        <article-title>Integrated Requirements Baseline Management for Complex Software System</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>Sergio Funtò</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Italy sergio.funto@eng.it</string-name>
        </contrib>
      </contrib-group>
      <abstract>
        <p>-This paper reports on experiences from managing the requirements baseline in regards to Complex Software System. The requirements management of these starts from the architectural structure of the whole system by defining the high-level functionalities. The complex systems are architecturally organized in separate modules and each of them gives support to the development of one or more functionalities of the whole systems. The flow down of the whole system requirements towards the requirements of each module and the monitoring of the related traceability are the core activities within the baseline management. Moreover, the development plan of a complex system foreseen more than one deliveries each one characterized by new features and functionalities compared to the previous one. Each system version is defined by the set of the corresponding modules. This scenario requires a project development environment where Project Management (PM) and System Engineering (SM) activities are strictly connected and integrated. The presented approach takes into account the system development life cycle identified by quality standard adopted for the software development and documentation. Adopted methods, tools and artifacts are presented in order to describe the proposed processes taking into account PM and SE activities integration mechanisms episodic and pervasive.</p>
      </abstract>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>Keywords—Requirements Management Management, Project Management and Integration Processes, Scope</title>
      <p>System Engineering
I.</p>
    </sec>
    <sec id="sec-2">
      <title>INTRODUCTION</title>
      <p>This paper presents experiences from defining and managing the
requirements baseline related to Complex Software System (CSS).</p>
      <p>Starting from the general definition of a Complex System, are
introduced the main concepts and elements to be taken into account
in order to describe the proposed methods and tools.</p>
      <p>In this regards, a specific focus is dedicated to identify:
the design process/model adopted as references for the system
development process;
the artifacts and documents used to describes the adopted
software development life-cycle;
the methods and tools used in regards to the Project
Management (PM) and System Engineering (SM) integrated
activities to support the design process phases.</p>
      <p>The next Section II describes the background of the work, and
introduces the Military Standard 498 (MIL-STD-498), the Waterfall
Model and the referred integration mechanism in regards to PM-SE
activities.</p>
      <p>Section III introduces the operative scenario used as reference to
describe the proposed requirements baseline methods and tools as
reported in Section IV.</p>
      <p>II.</p>
    </sec>
    <sec id="sec-3">
      <title>BACKGROUND</title>
      <p>A.</p>
      <sec id="sec-3-1">
        <title>What is a Complex Software Systems</title>
        <p>The definition of a CSS is strictly related to the identification of
the properties of a Complex System and to the features of a Software
System.</p>
      </sec>
      <sec id="sec-3-2">
        <title>1) The Complex Systems</title>
        <p>A Complex System is composed of many components which may
interact with each other. In many cases it is useful to represent such a
system as a network where the nodes represent the components and
the links their interactions. The behavior of a Complex Systems is
intrinsically difficult to model due to the dependencies, relationships,
or interactions between their parts or between a given system and its
environment. Systems that are complex have distinct properties that
arise from these relationships, such as:
nonlinearity, emergence, spontaneous order, adaptation, and feedback
loops, among others. Because such systems appear in a wide variety
of fields, the commonalities among them have become the topic of
their own independent area of research.</p>
      </sec>
      <sec id="sec-3-3">
        <title>2) Properties of a Complex Systems</title>
        <p>Abstracting from the quotations related to Complex Systems and
drawing on the culture of complexity science as expressed through a
wide range of popular as well as academic sources, the following list
of properties can be associated with the idea of a complex system [1]:
Nonlinearity - is often considered to be essential for complexity.
A system is linear if one can add any two solutions to the
equations that describe it and obtain another, and multiply any
solution by any factor and obtain another. Nonlinearity means
that this superposition principle does not apply;
as specification, test results, end-user documentation, maintenance
records, etc.
