        <article-title>Process Ecosystem Perspective in Socio-Technical Change Handling</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>Dimitr</string-name>
          <email>katrina.dimitre@edu.rtu.lv</email>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Kirikov</string-name>
          <email>marite.kirikova@rtu.lv</email>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <aff id="aff0">
          <label>0</label>
          <institution>Riga Technical University</institution>
          ,
          <addr-line>1 Kalku, Riga, LV-1658</addr-line>
          ,
          <country country="LV">Latvia</country>
        </aff>
      </contrib-group>
      <fpage>111</fpage>
      <lpage>118</lpage>
      <abstract>
        <p>The paper considers socio -technical change, which is imposed by the external environment. Obviously a process ecosystem emerges around the technology change. Although there are many change management and technology adoption models available, they do not provide methods and models for explicit process ecosystem consideration in socio-technical change. Therefore, in this paper, an approach for process ecosystem aware change handling is proposed based on (1) the related work in process ecosystems and technology change management and (2) the information obtained in the practical setting of a motivating example from the healthcare industry. This approach prescribes the modeling of a basic change timeline process, relatively permanent As-Is and To-Be process ecosystems, and temporary processes as a related technology change process ecosystem, which can be represented and used to support socio-technical change handling.</p>
      </abstract>
      <kwd-group>
        <kwd>Process Ecosystem</kwd>
        <kwd>Socio-Technical Change</kwd>
        <kwd>Business Process</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>-</title>
      <p>
        Rapid innovation, globalization, digital transformation, and business competition are
just some of the causes of socio-technical change that is faced in almost all areas of
human activity. While the technology change is obvious, there is still a lack of generic
models for handling this change from the perspective of business processes. Scientific
reports on technology change management in different areas (e.g. innovation in
emerging countries [
        <xref ref-type="bibr" rid="ref1">1</xref>
        ], technology change in media organizations [
        <xref ref-type="bibr" rid="ref2">2</xref>
        ], technology
change in higher educational institutions [
        <xref ref-type="bibr" rid="ref3">3</xref>
        ]) emphasize the need to take into account
a number of factors, such as values and knowledge of people, cooperation between
departments and institutions, and institutional change management. They suggest also
taking into account technology adoption models [
        <xref ref-type="bibr" rid="ref3">3</xref>
        ] and other systemic issues.
      </p>
      <p>In this position paper an approach for the technology change is viewed from a
business process ecosystem perspective. The assumption is that it is possible to
identify an ecosystem of business processes relevant to a particular socio-technical
change. Once the process ecosystem is identified, (1) a time line for a guiding (base)
change process can be established, (2) the models for To-Be processes in the
ecosystem can be created and (3) the change procedure for each process can be
established.</p>
      <p>The paper is organized as follows. Section 2 presents a motivating example from
the healthcare domain. Section 3 generalizes the issues presented in the example and
discusses the related work in process ecosystem change and technology change areas.
Section 4 briefly introduces a proposed approach for process ecosystem aware
sociotechnical change handling and illustrates the initial steps of its application. Section 5
presents the conclusions and points to the directions of further research regarding
process ecosystem aware socio-technical change handling.
2</p>
    </sec>
    <sec id="sec-2">
      <title>Motivating Example</title>
      <p>
        The motivating example concerns introduction of ISO 80369 standard in Latvian
hospitals. For about 100 years, luer type connectors have been used due to their
universal design, low cost, and simplicity. However, the all-purpose design of the
luers increases the chance of healthcare staff unknowingly mating tubes from
different applications [
        <xref ref-type="bibr" rid="ref4">4</xref>
        ] which has led to some tragic accidents [
        <xref ref-type="bibr" rid="ref5">5</xref>
        ]. To avoid such
misconnection possibilities; in 2016 the International Organization for
Standardization introduced ISO 80369. The new standard states that there are 6 main
groups of connectors [
        <xref ref-type="bibr" rid="ref6">6</xref>
        ]. To handle this change the hospitals have to replace the
current connectors according to the new standard, which is not a trivial task.
