=Paper= {{Paper |id=Vol-2207/IWSM_Mensura_2018_paper_9 |storemode=property |title=Challenges of Using Software Size in Agile Software Development: A Systematic Literature Review |pdfUrl=https://ceur-ws.org/Vol-2207/IWSM_Mensura_2018_paper_9.pdf |volume=Vol-2207 |authors=Tuna Hacaloglu,Onur Demirors |dblpUrl=https://dblp.org/rec/conf/iwsm/HacalogluD18 }} ==Challenges of Using Software Size in Agile Software Development: A Systematic Literature Review== https://ceur-ws.org/Vol-2207/IWSM_Mensura_2018_paper_9.pdf
    Challenges of Using Software Size in Agile Software
      Development: A Systematic Literature Review

                        Tuna Hacaloglu1-2 and Onur Demirors3-4
                         1
                          Atilim University, Ankara, 06830, Turkey
                 2
                  Middle East Technical University, Ankara, 06800, Turkey
                          tuna.hacaloglu@atilim.edu.tr
                   3
                     Izmir Institute of Technology, Izmir, 35430, Turkey
              4
                University of New South Wales, Sydney, NSW 2052, Australia
                             onurdemirors@iyte.edu.tr



       Abstract. Software size is a fundamental measure for software management.
       Size is used for a variety of purposes, such as benchmarking, normalization, and
       portfolio measurement, and it is frequently considered as the sole input of esti-
       mation. Estimations can be produced for various reasons; e.g., to predict effort,
       cost and duration of software development projects. There are different types of
       software size measures. Particularly in projects where agile methodologies are
       adopted, measurement becomes a significant challenge as it is perceived as a
       non-value-added task and records of tasks such as requirements identification
       are not always consistent. The difficulties of applying traditional size measure-
       ment techniques in agile contexts, however, do not diminish the need, and new
       methods and techniques are introduced to improve the manageability of the ag-
       ile projects. In this paper, we discuss estimation and measurement approaches
       in relation with ―software size‖ in agile contexts. Based on this review, we pre-
       sent the perceptions of software size and related challenges, such as misinter-
       pretation of size, difficulties in implementation, and acceptability of the meas-
       urement processes. We anticipate that providing a baseline for the state of soft-
       ware size measures in agile contexts and presenting related challenges, particu-
       larly in terms of its acceptability by practitioners can shed light on the devel-
       opment of new techniques.

       Keywords: Agile software development, size, measurement, estimation, func-
       tion points, story points, use case points, line of code.


1      Introduction

Measurement is important in software engineering in order to accomplish three aims:
understanding, controlling and improving the current situation [1]. Especially through
size measurement managers are able to manage, maintain and improve projects, and
make comparisons across projects [2]. In [3] the importance of software size is ex-
plained as when there is no solid baseline of size, neither the estimation and planning;
nor control of a large-scale software project can be undertaken objectively. Software