•
•
•
•
•
•
•</p>
        <p>Feedback - is an important necessary condition for complex
dynamical systems. A part of a system receives feedback when
the way its neighbors interact with it at a later time depends on
how it interacts with them at an earlier time;
Spontaneous order - given the above it is clear that a
fundamental idea in complex systems research is that of order in
a system’s behavior that arises from the aggregate of a very
large number of uncoordinated interactions between elements;</p>
      </sec>
      <sec id="sec-3-4">
        <title>Robustness and lack of central control - the order in complex</title>
        <p>systems is said to be robust because, being distributed and not
centrally produced, it is stable under perturbations of the system.
A centrally controlled system on the other hand is vulnerable to
the malfunction of a few key components;
Emergence - is a notoriously murky notion with a long history in
the philosophy of science. People talking about complexity
science often associate it with the limitations of reductionism. A
strong, perhaps the strongest, notion of emergence is that
emergent objects, properties or processes exhibit something
called ’downwards causation’;
Hierarchical organization - In complex systems there are often
many levels of organization that can be thought of as forming a
hierarchy of system and sub-system. Emergence occurs because
order that arises from interactions among parts at a lower level is
robust;
Numerosity - the kind of hierarchical organization that emerges
and gives rise to all the features listed above, only exists if the
system consists of a large number of parts, and usually, only if
they are engaged in many interactions;
Remarks - The above discussion makes it clear that the
definition of complexity and complex systems is not
straightforward and is potentially philosophically interesting.
The notions of order and organization introduced above and the
idea of feedback are suggestive of an information-theoretic
approach to complexity, since complex systems can be often
helpfully be construed as maintaining their order and
hierarchical organization by the exchange of information among
their parts.
3)</p>
      </sec>
      <sec id="sec-3-5">
        <title>The features of the Software Systems</title>
        <p>A Software System is characterized by inter
communicating components based on software forming part of
a computer system (a combination of hardware and software). It
consists of a number of separate programs, configuration files, which
are used to set up these programs, system documentation, which
describes the structure of the system, and user documentation, which
explains how to use the system.</p>
        <p>The term Software System should be distinguished from the terms
‘computer program’ and ‘software’. The term computer program
generally refers to a set of instructions (source, or object code) that
perform a specific task. However, a software system generally refers
to a more encompassing concept with many more components such
The use of the term software system is at times related to the
application of systems theory approaches in the context of software
engineering. A software system consists of several separate computer
programs and associated configuration files, documentation, etc., that
operate together [2]. The concept is used in the study of large and
complex software, because it focuses on the major components of
software and their interactions. It is also related to the field
of software architecture.</p>
        <p>Once introduced the definition and the characteristics/properties
of the CSS, the next step is to identify the adopted system design
process.</p>
      </sec>
      <sec id="sec-3-6">
        <title>1) The Waterfall Model</title>
        <p>The Waterfall Model can be described through a sequential
(noniterative) design process, used in software development for large
systems, in which progress is seen as flowing steadily downwards
(like a waterfall) through the phases of conception,
initiation, analysis, design, construction, testing, production,
implementation and maintenance.</p>
        <p>In the original waterfall model [3], the following phases are
followed in order: System and software requirements: captured in
a product requirements document; Analysis: resulting
in models, schema, and business rules; Design: resulting in
the software architecture; Coding: the development, proving,
and integration of software; Testing: the systematic discovery
and debugging of defects; Operations:
the installation, migration, support, and maintenance of complete
systems.</p>
        <p>The United States Department of Defense (DOD) captured this
approach in the DOD-STD-2167A, their standards for working with
software development contractors, which stated that "the contractor
shall implement a software development cycle that includes the
following six phases: Preliminary Design, Detailed Design, Coding
and Unit Testing, Integration, and Testing. The DOD-STD-2167A is
the precursor of the MIL-STD-498 introduced hereafter.</p>
      </sec>
      <sec id="sec-3-7">
        <title>C. The Software System Description</title>
        <p>Following the identification of the adopted system design
process, another core step is the specification of the artifacts and
documents used to describes the adopted software development
lifecycle.</p>
      </sec>
      <sec id="sec-3-8">
        <title>1) The Military Standard 498</title>
        <p>The Military-Standard-498 (MIL-STD-498) is a United
States military standard whose purpose was to establish uniform
requirements for software development and documentation. It
replaced the DOD-STD-2167A, DOD-STD-7935A, and
DOD-STD1703. It was meant as an interim standard, to be in effect for about
two years until a commercial standard was developed.</p>
        <p>Unlike previous efforts the MIL-STD-498 was the first attempt at
