<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Archiving and Interchange DTD v1.0 20120330//EN" "JATS-archivearticle1.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta />
    <article-meta>
      <title-group>
        <article-title>Process Harmonization Phase Model in Post Merger Integration</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>Irene Schönreiter</string-name>
          <email>Irene@schoenreiter.de</email>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <aff id="aff0">
          <label>0</label>
          <institution>Technical University Dresden</institution>
          ,
          <country country="DE">Germany</country>
        </aff>
      </contrib-group>
      <fpage>3</fpage>
      <lpage>22</lpage>
      <abstract>
        <p>Post merger integration (PMI) has received much attention in recent years due to an increasing number of merger and acquisitions (M&amp;As). Process harmonization plays an important role during the PMI. The objective of this article is to define the milestones of process harmonization and develop a phase model. Nine approaches are illuminated and concluded to a process harmonization phase model. BPM implementation or optimization literature has been scanned for suitable approaches. Further expert interviews have been conducted and evaluated with qualitative content analysis. A combination of the different approaches is regarded as the optimum. This article provides two central results: First, process harmonization phases are divided into management system level and process level. Second, process harmonization phases exist of analysis phase, conception phase, realization phase and verification phase. A general overview of suitable methods for each phase is provided.</p>
      </abstract>
      <kwd-group>
        <kwd>process harmonization</kwd>
        <kwd>post merger integration</kwd>
        <kwd>phase model</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>-</title>
      <p>
        “The integration process is the key to making acquisitions work“ [
        <xref ref-type="bibr" rid="ref1">1</xref>
        ].
Due to the fact that Business Process Management (BPM) plays a vital
role in organizational changes [
        <xref ref-type="bibr" rid="ref2 ref3">2, 3</xref>
        ], a key element in post merger
integration (PMI) is the process harmonization (PMI). The relevance of
BPM for practioners is stagnantly growing [
        <xref ref-type="bibr" rid="ref4">4</xref>
        ]. Especially when
symbiosis or absorption is the company´s chosen integration approach, two
worlds of business processes and management systems have to be
harmonized efficiently.
This article intends to suggest an approach for the phases of process
harmonization in the PMI phase. Process harmonization typically
comes along with process optimization and process redesign. Process
redesign is frequently a way for improving process performance
dramatically [
        <xref ref-type="bibr" rid="ref5">5</xref>
        ]. An essential prerequisite for a systematic design and
optimization of results, processes and resources are standardized
processes and a unified process framework as a basis for mastered
processes [
        <xref ref-type="bibr" rid="ref2">2</xref>
        ]. So why not to use the chance of improving processes when
they are redesigned by harmonisation anyway? The way from
separate companies to efficiently harmonized and optimised processes
includes some milestones and is divided in several phases.
      </p>
      <p>This article aims to find an answer for the following research question:
Which phases can be used for process harmonization in post merger
integration phase?
The paper is structured as follows. After this introduction, the
theoretical background is explained followed by the identification of relevant
literature which is added by expert interviews. Chapter 4 presents the
results that are discussed in chapter 5. A summary, limitations and
ideas for future research close this article.
2</p>
    </sec>
    <sec id="sec-2">
      <title>Theoretical Background</title>
      <p>
        Fernandez &amp; Bhat define process harmonization as “process of
designing and implementing business process standardization across
different regions or units so as to facilitate achievement of the targeted
business benefits arising out of standardization whilst ensuring a
harmonious acceptance of the new processes by different stakeholders“
[
        <xref ref-type="bibr" rid="ref6">6</xref>
        ]. Process harmonization aligns the differences of standardized
processes and defines the degree of their variation [
        <xref ref-type="bibr" rid="ref7 ref8">7, 8</xref>
        ] “by capturing
their commonality and variability in a consolidating and efficient
manner, without attempting to make different processes identical” [
        <xref ref-type="bibr" rid="ref8">8</xref>
        ].
Aside from post merger IT integration there is no identified
methodology to harmonize processes in the post merger situation [
        <xref ref-type="bibr" rid="ref9">9</xref>
        ].
Postmerger integration refers to the integration of a company after the
signing of a M&amp;A in which the integration planning and implementation
takes place in order to realize the desired appreciation successful [
        <xref ref-type="bibr" rid="ref10">10</xref>
        ].
According to the need for organizational autonomy and need for
strategic interdependence, different types of integration approaches exist:
absorption, symbiosis, preservation and holding [
        <xref ref-type="bibr" rid="ref1 ref11 ref12">1, 11, 12</xref>
        ].
• Absorption: the acquired company is absorbed by acquirer and
assimilated into its culture, the management usually comes from the
acquirer [
        <xref ref-type="bibr" rid="ref13">13</xref>
        ],
• Symbiosis: evolution from existing [
        <xref ref-type="bibr" rid="ref14">14</xref>
        ], learn from each other and
share qualities [
        <xref ref-type="bibr" rid="ref12">12</xref>
        ], most complex managerial challenge [
        <xref ref-type="bibr" rid="ref1">1</xref>
        ]
• Preservation: acquired company retains independence, modest
degree of integration by acquired company [
        <xref ref-type="bibr" rid="ref13">13</xref>
        ], no novelty [
        <xref ref-type="bibr" rid="ref14">14</xref>
        ]
• Holding: integration is not intended [
        <xref ref-type="bibr" rid="ref1">1</xref>
        ]; the acquired company
usually exists as a separate legal entity [
        <xref ref-type="bibr" rid="ref15">15</xref>
        ].
      </p>
      <p>For process harmonization are especially absorption and symbiosis of
relevance.
3
3.1</p>
    </sec>
    <sec id="sec-3">
      <title>Phases for Process Harmonization</title>
      <sec id="sec-3-1">
        <title>Identification of Relevant Literature</title>
        <p>
          To discover the optimal phases for process harmonization there are
various starting points.