      </p>
      <p>
        To execute this change the new connectors are launched into the market one by
one. It all started with Enteral feeding (ISO 80369-3) connectors. This part was quite
small and at the end of 2017 this change was successfully implemented. Next in line
is the ISO 80369-6 Neuroaxial application. This is a much wider field. “Neuroaxial
approach” means including every injection, catheter and syringe used in spinal
anesthesiology, epidural anesthesiology, lumbar puncture and nerve blocks. Taking
into account that every person undergoing a surgical procedure is exposed to
anesthesiology, the number of patients for these procedures is much larger. Also, pain
therapy, spinal fluid diagnostics and some oncology cases are exposed to this change.
Thus, for the change to be done, many aspects have to be taken into account – the
expense, new products, new tenders and specifications, connectivity with a hospital’s
technological park, etc. Experiences in other countries have revealed the following
risks for the complex process of changeover: (1) delay of care/ interruption; (2) new
chances for misconnections; and (3) use and availability of adapters [
        <xref ref-type="bibr" rid="ref6">6</xref>
        ]. There is a
guideline [
        <xref ref-type="bibr" rid="ref7">7</xref>
        ] for implementing the ISO 80369 series small bore connectors, and some
German hospitals have made the change already. Based on their experience – the time
to educate staff, get the new products and make the change – takes approximately 6
months. However, the As-Is situation in Latvia differs from that in Germany –
German colleagues had all the data about quantities used for specific purposes and
they went into the change well informed about products and manufacturers; and they
also had the basic information about which department uses what kind of approach.
The experience of other countries shows that an ecosystem of processes is affected
[
        <xref ref-type="bibr" rid="ref7">7</xref>
        ]. In the Latvian case it is a complex socio-technical change because, for a
3
proportion of items used every day, and, also in the current situation, there is no valid
data about which items are necessary and how to approach this problem. For a
hospital to implement these changes, many departments have to work together and
approach the problem in an effective manner, because the malfunction of some
process could mean that a patient would be lacking one of the components needed for
him to receive the treatment.
3
      </p>
    </sec>
    <sec id="sec-3">
      <title>Related Work</title>
      <p>
        While there are many change models proposed, e.g. [
        <xref ref-type="bibr" rid="ref8 ref9">8, 9</xref>
        ], here we will consider the
related work on only two issues: (1) changes in process ecosystems and (2)
technology change.
      </p>
      <p>
        The notion “process ecosystem” has been defined and used in various sources. In
[
        <xref ref-type="bibr" rid="ref10">10</xref>
        ] the term “ecosystem” addresses the context of the business process: “the business
process ecosystem consists of all the components that are required to develop, execute
measure, manage, and optimize a business process”. Similarly, in [
        <xref ref-type="bibr" rid="ref11">11</xref>
        ] the term
“process ecosystem” describes the management of an enterprise as an integrated
network, in which all processes and related attributes are interconnected and are
driving toward business success. In order to implement the process ecosystem, the
following activities are suggested: catalog processes, standardize artifacts, map
processes, complement processes, and deploy tools. The context of the processes is
added in the “complement process” activity. In general, the term “process ecosystem”
is rarely used in business process literature, although the need to analyze relationships
between different processes is well recognized [
        <xref ref-type="bibr" rid="ref9">9</xref>
        ]. The term “enterprise ecosystem”
is more common (see, e.g. [
        <xref ref-type="bibr" rid="ref12">12</xref>
        ]). In this paper, we view a “process ecosystem” as all
related processes that are affected or created by the technology change. The context of
the processes belongs to the ecosystem, but, actually, it is just its background, not a
base element of the ecosystem. Those authors who refer to a process ecosystem claim
that awareness of it helps in process change management. However, there are no
particular process ecosystem change models available that could be applied in cases
of technology change.
      </p>
      <p>
        Socio-technical change requires a move from As-Is process ecosystem to To-Be
process ecosystem. In a broader scope, there are research works that suggest
approaches for gradual change of related processes [
        <xref ref-type="bibr" rid="ref13">13</xref>
        ]. However, when focusing on
the scope of the problems addressed in this paper, these approaches do not make it
possible to clearly see the processes to be addressed and their relationships. An
exception is the dependency graphs described in [
        <xref ref-type="bibr" rid="ref14">14</xref>
        ].
