art. E.g. Agile processes
are not yet enough known and applied Even if modern
organization in the Astrophysical business are starting to
appreciate these methods, there is a big margin for
improvement for a fruitful sharing of knowledge. The PMI
must be supported by the research centres and big industries to
tailor their own way to Systems Engineering.</p>
          <p>Focus on the overall V&amp;V strategies. In order to avoid the
“margin on margin” impact and to apply the “test better to test
less” approach. Single examples of success cannot enough to
sustain the development value. A systematic approach in the
V&amp;V strategy is required. Clearness in the application of the
SE methodologies, tools , and a critical attitude vs. what done
helps to avoid replicating the common mistakes.</p>
          <p>Integrate by small steps virtual simulations with traditional
physical testing can be the way to success. An easy, kiss,
start-up which doesn’t require a too big once in a time effort.
It can be continuously extended in scope and deepened by
incremental “natural” growths to tend towards maximum
value achievement.</p>
          <p>Documenting, despite the selected implementation (e.g.
classical or model based) documentation control and
configuration is essential. It can require a quantity of effort,
but it is fundamental not to disregard it due lack of time/funds
or perform it approximatively. The addressed direction is the
one of value-related documentation deliverables that goes
from: traditional word check-lists, laboratory logs to virtual
models deeply integrated in the development cycle (a
documented model itself).</p>
          <p>Re-use of the experiences developed in the university or by
the research, after their main objective, for didactic,
exemplifying or for continuous testing in the environments
different from the starting ones.</p>
          <p>Continue to meet is felt as one of the main needs , talk and
create a “common place” where exchanging past, on -going
and future experiences. This is the key to overcome, by
intellectual curiosity, the personal or organizational
restrictions. Furthermore, to create reciprocal knowledge,
trust and common opportunities.</p>
          <p>VI.</p>
          <p>NEXT ACT IVITIES
Next step of the AISE VVT working group is to diffuse and
leverage on the outcomes and deliverables of the workshop
within the larger Systems Engineers and VVT practitioners
community. The formalization of this paper goes in this
direction.</p>
          <p>The second step of this activity is planned for spring 2017.
Enlarging the involved community, prioritizing and identify
real common opportunities on the themes highlighted during
the workshop are the ambitions of this second sharing
occasion. Contacts are also on-going to diffuse the informatio n
with the parallel initiatives in the INCOSE EMEA sector.</p>
          <p>Acknowledgment</p>
          <p>The authors of this work would like to acknowledge the
invited speakers at the workshop. They would also
acknowledge Tetra Pak Packaging Solutions and Cryowaves
laboratory for make the workshop possible. This workshop
was partly supported by the Italian Ministero dell'Istruzione,
Universita' e Ricerca through the grant Progetti Premiali 2012
-- iALMA (CUP C52I13000140001).</p>
        </sec>
      </sec>
    </sec>
  </body>
  <back>
    <ref-list>
      <ref id="ref1">
        <mixed-citation>
          [1]
          <string-name>
            <given-names>G.</given-names>
            <surname>Labovitz</surname>
          </string-name>
          , et al. “
          <article-title>Making Quality Work: A Leadership Guide f o r t h e Results-Driven Manager” Harpercollins, 1992</article-title>
        </mixed-citation>
      </ref>
      <ref id="ref2">
        <mixed-citation>
          [2]
          <string-name>
            <given-names>S.</given-names>
            <surname>Nagano</surname>
          </string-name>
          , “
          <article-title>Space Systems Verification Program and Management Process”</article-title>
          ,
          <string-name>
            <surname>System</surname>
            <given-names>Engineering</given-names>
          </string-name>
          , Vol
          <volume>11</volume>
          ,
          <string-name>
            <surname>Issue</surname>
            <given-names>1</given-names>
          </string-name>
          ,
          <fpage>2008</fpage>
        </mixed-citation>
      </ref>
      <ref id="ref3">
        <mixed-citation>
          [3]
          <string-name>
            <given-names>B.</given-names>
            <surname>Hailpern</surname>
          </string-name>
          , P. Sant hanam, “
          <article-title>Software debugging, testing</article-title>
          , and verification”, IBM,
          <string-name>
            <surname>Systems</surname>
            <given-names>Journal</given-names>
          </string-name>
          , Vol.
          <volume>40</volume>
          ,
          <issue>No1</issue>
          .
          <year>2002</year>
          ,.
        </mixed-citation>
      </ref>
      <ref id="ref4">
        <mixed-citation>
          [4]
          <string-name>
            <given-names>Rescuing</given-names>
            <surname>Prometheus</surname>
          </string-name>
          :
          <article-title>Four Monumental Projects T hat Ch anged t h e Modern World by T homas P</article-title>
          . Hughes,
          <year>2000</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref5">
        <mixed-citation>
          <article-title>[5] “First Images from the VLT Survey T elescope” ESO 1119 - Organisation Release, 8 June 2011</article-title>
        </mixed-citation>
      </ref>
      <ref id="ref6">
        <mixed-citation>
          [6]
          <string-name>
            <surname>T he SCRUM</surname>
          </string-name>
          Guide , 2013
          <string-name>
            <given-names>K.</given-names>
            <surname>Schwaber</surname>
          </string-name>
          , J. Sutherland
        </mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>