Changes coming along with process harmonization can generally be
proceeded evolutionary or revolutionary. The evolutionary change
corresponds to the process of continuous improvement and is a gradual,
targeted and continuous approach, in which the corporate structure
and strategy is maintained [
          <xref ref-type="bibr" rid="ref16">16</xref>
          ]. Total Quality Management (TQM) and
Six Sigma can be associated with the evolutionary approach [
          <xref ref-type="bibr" rid="ref17">17</xref>
          ]. The
evolutionary approach equates to the engineering of processes and
consists of as-is analysis, as-is modeling, target modeling and process
optimization [
          <xref ref-type="bibr" rid="ref18">18</xref>
          ]. The advantage persists of a low risk of not revisable
wrong decisions in the rather complex issue [
          <xref ref-type="bibr" rid="ref15">15</xref>
          ]. If there are already
processes with a high level maturity in a company, it is
disadvantageous, destroying them by the radical approach, rather than develop [
          <xref ref-type="bibr" rid="ref19">19</xref>
          ].
The radical approach means Business Process Reengineering (BPR).
BPR defined in short means “start from scratch“ [
          <xref ref-type="bibr" rid="ref20">20</xref>
          ] and thus
corresponds in its pure form the "green field" approach [
          <xref ref-type="bibr" rid="ref19">19</xref>
          ]. BPR or shortly
Business Reengineering (BR) is a method for process optimization
done solely top-down and requires the absolute backing of top
management [
          <xref ref-type="bibr" rid="ref21">21</xref>
          ]. This involves the complete redesign of processes and
procedures in the company with the target to increase in performance
in terms of cost, quality, service and speed [
          <xref ref-type="bibr" rid="ref22">22</xref>
          ]. BPR proceeding is
following: 1. Why is something done?, 2. What needs to be done for?,
3. Clarification of strategic specifications and target framework, 4.
Elimination of old processes and structures, 5. Distinguish process and
new design of today´s sight, 6. Consideration of BPR principals, 7.
Radical new designed process (to-be concept and implementation plan),
8. Vernier adjustment and stabilisation [
          <xref ref-type="bibr" rid="ref22">22</xref>
          ].
        </p>
        <p>
          Another starting point for the harmonization of integrated management
systems introduces Karapetrovič that might be adaptable in the post
merger integration for two different existing management systems.
Based on the system-oriented approach, the harmonization is achieved
by the following steps: 1. Integration of the documentation in a
common manual and otherwise separated process, 2. unification of the
main processes, objectives and resources , 3. "All-in-one-system" as a
universal system for all sub-systems - complemented by the
development of a common audit system [
          <xref ref-type="bibr" rid="ref23">23</xref>
          ]. A study of Sampaio et al.
examined the question of whether integration or supplementation of the
additional management systems to an Integrated Management
System. The investigation showed following levels of integration:
Integration of documentation, management tool integration, definition of
common quality policy and objectives, common organizational structure
[
          <xref ref-type="bibr" rid="ref24">24</xref>
          ]. Ntungo developed the “Pursuit of Excellence Quality
Management System (PEQMS)“ with following steps and ISO 9001 as frame
requirement: 1. Development of the quality policy 2. Understanding
quality of assessment and taxation services 3. Developing quality
objectives 4. Identifying and understanding business processes 5.
Developing and implementing quality standards 6. Using quality data for
continuous improvement 7. Sustaining the quality management effort
8. Option to register with the ISO 9001 standard [
          <xref ref-type="bibr" rid="ref25">25</xref>
          ].
        </p>
        <p>
          Han et al. propose a two-stages business process analysis model for
increasing the efficiency and effectiveness of business processes: the
macro process analysis specifies at the business performance with the
highest influence and defines a to-be standard. The second stage –
micro analysis – uses process simulation and consists of a review of
the as-is-process and designs a to-be process [
          <xref ref-type="bibr" rid="ref26">26</xref>
          ].
        </p>
        <p>
          Another approach to harmonize management systems might be the
adaption of a new implementation project. Schmelzer &amp; Sesselmann
define following phases for the introduction of BPM: Positioning,
Identification, implementation, optimisation. [
          <xref ref-type="bibr" rid="ref27 ref43">27</xref>
          ].
Seven approaches with various phases have been identified in
literature. In the next section experts are interviewed about process
harmonization phases in practice.
        </p>
      </sec>
      <sec id="sec-3-2">
        <title>3.2 Qualitative Analysis</title>
        <p>
          A qualitative analysis is used to identify the procedure of process
harmonization in practice. Therefore twelve experts composed of
CEOs/COOs (33%) and quality managers (67%) of different service
sector companies have been interviewed and asked about their
experience in process harmonization. A qualitative semi-structured
interview has been conducted with experienced experts in process
harmonization after M&amp;A. The evaluation was performed by qualitative
content analysis according to Mayring [
          <xref ref-type="bibr" rid="ref28 ref29">28, 29</xref>
          ]. Interviewing experts is
aligned by specific problems and demand of a questionnaire and offers
the interviewee an extended space for the answer [
          <xref ref-type="bibr" rid="ref30">30</xref>
          ], so the
orientation is more subjective and interpretative [
          <xref ref-type="bibr" rid="ref31">31</xref>
          ].
        </p>
        <p>The experts have been requested to describe the procedure of
process harmonization in their company after an M&amp;A. They specified
their individual situation, good and bad experiences with the described
procedure and – most important – their satisfaction.</p>
        <p>Appendix 1 presents the procedure of choosing the relevant cases for
harmonization phases in practice. In this article two cases out of the
twelve are regarded: both cases have a satisfactory result and the
interviewed expert would apply the same procedure again; some of the
experts are quite dissatisfied, so for identifying process harmonization
phases best practices are needed; the used integration approach was
symbiosis or absorption; both cases are finished and long-term
experience is available.
Expert 1 recommends following strategy: 1. As-is analysis, 2.