      </p>
      <p>
        With respect to the technology change, we considered several surveys and case
studies which enabled us to identify the factors that have to be taken into account in
technology change management. A detailed survey of information technology change
barriers and coping mechanisms is reported in [
        <xref ref-type="bibr" rid="ref15">15</xref>
        ] and [
        <xref ref-type="bibr" rid="ref16">16</xref>
        ]. These sources suggest
the following main coping mechanisms: (1) consultant support – to learn about and to
plan the new technology; (2) education and training; (3) vendor support; (4)
procedures; and (5) endurance. The authors of [
        <xref ref-type="bibr" rid="ref15">15</xref>
        ] and [
        <xref ref-type="bibr" rid="ref16">16</xref>
        ] also emphasize that the
mechanisms are mutually related and impact one another. In [
        <xref ref-type="bibr" rid="ref17">17</xref>
        ] an integrated
conceptual model for managing change in technology and engineering is proposed.
The model is based on five chaos anchors: (1) time; (2) business space (characterized
by information, knowledge, and people); (3) a system framework (referring to broad
strategic, operational and integrative challenges); (4) a process (imagine, shape,
deliver, support; – meant for continuous change management); and (5) an integrator
(integrating all concepts and sub-models).
      </p>
      <p>
        The issues discussed in the surveys also appear in the case studies. For instance, in
[
        <xref ref-type="bibr" rid="ref18">18</xref>
        ] the time is considered as a relevant factor in regulatory imposed change
management. And also in [
        <xref ref-type="bibr" rid="ref18">18</xref>
        ] the necessity to holistically consider cognitive,
technological and institutional issues is pointed to. In [
        <xref ref-type="bibr" rid="ref3">3</xref>
        ], organizational and
technological misunderstandings and the lack of broad-based support across
departments are mentioned as main barriers in technology change. In [
        <xref ref-type="bibr" rid="ref19">19</xref>
        ], the
necessity of understanding the system under study is emphasized. The authors of [
        <xref ref-type="bibr" rid="ref19">19</xref>
        ]
suggest defining the system under study to set the boundaries for investigation, study
the context in which the system is inserted, elaborate the related artifacts, and discuss
future management actions and decision making.
4
      </p>
    </sec>
    <sec id="sec-4">
      <title>The Proposed Approach</title>
      <p>Taking into account problems explained in the motivating example in Section 2 and
the findings of related work discussed in Section 3, we propose a process ecosystem
aware approach for handling socio-technical changes. The approach is focused on a
particular type of change, where it is imposed from outside and has a temporal
character. The approach distinguishes between the enterprise process ecosystem
before the change (As-Is process ecosystem) and a process ecosystem after the
changes (To-Be process ecosystem). Both of these process ecosystems consist of:
related organizational processes affected by changes; the context of each process that
is involved, in terms of all enterprise objects related to the process; and the extended
process context that includes elements outside the enterprise (such as vendors). The
process ecosystem (that the socio-technical change has to be aware of) consists of
abovementioned As-Is and To-Be process ecosystems and two more process groups,
namely: basic change timeline process and temporal processes that are needed just to
accomplish the change (see Fig. 1).</p>
      <p>The process ecosystems aware technology change handling approach consists of
the following activities:
1. Identify the basic timeline process (in the motivating example this process is the
process of gradual equipment change).
2. Based on the defined basic timeline process, identify the As-Is ecosystem of
affected processes.
3. Based on the processes identified in points 1 and 2, define (at least at a high level
of abstraction) the To-Be process ecosystem.
4. Based on above obtained processes define temporary processes for getting from
the As-Is to To-Be process ecosystem.
5
5. Refine and represent all process models and their relationships at the practically
needed level of detail.
6. Proceed to planning and implementation of processes respecting the basic timeline
process.