a truly comprehensive description of the systems development
lifecycle. It was the baseline that all of the ISO, IEEE, and related efforts
after it replaced. It also contains much of the material that the
subsequent professionalization of project management covered in the</p>
      </sec>
      <sec id="sec-3-9">
        <title>Project Management Body of Knowledge (PMBOK) [7].</title>
      </sec>
      <sec id="sec-3-10">
        <title>2) MIL-STD-498 Data Idem Descriptions</title>
        <p>The MIL-STD-498 standard specifies [4] the development and
documentation in terms of 22 Data Item Descriptions (DIDs) from
which an effort will select to conduct the system development and
support efforts. Each DID generically describes the required content
of a data item, a file or document that describes the system or some
aspect of the system life-cycle. These documents could take many
forms, from source code, to installation scripts, to various electronic
and paper reports, and the contracting party (e.g., the government) is
encouraged to specify acceptable formats. Any data item description
is tailored for a specific contract, meaning sections not desired for a
particular effort are identified as not to be provided as part of
identifying the Contract Data Requirements List (CDRL) of what
items are to be produced and delivered by a contractor. Exactly which
DIDs and what parts of the DIDs are required for a particular system
depends on the nature of the project and how parts of it are being
produced by contract(s).</p>
      </sec>
      <sec id="sec-3-11">
        <title>3) Data Idem Description related to System Specification</title>
        <p>The MIL-STD-498 DIDs covers all the phases of a software
system development life-cycle. In regards to system design and
requirements specification, the involved DIDs are listed hereafter:
•</p>
        <p>Operational Concept Description (OCD): describes a proposed
system in terms of the user needs it will fulfill, its relationship to
existing systems or procedures, and the ways it will be used. The
OCD is used to obtain consensus among the acquirer, developer,
support, and user agencies on the operational concept of a
proposed system;</p>
      </sec>
      <sec id="sec-3-12">
        <title>System/Subsystem Specification (SSS): specifies the</title>
        <p>requirements for a system or subsystem and the methods to be
used to ensure that each requirement has been met.
Requirements pertaining to the system or subsystem’s external
interfaces may be presented in the SSS or in one or more
Interface Requirements Specifications (IRSs) referenced from
the SSS;</p>
      </sec>
      <sec id="sec-3-13">
        <title>System/Subsystem Design Description (SSDD): describes the</title>
        <p>sytem- or subsystem-wide design and architectural design of a
system or subsystem. The SSDD may be supplemented by
Interface Design Descriptions (IDDs) and Database Design
Descriptions (DBDDs);</p>
      </sec>
      <sec id="sec-3-14">
        <title>Interface Requirements Specification (IRS): specifies the</title>
        <p>requirements imposed on one or more systems, subsystems,
Hardware Configuration Items (HWCIs), Computer Software
Configuration Items (CSCIs), manual operations, or other
system components to achieve one or more interfaces among
these entities. An IRS can cover any number of interfaces.</p>
      </sec>
      <sec id="sec-3-15">
        <title>D. PM and SE Integrated Environment</title>
        <p>The design and development of a CSS, taking into accounts the
elements introduced before, takes advantage from a working
environment where Project Management (PM) and System
Engineering (SE) activity are strictly integrated.</p>
        <p>All aspects of integration are about individuals and how they
coordinate the application of their collective knowledge, expertise
and capabilities to deliver results. Effective integration efforts are
accomplished through the application of processes, practices and
tools that help to enable important abilities [5]:
enable communication and common understanding on key
objectives,
provide framework for defining specific work activities,
document approaches for coordinating and tracking work effort;
establish expectation of each person’s contribution;
identify critical point where focalized the work effort;
facilitate problem identification and resolution;
apply generally accepted approaches that have demonstrate
effective results under similar circumstances in the past;
support and accelerate the accomplishment of specific work
activities.</p>
        <p>Some processes, practices and tools are designed for individual
use while others may be structured fro group activities. Both uses
have appropriate application within complex program.</p>
        <p>The process, practices and tools can be organized by the timeline
of their impact on integration: episodic or pervasive [5]. Episodic
•
•
•
•
•
•
integration emerges as the need requires. Pervasive integration tends
to be synchronous with the daily work of the program or its
component project.</p>
      </sec>
      <sec id="sec-3-16">
        <title>1) Episodic Integration Mechanism</title>
        <p>Episodic integration mechanisms are applied occasionally to
specific activities or at specific intervals within a program/project:
Program Gate Reviews: require that all program aspects (cost,
schedule, performance, risks, requirements, testing) be presented
in their current state of maturity individual gates in order to:
receive approval to proceed to the next project gate (Go), repeat
the review after addressing specific concerns (recycle) or
terminate the project (No Go);
Joint Planning: There are a variety of tools, templates and
software application that organizations can use to support
scoping and planning activities. Moreover, there are a number of
planning related practices that help to integrate PM and SE.