Development of strategy (strategic objectives, strategic potentials, definition of
KPIs), 3. Strategic action plan, measurable picture of intended market
position, 4. Definition of structural organisation and process-oriented
organisation (structure, organisation chart, business processes,
process map), 5. Start with operational implementation.</p>
        <p>Expert 2 advises following procedure to include all merged companies
in a common certification: 1. Definition of cramp processes for
certification (coverage of minimum norm requirements), 2. Integration of
common quality culture (regulations, dynamic, reporting, …), 3. Definition
of responsibilities and interfaces (work groups existing of quality
management and single departments), 4. as-is record of processes with
swimlane diagram, 5. Step-by-step unification of processes with room
for individual processes, 6. Unification of IT systems, e.g. ERP system,
common documentation database, 7. Implementation, 8. Verification
by internal audits.
3.3</p>
      </sec>
      <sec id="sec-3-3">
        <title>Analysis and Interpretation</title>
        <p>
          Table 1 summarises the various proceedings presented in the
literature review in chapter 3.1 and qualitative analysis in chapter 3.2.
Number 1-7 present the approaches identified in the literature review
and number 8+9 show two cases of the expert interviews, so each row
describes one approach. The title gives a short description of the
approach, detailed information are described in Appendix 2.
N° Author
1 [
          <xref ref-type="bibr" rid="ref27 ref43">27</xref>
          ]
        </p>
        <p>systems
Two-stage 8 Expert Process
pbruoscineessss 1 harmonization
analysis
model
ePnrogcineesesring 9 2Expert cCeormtifmicaotnion</p>
      </sec>
      <sec id="sec-3-4">
        <title>4.1 Analysis Phase</title>
        <p>Concepts 6, 8, 9 suggest directly an as-is analysis, partly combined
with an as-is modelling of the processes. Further concepts let conclude
to an analysis phase as well. N° 1 (identification), 2 (requesting why is
something done and what needs to be done for) and understanding
the processes of concept 4 are also part of an analysis phase. Hence
in conclusion for understanding the processes of both merged
companies, an “analysis phase” is identified as first phase.</p>
        <p>The approach of micro and macro analysis of Han et al. (2009) will be
taken over and adapted to process harmonization. As there is needed
the consideration of the whole management system towards overall
regulation and control and the compliance with company objectives
and strategy, a macro perspective is necessary for process
harmonization. On the other hand a micro perspective on the single process level
is required. Each single process has to be regarded for the unification
of both, the available same process of the merged company part and
on the compliance with the macro level, means management system.
Hence each phase of process harmonization is regarded on
management system level and on process level. Regarding the steps of the
nine approaches, they jump between management system and
process level, too.</p>
        <p>
          It is imperative to observe the maturity of business processes, before
any re-designing or optimisations to a higher level are started [
          <xref ref-type="bibr" rid="ref5">5</xref>
          ]. So
on management system level a maturity assessment is constituted for
an overall analysis, whereas on process level a systematic process
analysis is advised.
        </p>
      </sec>
      <sec id="sec-3-5">
        <title>4.2 Conception Phase</title>
        <p>Next the “conception phase” is identified. All concepts except N° 5
have conceptual steps. Process optimisation, changed process design,
to-be modelling, definition of processes, the definition of
responsibilities and process interfaces and the unification of IT systems are part of
the concept phase on process level.</p>
        <p>
          The development of new quality standards, policy and objectives,
strategic specifications, the development of a new structure, the
integration of a new quality culture are all contents of conceptual work on an
overall management system basis – in compliance with the
organisations´ strategy. As already identified in the analysis phase, the
conception phase is also divided into a management system level and
process level. As strategic alignment is often identified as critical success
factor in business process management [
          <xref ref-type="bibr" rid="ref33 ref4">4, 33</xref>
          ] and even defined as
one of six core elements of BPM by vom Brocke &amp; Rosemann [
          <xref ref-type="bibr" rid="ref34">34</xref>
          ], the
strategic alignment shall be a first important key element for the
management system that needs to be compliant with the organizations
strategy.
        </p>
        <p>
          On process level Wirtz presents depending on the congruence and
efficiency of processes following possibilities for harmonization, which
differ in the level of integration intensity: standardization of processes,
adaption and optimization of processes, redesign of processes [
          <xref ref-type="bibr" rid="ref15">15</xref>
          ]. If
processes differ significantly, but possess high efficiency, the
standardization/unification of the processes is advisable. Similar processes
can be applied of the more efficient corporate part. If process
standards are low, the processes should be redesigned [
          <xref ref-type="bibr" rid="ref35">35</xref>
          ]. If processes
are largely congruent and efficiency high, the process can be taken
over and tuned if necessary. A subtle balance between integration and
differentiation must be found in the harmonization [
          <xref ref-type="bibr" rid="ref16">16</xref>
          ]. A too rigid
integration can restrict the flexibility of employees and block on specific
requirements. To avoid useless “overstandardization” Schäfermeyer &amp;
Rosenkranz recommend manager to differ carefully between routine
processes with a low complexity and nonroutine processes with a high
complexity to identify standardable processes and save time
investments for non-standardable processes [
          <xref ref-type="bibr" rid="ref36">36</xref>
          ]. Romero et al. come to a
similar result: companies that have less complex processes have more
harmonized processes and also more standardized processes [
          <xref ref-type="bibr" rid="ref37 ref8">8, 37</xref>
          ].
To support the management in priorization and selection of suitable
business processes for standardization, Zellner &amp; Laumann developed
a decision tool influenced by various process characteristics [
          <xref ref-type="bibr" rid="ref38">38</xref>
          ].
        </p>
      </sec>
      <sec id="sec-3-6">
        <title>4.3 Realization Phase</title>
        <p>
          After the development of a harmonization concept, things have to get
run and implemented. Although some of the considered approaches
stop with the development of the concept, the implementation is a vital
step in process harmonization. So the “implementation phase” is
identified as third phase. In respect to supposed shared responsibilities on
management system level and process owners this phase is again
divided into management system level and process level.
The chronological introduction of the adapted processes and
management system has to be decided. A step-by-step implementation
with a gradually iterative introduction in one department after another
takes longer, but reduces the risk and complexity of the project. In
contrary implementing the new concept into force on "Day X"
(Bigbang) means the simultaneous introduction in the entire company with
the advantage of high speed integration, but with the risk of a high
failure rate. A pilot-operated launch in one department is time-intensive
and causes additional administrative expenses through parallel worlds,
but failures are not repeated [
          <xref ref-type="bibr" rid="ref39">39</xref>
          ].