7. Regularly check whether the changes in the models are needed when their
practical implementation is progressing.</p>
      <p>In the healthcare case discussed in Section 2, the gradual equipment change is a
base timeline process that actually introduces 4 phases in the change process. The first
phase concerns the approval of change that would be announced in the annual
Anesthesiology congress, and this phase could take from 12-16 months from the start
of this research. The second phase concerns “Announcement in EU” regarding the
change and would take up to 4-6 months. During this period the educational questions
should be addressed and some issues should be resolved concerning the devices and
technical procedure descriptions that have to be changed due to the new standard. All
of the documentation has to be prepared to implement the new standard in the
regulatory system. The hospitals have to address problems concerning item values
that have to be changed and also new equipment requirements. In the third phase, ISO
80369-6 should be accepted by the Health Ministry of the Republic of Latvia. In
advance of this a strategy for education has to be developed, so that it could be
implemented within this third phase. The main tasks for this phase are to educate the
medical staff and register new methods in state regulatory institutions, and ensure
there is information technology support for new processes. The final phase would be a
changeover period. Here the practical changes of creating an additional stock of new
items, adapting the anesthesiologist workbench, and starting to order the goods for the
changeover date, should be determined. In this scenario all of the preparation work for
change would be done in the previous phases, so the changeover itself in hospitals
should take no more than 3-5 months.</p>
      <p>To identify the As-Is and To-Be process ecosystems with respect to the base
timeline process, it was decided to consider, first, the business ecosystem of
healthcare in Latvia. It is represented as a Latvian healthcare ecosystem participant
interaction map in Fig. 2. There are many information channels; for instance,
financing is not done directly from patient to Hospital, but mostly through the
Ministry of Health. This is so that the finance flows can be evaluated in the ministry
and outside of the hospital itself. In the Healthcare business a lot of new technology
information and medical staff training is coming from medical device distributors or
manufacturers, because, in most cases, particular equipment requires knowledge of a
corresponding procedure to handle it.</p>
      <p>The As-Is process ecosystem of technology change concerns the current processes
in the hospital that involve activities/processes of the departments using luers,
administration, and the hospital pharmacy; as well as external processes for luer
acquisition. There were no other processes identified to be directly affected by the
change.</p>
      <p>To-Be process ecosystem identification involved the development of new
processes in the hospital that would be applied after the end of the change process.
Also, the new processes regarding the purchasing of devices were identified. The
models of these processes can serve as the sources of information systems
requirements for new information technology solutions needed to support them.</p>
      <p>The definition of temporary change processes showed that it is necessary to define
a process change ecosystem separately for each phase of a base timeline process. The
process ecosystem for the second phase of the base timeline process is shown in Fig.
3. For the sake of simplicity the links between the processes are not shown.</p>
      <p>For each phase of the base change process the detailed processes for the hospital
were developed. For instance, for the second phase there were 8 related
activities/processes identified that have to be performed in the hospital; and in the
7
third phase – 18 activities/processes were identified. The process models also allowed
identifying main information flows and documents involved in the change process.
The approach for process ecosystem aware socio-technical change handling is
proposed in the paper. The approach is developed on the basis of related work in
process ecosystems and technology change management and by taking into account
the practical setting of the motivating example from the healthcare industry.</p>
      <p>This approach is in the initial stage of its usage; therefore, its applicability is only
partly tested. However, it is already possible to derive the following conclusions:
1. It is important to have a base timeline process to monitor the process development
and execution according to the time constraints of the socio-technical change.
2. It is important to distinguish between relatively permanent processes and
processes that exist only at the time of embracing the socio-technical change
prescribed by the timeline process.
3. It is essential to document relationships between entities participating in the
change ecosystem.
4. If the base timeline process has several phases, temporary change process
ecosystems should be defined for each change phase.</p>
      <p>The future work includes (1) the refinement of the concept of ecosystems when
referring to different types of systems of systems of processes; (2) further testing of
the proposed approach; (3) testing the applicability of process dependency graphs in
process ecosystem identification; (4) investigating how capability oriented approaches
can contribute to the handling of technology change; (5) investigating how
information logistics, with its timeline concept, can contribute the technology change
handling; (6) refining the proposed approach and investigating other contexts of its
application; and (7) developing software tools for process ecosystem modeling and
process ecosystem aware socio-technical change handling.</p>
    </sec>
  </body>
  <back>
    <ref-list>
      <ref id="ref1">
        <mixed-citation>
          1.
          <string-name>
            <surname>Benini</surname>
            ,
            <given-names>R.:</given-names>
          </string-name>
          <article-title>Some key policy issues related to technology change, knowledge and absorption in a country comparison perspective</article-title>
          . (
          <year>2016</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref2">
        <mixed-citation>
          2.
          <string-name>
            <surname>McCoseckey</surname>
            ,
            <given-names>M. D.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Pierson</surname>
            ,
            <given-names>R.:</given-names>
          </string-name>
          <article-title>A formal approach to change management (CM) for dynamic technology driven media organizations</article-title>
          .