These include: program kick-off workshops (that brings together
all key stakeholder including engineers, project managers and
factory teams) and model based program planning (artifacts
describing the program/project including product breakdown
structure, work breakdown structure, system engineering process
models);</p>
      </sec>
      <sec id="sec-3-17">
        <title>Dedicated Team Meeting Space: The creation and use of</title>
        <p>dedicated team meeting space and stand-up meeting is a proven
process in a variety of domains;</p>
      </sec>
      <sec id="sec-3-18">
        <title>Pulsed Product Integration and Iterative Development: (PPIID)</title>
        <p>it is sometime described as the ‘daily build’ of product
components into more complex component or into complete
products. Iterative development comprises the use of short
cycles to create and deliver product increments.
2)</p>
      </sec>
      <sec id="sec-3-19">
        <title>Pervasive Integration Mechanism</title>
        <p>There are process, practices and tools integral to program design
and development. They are continuous in nature and thus are
‘pervasive’. The application of pervasive integration mechanism can
help program teams realize such potential benefits for their
organization:</p>
        <p>Standard, Methodologies and Assessment: A methodology is a
documented approach for integrating interacting or
interdependent practices, techniques, procedures, and rules to
determine how best to plan, develop, control and deliver a
defined objective. A standard, on the other hand, reflects broadly
accepted principles of what represents good practices or
common guidelines. As the methodology is implemented,
executive leaders and user must evaluate (assess) the specific
practices and the extent to which the company is adhering to its
methodology;
Integrated Product and Process Development: (IPPD) also
known as ‘simultaneous engineering’ or ‘design build’, uses
multidisciplinary co-located teams in design to jointly derive
requirements and schedules with equal emphasis on product and
process development. The teams often use requirement
breakdown structure (RBS) and work breakdown structure
(WBS) to facilitate their scoping and planning activities. RBS
are used where complex system dictate significant attention be
paid to requirements and when integration is crucial. The WBS
serves as the key framework for organizing the program and the
system engineering effort as well as for estimating and
allocating cost, schedule and performance requirements;
Work Design Process: work design process as configuration
management can help to increase communication and
collaboration across the program. Another work design process
is standardized work that foreseen rigorous design
standardization supports platform reusability. The work
processes are deliberately designed so that integration is a
natural outcome of the work itself;
Requirements Management: it forces conversation between
program/project manager and systems engineers. Effective
requirements management practices helps to align the work so
that customer receive ideal solution and desired program/project
benefits and value is realized for the business. Requirements
management often start at the concept level as a high level view
associated with investment or business opportunities. The
project manager and the chief system engineer build on the hight
level view by eliciting, documenting, and validating high level
requirements from customer and stakeholders. The project may
further cascade elements of the high level requirements for more
detailed development;
Risk Management: Effective risk management ensure that the
sponsoring organization realized its desired benefits. Ideally risk
management processes should be fully integrated into all
program/project activities (management, technical, design,
development, procurement, planning;</p>
      </sec>
      <sec id="sec-3-20">
        <title>Technical Performance Measurements: is an analysis and</title>
        <p>control technique that is used to anticipate the probable
performance of a selected technical parameter, record the actual
performance observed of the selected parameter and assist the
manager in decision making through comparison of planned
versus actual performance;
Governance: is a structured mechanism through which
individuals with oversight responsibility and authority provide
guidance and decision making for important organizational
activities. The governance serves the following key functions
[6]: Oversight, Control, Integration and Decision Making.</p>
      </sec>
    </sec>
    <sec id="sec-4">
      <title>III. THE OPERATIVE ENVIRONMENT SCENARIO</title>
      <p>The previous Section II has introduced the main elements that
characterized the proposed system requirements baseline