        </p>
      </sec>
      <sec id="sec-3-7">
        <title>4.4 Verification Phase</title>
        <p>The last phase is the “verification phase”. Approach N° 4 focuses on
quality management sustainability and continuous improvement, N° 9
verifies the implemented processes with internal audits, so the
verification is regarded as an effective closure of process harmonization. The
success of the harmonized processes and of the management system
can be judged in this phase.</p>
        <p>Expert 2 suggests the verification of process harmonization through
internal audits. A combination of system audit and process audits
measure the success of both levels, management system and the
single processes. With the combination of process controlling in internally
defined process KPIs and performance measurement of the process
output the verification can be measured effectively.</p>
        <p>Process management maturity assessments shall be repeated
periodically to get an overview of the development of continuous
improvement. With the maturity of a process and of the management system
compared with the origin maturity result during the analysis phase, the
verification is achievable as well. Using the same maturity model
allows a direct comparison. A better maturity result for the same process
or the management system as in the analysis phase evidences a
successful conception and implementation.</p>
        <p>Fig. 1. shows the process harmonization phases in an overview,
devided in management system (MS) level and process level.</p>
        <p>MS level
Process</p>
        <p>level
MS – management system
5</p>
      </sec>
    </sec>
    <sec id="sec-4">
      <title>Discussion</title>
      <p>Analysis
phase</p>
      <p>Maturity
assessment</p>
      <p>Process
analysis</p>
      <p>Conception</p>
      <p>phase
Strategic
alignment</p>
      <p>Process
optimization</p>
      <p>Realization
phase</p>
      <p>MS
implementation</p>
      <p>Process
implementation</p>
      <p>Verification</p>
      <p>phase
MS verification</p>
      <p>Process
verification</p>
      <p>
        Fig. 2. Process Harmonization Phase Model
Given the situation of a symbiosis or absorption, the organisation is
interested in assessing its current business processes and
management system situation. For the analysis phase maturity models are
required for both, the double existing management system and each
double existing single process of the merged organizations. Maturity of
processes and management system might be quite different.
None of the experts mentioned the maturity assessment during the
analysis phase explicitly. Most of them presumed the comparability of
the double existing processes and management systems as
selfevident. One expert described the procedure as the use of
“horsesense”. Hence the experts used no defined and well-known
methodology for comparing and analysing the business processes. As a defined
methodology conveys neutrality and professionalism to an often tense
situation with divided interests, the application of a maturity model is
strongly recommended. One merged company part might hold a very
mature and stable management system, but single processes are
superior in the other part. To differentiate between management system
level and considering the maturity of each process as well, leads to an
enhanced result. The premise of course is the sufficient consideration
in the conception phase. Results are more accurate if different levels
for the assessment are involved. Middle and low management tend to
be more critical than top management and operational staff [
        <xref ref-type="bibr" rid="ref40">40</xref>
        ].
Hammer (2007) encourages assessments with different staff level as
well to illustrate possibly existing homogeneity in understanding of
processes and assessment criteria [
        <xref ref-type="bibr" rid="ref5">5</xref>
        ]. A 360-degree-feedback with
involvement of customers and suppliers is conceivable [
        <xref ref-type="bibr" rid="ref40">40</xref>
        ].
In context with the implementation phase the integration speed is a
controversial issue. On the one hand, a high integration speed ensures
competitiveness due to a relatively short state of excitement; on the
other hand, blockers within the organization might take the time to act
[
        <xref ref-type="bibr" rid="ref42">42</xref>
        ]. 25% of the experts state in their best practices they prefer a
longer period of time to get to know each other, and thus a slower
integration speed. This affects also the implementation strategy. As shown in
chapter 5.3 the big-bang implementation is the quickest variant
compared with step-by-step or pilot introduction. The variant to be
preferred has be defined individually in the merged companies and
aligned to the general PMI strategy.
      </p>
      <p>
        Process harmonization is a complex project. The more significance
has the continuous strategic view on the whole project on a
management system basis. A harmonized process past on the defined strategy
and non-conform with the overall management system is not expected
to perform as a whole. So the combined consideration of process level
and management system level as well as strategic alignment is
essential. This does not mean that individual variations in business
processes are not allowed. In contrary, the experts agree upon the necessity
of reasonable process variations, e.g. for the fulfilment of a special
customer requirement necessary at one department only. Process
harmonization does not try to make standards uniform, it looks how
standards fit together [
        <xref ref-type="bibr" rid="ref7">7</xref>
        ]. In the conception phase the trade-off
between process standardization and process variants has to considered
carefully, although with the number of variants the process
harmonization is measurable [
        <xref ref-type="bibr" rid="ref41">41</xref>
        ].
      </p>
      <p>A third of the experts state a good satisfaction with the process
harmonization results, although most of them would apply a different
procedure next time. So the long-term results can consequence in a
positive satisfaction with the process harmonization procedure after a
series of corrective actions. The main part of the interviewees shared
lessons learned initiated by difficulties during the harmonization
project. It might be assumed that companies need more than one M&amp;A
before they proceed post merger integration successfully. The
milestones identified in the process harmonization phase model at hand
are a key prerequisite for executing a successful post merger process
harmonization.</p>
    </sec>
    <sec id="sec-5">
      <title>Summary, Conclusion and Limitations</title>
      <p>The objective of this article is the definition of a phase model for
process harmonization in the post merger integration phase. Various
approaches of the literature have been scanned and complemented with
a qualitative research to obtain the milestones of a process
harmonization. As a central result can be concluded that there is no special
methodology with defined phases for process harmonization in literature
available, so a combination of the different approaches is regarded as
the optimum for process harmonization. This article provides two
central results: First, process harmonization phases are divided into
management system level and process level. Second, process
harmonization phases exist of analysis phase, conception phase, realization
phase and verification phase. Further this article presents a general
overview of possible methods for each single phase.</p>
      <p>The author would like to indicate to a limitation concerning the expert
interviews. Other experts might have different best practices. However
both are typical examples of the executed qualitative analysis, so the
cases are regarded as sufficient. Next the mentioned methods are not
evaluated empirically. The purpose of this article was the definition of
the phases and not the definition of methods within the phases. So as
a next research step proper methods for the defined phases should be
evaluated empirically.