          <source>In SMPTE 2017 Annual Technical Conference and Exibition</source>
          , IEEE, pp.
          <fpage>1</fpage>
          -
          <lpage>11</lpage>
          (
          <year>2017</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref3">
        <mixed-citation>
          3.
          <string-name>
            <surname>Smuts</surname>
            ,
            <given-names>R. G.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Lalitha</surname>
            ,
            <given-names>M. V. V.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Khan</surname>
          </string-name>
          , H. U.:
          <article-title>Change management guidelines that address barriers to technology adoption in an HEI context</article-title>
          .
          <source>In IEEE 7th International Advance Computing Conference</source>
          , pp.
          <fpage>754</fpage>
          -
          <lpage>758</lpage>
          (
          <year>2017</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref4">
        <mixed-citation>
          4.
          <string-name>
            <surname>Skog</surname>
          </string-name>
          , J.: ISO 80369 is Coming - Will You Be Ready? Tubing (
          <year>2016</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref5">
        <mixed-citation>
          5.
          <string-name>
            <surname>Stett</surname>
          </string-name>
          , G.:
          <article-title>Clinical Analyst “JCAHO Issues Alert on Dangerous Tubing Misconnections.” MD Buyline, Inc</article-title>
          . (
          <year>2006</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref6">
        <mixed-citation>
          6. GEDSA:
          <article-title>Reducing the risk of medical device tubing misconnections</article-title>
          .
          <source>Stay Connected</source>
          (
          <year>2017</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref7">
        <mixed-citation>
          7.
          <article-title>Guideline for the implementation of medical products using small bore connectors specified in the ISO 80369 series (</article-title>
          <year>2017</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref8">
        <mixed-citation>
          8.
          <article-title>Systems model of change management and continuous change process model</article-title>
          , available at https://www.managementstudyguide.
          <article-title>com/systems-model-of-change-management</article-title>
          .htm,
          <source>last accessed March 6</source>
          ,
          <year>2017</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref9">
        <mixed-citation>
          9.
          <string-name>
            <surname>Koch</surname>
            ,
            <given-names>J.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Michels</surname>
            ,
            <given-names>N.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Reinhart</surname>
          </string-name>
          , G.:
          <article-title>Context model design for a process-oriented manufacturing change management</article-title>
          ,
          <source>Procedia, CIRP 41</source>
          , pp.
          <fpage>33</fpage>
          -
          <lpage>38</lpage>
          (
          <year>2016</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref10">
        <mixed-citation>
          10.
          <string-name>
            <surname>Harris</surname>
            ,
            <given-names>A.C.</given-names>
          </string-name>
          :
          <article-title>The Business Process Ecosystem</article-title>
          . Meghan-Kiffer Press (
          <year>2013</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref11">
        <mixed-citation>
          11.
          <string-name>
            <surname>Boutros</surname>
          </string-name>
          , St.,
          <string-name>
            <surname>Purdie</surname>
            <given-names>T.</given-names>
          </string-name>
          :
          <article-title>The Process Improvement Handbook: A Blueprint for Managing Change and Increasing Organizational Performance. Mc Graw Hill Education (</article-title>
          <year>2014</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref12">
        <mixed-citation>
          12.
          <string-name>
            <surname>Guenther</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Middeke</surname>
            ,
            <given-names>D.</given-names>
          </string-name>
          :
          <article-title>Designing future enterprises</article-title>
          . In: Bengholzi,
          <string-name>
            <given-names>P.</given-names>
            ,
            <surname>Krob</surname>
          </string-name>
          ,
          <string-name>
            <given-names>D.</given-names>
            ,
            <surname>Lonjon</surname>
          </string-name>
          ,
          <string-name>
            <given-names>A.</given-names>
            ,
            <surname>Panetto</surname>
          </string-name>
          , H. (eds.)
          <source>Digital Enterprise Design and Management</source>
          ,
          <source>Advances in Intelligent Systems and Computing</source>
          , vol.
          <volume>261</volume>
          , pp.
          <fpage>3</fpage>
          -
          <lpage>14</lpage>
          , Springer (
          <year>2014</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref13">
        <mixed-citation>
          13.
          <string-name>
            <surname>Comuzzi</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          :
          <article-title>Aligning monitoring and compliance requirements in evolving business networks</article-title>
          .