management. This section specifies the environment scenario related
to the target program/project.</p>
      <p>According to the Software Design DIDs identified by the
MILSTD-498, a first description of the Complex System is given in the
OCD (see Section II.C.2). Taking into account the Pulsed Product</p>
      <sec id="sec-4-1">
        <title>Integration and Iterative Development (PPIID) and the Integrated</title>
        <p>Product and Process Development (IPPD) integration mechanism
(see Section II.D.2), the first requirements breakdown consist in the
decomposition of the complex system OCD in three different OCD in
regards to complex system: Hardware: user needs related to
hardware elements; Software: user needs related to software
functionalities; and Interfaces: requirements related to the external
interfaces to be managed.</p>
        <p>Note: The Software Engineering activities are reported in the
corresponding DIDs: Software Requirements Specification (SRS),
Software Design Description (SDD), Interface Data Description
(IDD).</p>
        <p>Taking into account only the Software component the further
breakdown of the related OCD (applying PPIID and IPPD) is given
by the definition of the OCDs related to the single software modules
that compose the this component of the complex system.</p>
      </sec>
      <sec id="sec-4-2">
        <title>The Software System Description</title>
        <p>Each software module from the design point of view is fully
defined by (see Section II.2) by the following artifacts (documents
and models): System/Subsystem Specification (SSS),</p>
      </sec>
      <sec id="sec-4-3">
        <title>System/Subsystem Design Description (SSDD) and Interface</title>
      </sec>
      <sec id="sec-4-4">
        <title>Requirements Specification (IRS).</title>
        <p>Specifically the IRS related to each software module is part of the
breakdown of the CID related to the CSS Interfaces. In other terms
the CID relates to the interface of the global system are
“implemented” through the IRS of each module of the software
component of the system itself.</p>
        <p>This requirements organization takes into account the
Requirements Management integration mechanism (see Section
II.D.2).</p>
      </sec>
      <sec id="sec-4-5">
        <title>C. The Design Process</title>
        <p>As stated in the Section II.B.1, the Waterfall model approach was
captured in the MIL-STD-498. The related DIDs have an immediate
correspondence in the adopted system software life-cycle (see Figure
III-3) identified within the model in regards to the Work Design
Process integration mechanism (see Section II.D.2).</p>
        <p>Specifically, the system requirements baseline management is
focused on the System Engineering activities (see Figure III-4)
related to: user requirements Analysis (described in the CID), System
Requirements Analysis (defined in the SSS/IRS) and System Design
(detailed in the SSDD).</p>
        <p>Moreover, also within Software Requirements baseline
management uses MIL-STD-498 documents managed in the
Software Engineering activities (see [4]).</p>
      </sec>
      <sec id="sec-4-6">
        <title>D. System Versions approach</title>
        <p>Starting from the complexity of the system and the related
functionalities and taking into account the suggestions of the
integration mechanism (see section II.D), the approach foreseen more
than one system delivery according to (contractual) milestone each
one corresponding to functional increments of the system according
to the following schema:
•
the Milestone Mk foreseen (at Tk) the delivery of the version Vk
of the system according to the documents: SSSk, SSDDk, IRSk;
•
after the Mk, the activities related to the delivery of the
milestone Mk+1 are started in order to deliver the version Vk+1
at Tk+1. This is related to the corresponding evolution (k k+1)
of the systems design and specification (SSS, SSDD and IRS).</p>
        <p>This versions approach schema taken into account in the RBS and
in the WBS of the project (see Pervasive Integration Mechanism,
Section II.D.2).</p>
        <p>Within the k k+1 evolution, in addition to the activities related
to the design and specification of the functional increments of the
system, are taken into account the following input, including
outcomes from System Verification and Validation activities:
•
•
•
failures coming from the final customer highlighted during the
system verification activities on the Vk version;
not blocking remarks on the Vk version coming from the system
validation team;
evolution of the user needs (e.g new operating rules, blaws,
STANAG,..).</p>
      </sec>
      <sec id="sec-4-7">
        <title>1) Impact on Software System life-cycle</title>
        <p>As reported in the previous Section III.C, the adopted Software