7</p>
    </sec>
    <sec id="sec-6">
      <title>Appendix 1</title>
      <p>Question in
inter</p>
      <p>view guideline
How did you approach
the process
harmonization?
Please explain how
the process
harmonization was expired.</p>
      <p>How was the
harmonization carried out on
the process level, in
the individual
process?
How satisfied are you
with the result of the
process
harmonization?
What would you do
differently if you start
the project again?</p>
      <p>Table: Results Expert Interviews
Variable
Integration
approach
Procedure
Procedure
process
Satisfaction
Lessons
Learned</p>
      <p>Variable
characteris</p>
      <p>tic
Symbiosis,
absorption,
preservation,
stand-alone
Description
of
interviewee (open
answer)
Description
of
interviewee (open
answer)
Very
satisfied,
satisfied,
undecided,
unsatisfied, very
unsatisfied,
not stated
Exactly the
same,
different
procedure, not
stated</p>
      <p>Result
Absorption: 27%
Symbiosis: 20%
Stand-alone: 7%
Preservation:
46%
individual
scription
each case
individual
scription
each case
defor
defor
Very satisfied: 3
Satisfied: 1
Undecided: 4
Unsatisfied: 1
Very unsatisfied:
1
Not stated: 2
Not stated: 5
Exactly the
same: 2
Different
procedure: 5</p>
      <p>Relevance for
process phases
Relevance:
included in case
study in chapter
3.3 with symbiosis
or absorption
approach only
Identification of
main phases on
general level
Identification of
main phases on
single process
level
Relevance:
included in case
study in chapter
3.3 only with good
or very good
satisfaction
Relevance:
included in case
study in chapter
3.3 only if expert
would proceed in
the same way
again
The first column shows the questions asked to the experts. All
questions are open questions, so the answers of the experts are quite
different in content and length. Each question has been coded according to
column “variable” with the possible content described in column
“variable characteristic”. Column “result” shows the result after encryption.
The two questions for describing the process harmonization was
evaluated individually, the answers could not be coded unified. All other
answers have been summarized according to the variable
characteristic. The last column “relevance for process phases” describes the
importance of each row for the following selection of the case studies.
Only the combination of absorption or symbiosis approach with a
satisfactory result and the statement of an expert he/she would procede in
exactly the same way again, qualifies the case to be regarded in
chapter 3.3.</p>
      <p>PEQMS
2
3
4
5
6
7
8
9
Inter
terview
expert
1
Inter
terview
expert
2
2. integration of
management
tools
8. Vernier
adjustment
and
stabilisa</p>
      <p>tion
4. Process
optimisation
4. As-is
record of
processes
8.
Verification by
internal audits
The nine approaches contain certain phases, described as steps in the fourth column.</p>
    </sec>
  </body>
  <back>
    <ref-list>
      <ref id="ref1">
        <mixed-citation>
          1.
          <string-name>
            <surname>Haspeslagh</surname>
            ,
            <given-names>P.C.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Jemison</surname>
            ,
            <given-names>D.B.</given-names>
          </string-name>
          :
          <article-title>Managing acquisitions: creating value through corporate renewal</article-title>
          . The Free Press, New York (
          <year>1991</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref2">
        <mixed-citation>
          2.
          <string-name>
            <surname>Rohloff</surname>
            ,
            <given-names>M.:</given-names>
          </string-name>
          <article-title>Advances in business process management implementation based on a maturity assessment and best practice exchange</article-title>
          .
          <source>Inf</source>
          . Syst. E-bus.
          <source>Manag</source>
          .
          <volume>9</volume>
          ,
          <fpage>383</fpage>
          -
          <lpage>403</lpage>
          (
          <year>2011</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref3">
        <mixed-citation>
          3.
          <string-name>
            <surname>Jochem</surname>
            ,
            <given-names>R.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Geers</surname>
            ,
            <given-names>D.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Heinze</surname>
            ,
            <given-names>P.</given-names>
          </string-name>
          :
          <article-title>Maturity measurement of knowledge-intensive business processes</article-title>
          .
          <source>TQM J</source>
          .
          <volume>23</volume>
          ,
          <fpage>377</fpage>
          -
          <lpage>387</lpage>
          (
          <year>2011</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref4">
        <mixed-citation>
          4.
          <string-name>
            <surname>Skrinjar</surname>
            ,
            <given-names>R.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Trkman</surname>
            ,
            <given-names>P.</given-names>
          </string-name>
          :
          <article-title>Increasing process orientation with business process management: Critical practices'</article-title>
          .
          <source>Int. J. Inf. Manage</source>
          .
          <volume>33</volume>
          ,
          <fpage>48</fpage>
          -
          <lpage>60</lpage>
          (
          <year>2013</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref5">
        <mixed-citation>
          5.
          <string-name>
            <surname>Hammer</surname>
            ,
            <given-names>M.:</given-names>
          </string-name>
          <article-title>The Process Audit</article-title>
          .
          <source>Harv. Bus. Rev. April</source>
          ,
          <volume>1</volume>
          -
          <fpage>15</fpage>
          (
          <year>2007</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref6">
        <mixed-citation>
          6.
          <string-name>
            <surname>Fernandez</surname>
            ,
            <given-names>J.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Bhat</surname>
          </string-name>
          , J.:
          <article-title>Addressing the complexities of global process harmonization</article-title>
          . In: Handbook of Research on Complex Dynamic Process Management:
          <article-title>Techniques for Adaptability in Turbulent Environments: Techniques for Adaptability in Turbulent Environments</article-title>
          . pp.
          <fpage>368</fpage>
          -
          <lpage>385</lpage>
          . IGI Global (
          <year>2010</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref7">
        <mixed-citation>
          7.