          <source>In: Meersman R</source>
          . et al. (eds) On the Move to Meaningful
          <source>Internet Systems: OMT 2014. Lecture Notes in Computer Science</source>
          , vol.
          <volume>8841</volume>
          , Springer, Berlin Heidelberg, pp.
          <fpage>166</fpage>
          -
          <lpage>183</lpage>
          (
          <year>2014</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref14">
        <mixed-citation>
          14.
          <string-name>
            <surname>Hajmoosaei</surname>
            ,
            <given-names>M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Tran</surname>
            ,
            <given-names>H.N.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Percebois</surname>
          </string-name>
          , Ch.,
          <string-name>
            <surname>Front</surname>
            ,
            <given-names>A.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Roncanio</surname>
          </string-name>
          , Cl.:
          <article-title>Towards a changaware process environment to system and software processes</article-title>
          .
          <source>In: ISIP'15</source>
          ,
          <string-name>
            <surname>Tallin</surname>
          </string-name>
          , Estonia, ACM, pp.
          <fpage>32</fpage>
          -
          <lpage>41</lpage>
          (
          <year>2015</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref15">
        <mixed-citation>
          15.
          <string-name>
            <surname>Benamati</surname>
            ,
            <given-names>J.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Lederer</surname>
            ,
            <given-names>A. L.</given-names>
          </string-name>
          :
          <article-title>Coping with rapid change in information technology</article-title>
          .
          <source>In: CPR 98 Boston</source>
          , MA, USA, pp.
          <fpage>37</fpage>
          -
          <lpage>44</lpage>
          (
          <year>1998</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref16">
        <mixed-citation>
          16.
          <string-name>
            <surname>Benamati</surname>
            ,
            <given-names>J.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Lederer</surname>
            ,
            <given-names>A. L.:</given-names>
          </string-name>
          <article-title>An empirical study of IT management and rapid IT change</article-title>
          . In: SIGCPR'
          <fpage>99</fpage>
          ,
          <string-name>
            <surname>New</surname>
            <given-names>Orleans</given-names>
          </string-name>
          , LA, USA, pp.
          <fpage>144</fpage>
          -
          <lpage>153</lpage>
          (
          <year>1999</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref17">
        <mixed-citation>
          17.
          <string-name>
            <surname>Winzker</surname>
            ,
            <given-names>D. H.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Pretorius</surname>
            ,
            <given-names>L.</given-names>
          </string-name>
          :
          <article-title>Technology and engineering management in a fast changing world - or “Creating substance out of chaos”</article-title>
          .
          <source>In PICMET 2009 Proceedings, August 2-6</source>
          , Portland, Oregon, USA, pp.
          <fpage>1</fpage>
          -
          <lpage>5</lpage>
          , (
          <year>2009</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref18">
        <mixed-citation>
          18.
          <string-name>
            <surname>Nair</surname>
            ,
            <given-names>A.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Dreyfus</surname>
            ,
            <given-names>D.</given-names>
          </string-name>
          :
          <article-title>Technology alignment in the presence of regulatory changes: The case of meaningful use of information technology in healthcare</article-title>
          .
          <source>International Journal of Medical Informatics</source>
          ,
          <volume>110</volume>
          , pp.
          <fpage>42</fpage>
          -
          <lpage>51</lpage>
          (
          <year>2018</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref19">
        <mixed-citation>
          19.
          <string-name>
            <surname>Almeida</surname>
            ,
            <given-names>C.M.V.B.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Sevegnani</surname>
            ,
            <given-names>F.</given-names>
          </string-name>
          <string-name>
            <surname>Agostinho</surname>
            ,
            <given-names>F.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Liu</surname>
            ,
            <given-names>G.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Yang</surname>
            ,
            <given-names>Z.H.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Coscieme</surname>
            ,
            <given-names>L.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Giannetti</surname>
            ,
            <given-names>B.F.</given-names>
          </string-name>
          :
          <article-title>Accounting for the benefits of technology change: Replacing a Zinc-coating process by water-based organo-metalic coating process</article-title>
          .
          <source>Journal of cleaned production 174</source>
          , pp.
          <fpage>170</fpage>
          -
          <lpage>176</lpage>
          (
          <year>2018</year>
          ).
        </mixed-citation>
      </ref>
    </ref-list>