System life-cycle corresponds to a sequential process. At the same
time, the System Versions approach foresees activities iterations each
one corresponding to a specific version.</p>
        <p>This results in sequence of design phases corresponding to the
System Versions where a specific phase takes inputs from the
previous one and gives input to the next one. The activities foreseen
for each phase are the same (according to Waterfall model):</p>
      </sec>
    </sec>
    <sec id="sec-5">
      <title>IV. REQUIREMENTS BASELINE MANAGEMENT</title>
      <p>Starting from the Operative Environment Scenario identified in
Section III and taking into account the PM-SE integration
mechanisms specified in Section II.D, this section reports the
methods and tools related to the proposed requirements management
activities.</p>
      <p>The management of the requirements baseline in regards to
complex software is focused on the concept of the changes
management embedded on the system versions approach (see Section
III.D). Within the Vk Vk+1 evolution of the system, the
corresponding functional increment is specified by the upgrade of the
Requirements Baseline (RB): RBk RBk+1. This requirements
evolution is regulated by a set of change requests managed through
an integrated change control.</p>
      <sec id="sec-5-1">
        <title>A. Integrated Change Control</title>
        <p>Perform Integrated Change Control [7] is the process of:
approving changes and managing changes deliverables, project
technical documents and project plans;
communicating their disposition.</p>
        <p>It reviews all requests for changes or modification to project
documents, deliverables, baselines and project management plan.
Moreover, it approves or rejects the changes. The key benefit of this
process is that it allows the documented changes within the project to
be considered in an integrated fashion while reducing project risk,
which often arises from changes made without consideration to the
overall project objectives and/or plans.</p>
        <p>Figure IV-1: Integrated Change Control – Inputs, Tools and</p>
        <p>Techniques and Outputs [7]</p>
        <p>Changes may be requested by any stakeholder involved in the
project. They should be recorded in written form and entered into the
change management and/or configuration management system.
Change requests are subject to the process specified in the change
control and configuration control system. Those change request
process may require information on estimated time impacts and
estimated cost impacts.</p>
      </sec>
      <sec id="sec-5-2">
        <title>1) Change Control Board</title>
        <p>Every documented change request need to be either approved or
rejected by a responsible individual (project or program manager).
The integrated change control process includes a Change Control
Board (CCB) which is a formally chartered group responsible for
reviewing, evaluating, approving, delaying or rejecting changes and
for recording and communicating such decisions. Approved change
requests can require new or revised cost estimates, activity
sequences, schedule dates, resource requirements and analysis of risk
response alternatives. Customer/sponsor approval may be required
for certain changes after the CCB approval, unless they are part of the
CCB.</p>
      </sec>
      <sec id="sec-5-3">
        <title>2) Configuration Control</title>
        <p>Configuration Control is focused on the specification of both the
deliverable and the process, while change control is focused on
identifying, documenting and approving or rejecting changes to the
project documents, deliverables and baselines.</p>
        <p>Some of the configuration management activities included in the
integrated change control are configuration:
•
identification: identification and selection of a configuration
item to provide the basis for which the product configuration is
defined and verified, products and documents are labeled,
changes requests are managed and accountability is maintained;
•
•
•
•
•
•
•
•
•</p>
        <p>Each Change Request on the Vk version of the system (see
Section III.D) is related to: a function increment requested for the
Vk+1 version, failures coming from the customer on the Vk version,
non-blocking remarks on the Vk version, other needs.</p>
        <p>Each CRD is labeled with an Identifier (CRD_ID) defined
according to the configuration control and report the following
information:
the authors of the CRD;
the figures in the project team responsible for the acceptance of
the CRD;
the module of the system affected (see Section III.A);
the deliverables, documents and artifacts affected by the changes
(if approved);
identification of the items affected by the change in regards to
design documents (see Section II.C.3) and artifacts (e.g.