          <string-name>
            <surname>Ricken</surname>
            ,
            <given-names>A.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Steinhorst</surname>
            ,
            <given-names>A.</given-names>
          </string-name>
          :
          <article-title>Standardization or Harmonization? You need Both</article-title>
          .
          <source>BPTrends</source>
          . 1-
          <fpage>5</fpage>
          (
          <year>2005</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref8">
        <mixed-citation>
          8.
          <string-name>
            <surname>Romero</surname>
            ,
            <given-names>H.L.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Dijkman</surname>
            ,
            <given-names>R.M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Grefena</surname>
          </string-name>
          , P.W.P.J., van
          <string-name>
            <surname>Weele</surname>
            ,
            <given-names>A.J.</given-names>
          </string-name>
          , de Jong, A.:
          <article-title>Measures of process harmonization</article-title>
          .
          <source>Inf. Softw. Technol</source>
          .
          <volume>63</volume>
          ,
          <fpage>31</fpage>
          -
          <lpage>43</lpage>
          (
          <year>2015</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref9">
        <mixed-citation>
          9.
          <string-name>
            <surname>Schönreiter</surname>
            ,
            <given-names>I.</given-names>
          </string-name>
          :
          <article-title>Bedarfe zur Prozessharmonisierung in fusionierten Dienstleistungsunternehmen im Zeitalter Quality 4.0</article-title>
          . In: Winzer,
          <string-name>
            <surname>P</surname>
          </string-name>
          . (ed.)
          <source>Herausforderungen der Digitalisierung</source>
          . pp.
          <fpage>35</fpage>
          -
          <lpage>49</lpage>
          . Shaker,
          <string-name>
            <surname>Aachen</surname>
          </string-name>
          (
          <year>2016</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref10">
        <mixed-citation>
          10.
          <string-name>
            <surname>Müller-Stewens</surname>
            ,
            <given-names>G.</given-names>
          </string-name>
          :
          <article-title>Mergers &amp; Acquisitions Analysen, Trends und Best Practices</article-title>
          . Schäffer-Poeschel,
          <source>Stuttgart</source>
          (
          <year>2010</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref11">
        <mixed-citation>
          11.
          <string-name>
            <surname>Jansen</surname>
            ,
            <given-names>S.A.</given-names>
          </string-name>
          :
          <article-title>Mergers &amp; Acquisitions Unternehmensakquisitionen und - kooperationen ; eine strategische, organisatorische und kapitalmarkttheoretische Einführung</article-title>
          . Gabler,
          <string-name>
            <surname>Wiesbaden</surname>
          </string-name>
          (
          <year>2008</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref12">
        <mixed-citation>
          12.
          <string-name>
            <surname>Marchand</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          :
          <article-title>When the south takes over the north: Dynamics Of up-market integrations by emerging multinationals</article-title>
          .
          <source>M@n@gement. 18</source>
          ,
          <fpage>31</fpage>
          -
          <lpage>53</lpage>
          (
          <year>2015</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref13">
        <mixed-citation>
          13.
          <string-name>
            <surname>Marks</surname>
            ,
            <given-names>M.L.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Mirvis</surname>
            ,
            <given-names>P.H.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Brajkovich</surname>
            ,
            <given-names>L.F.</given-names>
          </string-name>
          :
          <article-title>Making Mergers and Acquisitions Work: Strategic and Psychological Preparation [and Executive Commentary]</article-title>
          .
          <source>Acad. Manag. Exec</source>
          .
          <volume>15</volume>
          ,
          <fpage>80</fpage>
          -
          <lpage>94</lpage>
          (
          <year>2001</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref14">
        <mixed-citation>
          14.
          <string-name>
            <surname>Vieru</surname>
            ,
            <given-names>D.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Rivard</surname>
            ,
            <given-names>S.:</given-names>
          </string-name>
          <article-title>The Dilemma of Integration Versus Autonomy: Knowledge Sharing in Post-Merger IS Development</article-title>
          .
          <source>In: Twenty Ninth International Conference on Information Systems</source>
          . pp.
          <fpage>1</fpage>
          -
          <lpage>11</lpage>
          . , Paris (
          <year>2008</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref15">
        <mixed-citation>
          15.
          <string-name>
            <surname>Wirtz</surname>
            ,
            <given-names>B.W.</given-names>
          </string-name>
          : Mergers &amp; Acquisitions Management. Springer Gabler, Wiesbaden (
          <year>2014</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref16">
        <mixed-citation>
          16.
          <string-name>
            <surname>Jones</surname>
            ,
            <given-names>G.R.</given-names>
          </string-name>
          :
          <article-title>Organizational theory, design, and change</article-title>
          .
          <source>Pearson</source>
          , Boston, Mass. ; Upper Saddle River, NJ ; Munich [u.a.] (
          <year>2012</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref17">
        <mixed-citation>
          17.
          <string-name>
            <surname>Jurisch</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Palka</surname>
            ,
            <given-names>W.</given-names>
          </string-name>
          :
          <article-title>Which capabilities matter for successful business process change? Bus</article-title>
          . Process ….
          <volume>20</volume>
          ,
          <fpage>47</fpage>
          -
          <lpage>67</lpage>
          (
          <year>2014</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref18">
        <mixed-citation>
          18.
          <string-name>
            <surname>Gaitanides</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          :
          <article-title>Prozessmanagement zwischen Engineering und Reengineering? Zeitschrift Führung + Organ</article-title>
          .
          <source>ZfO. 6</source>
          ,
          <fpage>305</fpage>
          -
          <lpage>306</lpage>
          (
          <year>2006</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref19">
        <mixed-citation>
          19.
          <string-name>
            <surname>Pohland</surname>
            ,
            <given-names>S.</given-names>
          </string-name>
          :
          <article-title>Flexibilisierung von Geschäftsprozessen Konzepte und Praxisbeispiele</article-title>
          .
          <source>OLDENBOURG WISSENSCHAFTSVERLAG</source>
          ,
          <string-name>
            <surname>München</surname>
          </string-name>
          (
          <year>2009</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref20">
        <mixed-citation>
          20.
          <string-name>
            <surname>Hammer</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Champy</surname>
          </string-name>
          , J.:
          <article-title>Business reengineering die Radikalkur für das Unternehmen</article-title>
          . Campus-Verl., Frankfurt u.a. (
          <year>1994</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref21">
        <mixed-citation>
          21.
          <string-name>
            <surname>Hammer</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Stanton</surname>
            ,
            <given-names>S.A.</given-names>
          </string-name>
          :
          <article-title>Die Reengineering-Revolution Handbuch für die Praxis</article-title>
          . Campus-Verl., Frankfurt [u.a.] (
          <year>1995</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref22">
        <mixed-citation>
          22.
          <string-name>
            <surname>Jochem</surname>
            ,
            <given-names>R.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Geers</surname>
            ,
            <given-names>D.</given-names>
          </string-name>
          :
          <article-title>Prozessgestaltung mit Business Process Reengineering</article-title>
          . In: Prozessmanagement: Strategien, Methoden, Umsetzung. pp.
          <fpage>77</fpage>
          -
          <lpage>99</lpage>
          . Symposion Publ.,
          <string-name>
            <surname>Düsseldorf</surname>
          </string-name>
          (
          <year>2010</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref23">
        <mixed-citation>
          23.
          <string-name>
            <surname>Karapetrovic</surname>
            ,
            <given-names>S.</given-names>
          </string-name>
          :
          <article-title>Strategies for the integration of management systems and standards</article-title>
          .
          <source>TQM Mag</source>
          .
          <volume>14</volume>
          ,
          <fpage>61</fpage>
          -
          <lpage>67</lpage>
          (
          <year>2002</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref24">
        <mixed-citation>
          24.
          <string-name>
            <surname>Sampaio</surname>
            ,
            <given-names>P.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Saraiva</surname>
            ,
            <given-names>P.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Domingues</surname>
            ,
            <given-names>P.</given-names>
          </string-name>
          :
          <source>Management systems: integration or addition? Int. J. Qual. Reliab. Manag</source>
          .
          <volume>29</volume>
          ,
          <fpage>402</fpage>
          -
          <lpage>424</lpage>
          (
          <year>2012</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref25">
        <mixed-citation>
          25.
          <string-name>
            <surname>Ntungo</surname>
            ,
            <given-names>C.</given-names>
          </string-name>
          :
          <article-title>Quality Culture in Government: The Pursuit of a Quality Management Model</article-title>
          .
          <source>Total Qual. Manag. Bus. Excell</source>
          .
          <volume>18</volume>
          ,
          <fpage>135</fpage>
          -
          <lpage>145</lpage>
          (
          <year>2007</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref26">
        <mixed-citation>
          26.
          <string-name>
            <surname>Han</surname>
            ,
            <given-names>K.H.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Kang</surname>
            ,
            <given-names>J.G.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Song</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          :
          <article-title>Two-stage process analysis using the processbased performance measurement framework and business process simulation</article-title>
          .
          <source>Expert Syst. Appl</source>
          .
          <volume>36</volume>
          ,
          <fpage>7080</fpage>
          -
          <lpage>7086</lpage>
          (
          <year>2009</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref27">
        <mixed-citation>
          27.
          <string-name>
            <surname>Schmelzer</surname>
            ,
            <given-names>H.J.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Sesselmann</surname>
            ,
            <given-names>W.:</given-names>
          </string-name>
          <article-title>Geschäftsprozessmanagement in der Praxis Kunden zufrieden stellen ; Produktivität steigern ; Wert erhöhen</article-title>
          . Hanser,
          <string-name>
            <surname>München</surname>
          </string-name>
          (
          <year>2010</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref28">
        <mixed-citation>
          28.
          <string-name>
            <surname>Mayring</surname>
            ,
            <given-names>P.</given-names>
          </string-name>
          :
          <article-title>Qualitative Inhaltsanalyse: Grundlagen und TechnikenGrundlagen und Techniken</article-title>
          . Beltz, Weinheim [u.a.] (
          <year>2015</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref29">
        <mixed-citation>
          29.
          <string-name>
            <surname>Mayring</surname>
            ,
            <given-names>P.</given-names>
          </string-name>
          :
          <article-title>Qualitative Content Analysis: Theoretical Foundation, Basic Procedures and Software Solution</article-title>
          . www.beltz.de,
          <string-name>
            <surname>Klagenfurt</surname>
          </string-name>
          (
          <year>2014</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref30">
        <mixed-citation>
          30.
          <string-name>
            <surname>Friedrichs</surname>
          </string-name>
          , J.:
          <article-title>Methoden empirischer Sozialforschung</article-title>
          . Westdt. Verl.,
          <string-name>
            <surname>Opladen</surname>
          </string-name>
          (
          <year>1990</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref31">
        <mixed-citation>
          31.
          <string-name>
            <surname>Borchardt</surname>
            ,
            <given-names>A.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Göthlich</surname>
            ,
            <given-names>S.E.</given-names>
          </string-name>
          :
          <article-title>Erkenntnisgewinnung durch Fallstudien</article-title>
          . In: Albers,
          <string-name>
            <given-names>S.</given-names>
            ,
            <surname>Klapper</surname>
          </string-name>
          ,
          <string-name>
            <given-names>D.</given-names>
            ,
            <surname>Konradt</surname>
          </string-name>
          ,
          <string-name>
            <given-names>U.</given-names>
            ,
            <surname>Walter</surname>
          </string-name>
          ,
          <string-name>
            <given-names>A.</given-names>
            , and
            <surname>Wolf</surname>
          </string-name>
          ,
          <string-name>
            <surname>J</surname>
          </string-name>
          . (eds.) Methodik der empirischen Forschung. pp.
          <fpage>37</fpage>
          -
          <lpage>54</lpage>
          . Dt. Univ.-Verl.,
          <string-name>
            <surname>Wiesbaden</surname>
          </string-name>
          (
          <year>2006</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref32">
        <mixed-citation>
          32.