models);
detail description of the reasons related to the change;
detailed description of the proposed changes (requirements,
models, drawings).
status accounting: information is recorded and reported as to
when appropriate data about the configuration item should be
provided;
verification and audit: ensure the composition of a project’s
configuration item is correct and that corresponding changes are
registered assessed, approved, tracked and correctly
implemented.</p>
      </sec>
      <sec id="sec-5-4">
        <title>Approving the CRD</title>
        <p>Each Change Request on the Vk version of the module Mx,
described by the corresponding CRD, in order to be approved for
application to the Vk+1 version, must to be reviewed by the involved
individuals (specified in the CRD itself) within a CCB:</p>
      </sec>
      <sec id="sec-5-5">
        <title>Change Request Description</title>
        <p>According to previous Section III.D and Section IV.A, the change
requests are documented through an artifacts named Change Request
Description (CRD).</p>
        <p>An important input to the CCB, in addition to the CRD to be
reviewed, is the time and cost impact evaluation for each change
request in regards to the implementation of the changes on the
version Vk+1 of the affected system module. These evaluations must
to take into account system engineering and system verification and
validation activities (see Section III.C).</p>
        <p>The main outcomes of the CCB are the approved Change
Requests that became Change Request Order (CRO) applicable to the
Vk+1 version.
Each CRO must to be applied to the system description
documents (see Section II.C.3) in order to define the new software
baseline, as defined in the CCBs, to be applied by the software
engineering activities.</p>
      </sec>
      <sec id="sec-5-6">
        <title>D. System Failure Description</title>
        <p>The Change Request mechanism is applied also to the
management of the System Failure (SF) highlighted during the
system verification and validation phase of the specific version (Vk)
on one module (Mx).</p>
        <p>Similar to the change request, the system failures are documented
through a System Failure Description (SFD). Each SFD is labeled
with an Identifier (SFD_ID) defined according to the configuration
control and reports at list: the authors, the module of the affected
system (see Section III.A), identification of the functionalities
affected by the failure, detailed description of the failure including
the operative condition and references to supporting artifacts.</p>
        <p>Figure IV-5: System Failure vs Change Request
an anomaly of the system specifications or design that affect the
SSS/SSDD or IRS (see Section II.C.3).
an anomaly
implementation.</p>
        <p>of the
software
specifications/design
or</p>
        <p>In the first case, starting from the SFD is produced a change
request (documented by a CRD that specifies the recommended
corrective action [7]) to be reviewed/approved in a CCB. The
corresponding CRO specifies the implemented corrective action.</p>
        <p>In the second case, a Software Problem Report (SPR) is defined
in order to trace the recommended defect repair that will be
implemented in the Vk+1 version of the affect module of the system.</p>
        <p>V.</p>
      </sec>
    </sec>
    <sec id="sec-6">
      <title>CONCLUSION</title>
      <p>The paper presents experiences from defining and managing the
requirements baseline related to Complex Software System (CSS).</p>
      <p>The definition of a CSS is strictly related to the identification of
the properties of a Complex System and to the features of a Software
System. A complex system is composed of many components which
may interact with each other. A software system is based on inter
communicating components based on software forming part of
a computer system (a combination of hardware and software).</p>
      <p>Starting from the identification of the features of a CSS, it is
identified the adopted system design process, the Waterfall Model,
and the artifacts and documents used to describes the software
development life-cycle. In this regards, it is introduced the
MILSTD-498 Data Item Descriptions (DIDs) that covers all the identified
phases giving a focus on the DIDs involved in the system design and
requirements specification.</p>
      <p>The design and development of a CSS takes advantage from the
working environment where Project Management (PM) and System
Engineering (SE) activity are strictly integrated. All aspects of
integration are about individuals and how they coordinate the
application of their collective knowledge, expertise and capabilities
to deliver results. Effective integration efforts are accomplished
through the application of processes, practices and tools These can be
organized by the timeline of their impact on integration: episodic or
pervasive. Episodic integration emerges as the need requires.
Pervasive integration tends to be synchronous with the daily work of
the program or its component project.</p>
      <p>Starting from a first description of the CSS (given in the</p>
      <sec id="sec-6-1">
        <title>Operational Concept Description OCD) is introduced the proposed</title>
        <p>environment scenario related to the target, taking into account the</p>
      </sec>
      <sec id="sec-6-2">
        <title>Pulsed Product Integration and Iterative Development (PPIID) and</title>
        <p>the Integrated Product and Process Development (IPPD) integration
mechanism. The output of this process is the identification of the
software modules that compose the software component of the CSS.</p>
        <p>The proposed System Version approach (based on the
suggestions of the integration mechanism) foreseen more than one
system delivery according to (contractual) milestones each one
corresponding to functional increments of the system. This results in
sequence of design phases corresponding to the System Versions
where a specific phase takes inputs from the previous one and gives
input to the next one.</p>
        <p>The management of the requirements baseline in regards to CSS
is focused on the concept of the changes management embedded on
the system versions approach. Within each System Version evolution,
the corresponding functional increment is specified by the
corresponding upgrade of the Requirements Baseline. This
requirements evolution is regulated by a set of change requests
managed through an integrated change control.
2.</p>
      </sec>
    </sec>
    <sec id="sec-7">
      <title>VI. REFERENCES</title>
    </sec>
  </body>
  <back>
    <ref-list>
      <ref id="ref1">
        <mixed-citation>
          <article-title>Each system failure may be related to: 1.</article-title>
        </mixed-citation>
      </ref>
      <ref id="ref2">
        <mixed-citation>
          <string-name>
            <given-names>James</given-names>
            <surname>Ladyman</surname>
          </string-name>
          , James
          <string-name>
            <surname>Lambert</surname>
          </string-name>
          (Department of Philosophy, University of Bristol, U.K),
          <article-title>Karoline Wiesner (Department of Mathematics and Centre for Complexity Sciences</article-title>
          , University of Bristol, U.K.)
          <article-title>- “What is a Complex System” (</article-title>
          <year>2012</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref3">
        <mixed-citation>
          <string-name>
            <surname>Sommerville</surname>
          </string-name>
          ,
          <string-name>
            <surname>Ian -</surname>
          </string-name>
          "
          <source>What is software?". Software Engineering</source>
          , 8th ed. (
          <year>2007</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref4">
        <mixed-citation>
          <string-name>
            <surname>Winston Royce -</surname>
          </string-name>
          "
          <source>Managing the Development of Large Software Systems", Proceedings of IEEE WESCON</source>
          (
          <year>1970</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref5">
        <mixed-citation>
          <string-name>
            <given-names>Joint</given-names>
            <surname>Logistics</surname>
          </string-name>
          Commanders and Joint Policy Coordinating Group on Computer Resources Management - “
          <article-title>Military Standard 498 (MIL-STD-498) Overview</article-title>
          and Tailoring Guidebook”
          <article-title>(</article-title>
          <year>1994</year>
          )
          <article-title>; Eric Rebentish</article-title>
          ,
          <string-name>
            <surname>PMI</surname>
          </string-name>
          , INCOSE - “
          <article-title>Integrating Program Management and System Engineering. Methods, Tools and Organizational Systems for Improving Performance”</article-title>
          , Wiley (
          <year>2017</year>
          )
          <article-title>; PMI - “Governance of Portfolio, Program and Projects: A Practice Guide” (</article-title>
          <year>2016</year>
          )
          <article-title>; PMI - “A guide to the Project Management Body of Knowledge” Fifth Edition (</article-title>
          <year>2013</year>
          );
        </mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>