          <string-name>
            <surname>Scheer</surname>
          </string-name>
          , A.-W.,
          <string-name>
            <surname>Hoffmann</surname>
            ,
            <given-names>M.:</given-names>
          </string-name>
          <article-title>The Process of Business Process Management</article-title>
          . In: vom Brocke, J. and
          <string-name>
            <surname>Rosemann</surname>
          </string-name>
          , M. (eds.)
          <source>Handbook on Business Process Management 2</source>
          . pp.
          <fpage>351</fpage>
          -
          <lpage>380</lpage>
          . Springer Berlin Heidelberg, Berlin Heidelberg (
          <year>2015</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref33">
        <mixed-citation>
          33.
          <string-name>
            <surname>Bai</surname>
            ,
            <given-names>C.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Sarkis</surname>
            ,
            <given-names>J.:</given-names>
          </string-name>
          <article-title>A grey-based DEMATEL model for evaluating business process management critical success factors</article-title>
          .
          <source>Int. J. Prod. Econ</source>
          .
          <volume>146</volume>
          ,
          <fpage>281</fpage>
          -
          <lpage>292</lpage>
          (
          <year>2013</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref34">
        <mixed-citation>
          34. vom Brocke, J.,
          <string-name>
            <surname>Rosemann</surname>
            ,
            <given-names>M.:</given-names>
          </string-name>
          <article-title>Handbook on Business Process Management 1</article-title>
          . Springer Berlin Heidelberg, Berlin Heidelberg (
          <year>2010</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref35">
        <mixed-citation>
          35.
          <string-name>
            <surname>Vogel</surname>
            ,
            <given-names>D.H.:</given-names>
          </string-name>
          <article-title>M &amp; A Ideal und Wirklichkeit</article-title>
          . Gabler Verlag, Wiesbaden (
          <year>2002</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref36">
        <mixed-citation>
          36.
          <string-name>
            <surname>Schäfermeyer</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Rosenkranz</surname>
            ,
            <given-names>C.</given-names>
          </string-name>
          : “To standardize or not to standardize?”
          <article-title>- Understanding the effect of business process complexity on business process standardization</article-title>
          .
          <source>In: ECIS 2011 proceedings (</source>
          <year>2011</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref37">
        <mixed-citation>
          37.
          <string-name>
            <surname>Romero</surname>
            ,
            <given-names>H.L.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Dijkman</surname>
            ,
            <given-names>R.M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Grefen</surname>
          </string-name>
          , P.W.P.J., van
          <string-name>
            <surname>Weele</surname>
            ,
            <given-names>A.J.</given-names>
          </string-name>
          :
          <article-title>Factors that Determine the Extent of Business Process Standardization and the Subsequent Effect on Business Performance</article-title>
          .
          <source>Bus. Inf. Syst. Eng</source>
          .
          <volume>57</volume>
          ,
          <fpage>261</fpage>
          -
          <lpage>270</lpage>
          (
          <year>2015</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref38">
        <mixed-citation>
          38.
          <string-name>
            <surname>Zellner</surname>
            ,
            <given-names>P.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Laumann</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          :
          <article-title>Evaluation of Business Processes for Business Process Standardization</article-title>
          .
          <source>In: PACIS 2013 Proceedings</source>
          . p.
          <source>Paper</source>
          <volume>248</volume>
          (
          <year>2013</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref39">
        <mixed-citation>
          39.
          <string-name>
            <surname>Hansmann</surname>
            ,
            <given-names>H.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Laske</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Redmer</surname>
            ,
            <given-names>L.</given-names>
          </string-name>
          :
          <string-name>
            <surname>Einführung der Prozesse -</surname>
            Prozess-Rollout. In: Becker,
            <given-names>J.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Kugeler</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          , and
          <string-name>
            <surname>Rosemann</surname>
          </string-name>
          , M. (eds.)
          <article-title>Prozessmanagement: ein Leitfaden zur prozessorientierten Organisationsgestaltung</article-title>
          . pp.
          <fpage>269</fpage>
          -
          <lpage>298</lpage>
          . Springer, Berlin [u.a.] (
          <year>2005</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref40">
        <mixed-citation>
          40.
          <string-name>
            <surname>van Looy</surname>
            ,
            <given-names>A.</given-names>
          </string-name>
          :
          <article-title>An Experiment for Measuring Business Process Maturity with Different Maturity Models</article-title>
          .
          <source>In: ECIS 2015 Proceedings</source>
          . p.
          <source>Paper</source>
          <volume>192</volume>
          (
          <year>2015</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref41">
        <mixed-citation>
          41.
          <string-name>
            <surname>Romero</surname>
            ,
            <given-names>H.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Dijkman</surname>
            ,
            <given-names>R.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Grefen</surname>
          </string-name>
          , P.,
          <string-name>
            <surname>van Weele</surname>
            ,
            <given-names>A.</given-names>
          </string-name>
          :
          <source>Harmonization of Business Process Models. Lect. Notes Bus. Inf. Process</source>
          .
          <volume>66</volume>
          ,
          <fpage>13</fpage>
          -
          <lpage>24</lpage>
          (
          <year>2011</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref42">
        <mixed-citation>
          42.
          <string-name>
            <surname>Maire</surname>
            ,
            <given-names>S.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Collerette</surname>
            ,
            <given-names>P.</given-names>
          </string-name>
          :
          <article-title>International post-merger integration: Lessons from an integration project in the private banking sector</article-title>
          .
          <source>Int. J. Proj. Manag</source>
          .
          <volume>29</volume>
          ,
          <fpage>279</fpage>
          -
          <lpage>294</lpage>
          (
          <year>2011</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref43">
        <mixed-citation>
          <source>[27] [22] [23] [26] [18] [24] 2.</source>
          <article-title>Unification of main processes, objectives, resources 2. Understanding quality of assessment and taxation services 6. Using quality data for continuous improvement 2. Micro analysis 2. As-is modelling 4. Optimisation 4. Elimination of old processes and structures 4. Identifying and understanding business processes 8. Option to register with the ISO 9001 standard 4</article-title>
          . Definition structure, organisation, processes, process map
        </mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>