                                                                                           109
T. Hacaloglu, O. Demirors




               size is frequently represented in terms of length, functionality, and complexity attrib-
               utes [1]. Function point analysis and lines of code (LOC) are the most recognized
               sizing methods [4].
                  In practice, despite being a basic concept, size is not uniquely perceived by re-
               searchers and practitioners. Size measurement is often confused with estimation. In
               [5], Ozkan and Demirors clearly differentiated measurement from estimation by stat-
               ing that whenever the necessary details of the user requirements exist, a measurement
               of the functional size is possible. However, when there is a lack of details, one can
               only estimate the size. In other words, estimation is a substitute in situations where
               measurement is not possible.
                  In projects utilizing agile methodologies, there is uncertainty in initial require-
               ments, and documentation of requirements is minimal and generally in the form of
               user stories which can be considered as ―light weight requirements‖ [S1], p.54). For
               this reason, the availability of such resources and their maturity in terms of the level
               of details required for functional size measurement (FSM) can prevent the adoption of
               functional size measurement methods and complicate early estimations. Practitioners,
               instead, adopt expert-based estimation techniques which are criticized for their sub-
               jective nature. Moreover, different interpretations of subjective size measures can lead
               to a confusion of the size and effort concepts. Previously, this situation was observed
               by Ozkan and Demirors in [5], who reported that practitioners in the field frequently
               referred to functional size as an effort measure.
                  In the literature, there are systematic literature reviews (SLRs) exploring cost esti-
               mation using soft computing techniques [6], effort estimations [7], [8], [9] and a sur-
               vey on cost/size estimation [10] in agile software development. However, none of
               these studies specifically focus on size measurement or estimation in agile software
               development and discuss how size is perceived and utilized in this process or address
               the related challenges.
                  In this study, by recognizing the importance of size in software engineering, we
               aimed to determine how size concept is perceived in the agile context by means of an
               SLR study and by focusing more specifically on the perspectives of size and related
               challenges. We anticipate that the findings of this paper can contribute to develop an
               understanding of the problems related to size measurement and estimation in the agile
               software development literature and can be useful while developing new measure-
               ment techniques.
                  The rest of the paper is structured as follows: section 2 describes the research
               methodology, section 3 discusses how size is interpreted in agile software develop-
               ment along with the challenges described in the literature, and finally section 4 pro-
               vides the conclusion and recommendations for future work.


               2       Research Methodology

               SLRs on size estimation/measurement in the agile software development literature
               were conducted by utilizing the guidelines given by [11]. We focused on answering
               the following two research questions:




                                                                                                           110
IWSM/Mensura’18, September 18–20, 2018, Beijing, China




                  RQ1.What size measurement/estimation methods are utilized in agile software de-
              velopment?
                  RQ2.What are the challenges in agile size estimation and measurement?
                  Five databases were chosen to search for the articles; Scopus1, IEEE Xplore2, Web
              of Science3, ScienceDirect4, and ACM digital Library5. For this search, the keywords
              were determined from the domain knowledge of the authors and also by observing the
              existing SLR in the literature, such as that of [8]. The resulting keyword sets were as
              follows:
                  Set 1= {agile OR XP OR "extreme programming" OR Scrum}
                  Set 2= {size AND {estimat* OR measur* OR metric}}
                  Set 3= {COSMIC OR IFPUG OR ―function point‖ OR ―functional size‖}
                  Set 4= {―story point‖ OR ―use case point‖ OR ―line of code‖ OR ―LOC‖ OR ―ob-
              ject points‖}
                  The search was performed by combining each keyword in set 1 with each keyword
              in sets 2, 3 and 4 using the AND clause.
                  After the search, a total of 2,581 articles were obtained. The number of articles re-
              trieved from each database is shown in Table 1.
                                                Table 1. Initial search results.
                                   Database               Number of articles retrieved
                                   Scopus                 944
                                   IEEE Xplore            580
                                   ScienceDirect          434
                                   ACM                    458
                                   Web of Science         165
              After removing the duplicates from the 2,581 articles, the title and abstract of each
              article were read to eliminate irrelevant sources. During this process, the following
              inclusion and exclusion criteria were used:
                  Inclusion Criteria:
                  • Reporting the findings of a software size-related study in the agile software de-
                  velopment context. To assess the improvement in the agile size measurement do-
                  main, we only included the papers in which software size was the primary objec-
                  tive or referred to improvements or comparisons by explicitly using software size
                  to estimate effort, cost, etc.
                  • Written in English,
                  • Published in a journal or conference / workshop proceedings,
                  • Full-text available.

                   Exclusion Criteria:
                   • Not using software size in agile software development,

              1
                https://www.scopus.com/search/form.uri?display=basic
              2
                https://ieeexplore.ieee.org/Xplore/home.jsp
              3
                http://www.webknowledge.com
              4
                  https://www.sciencedirect.com/
              5
                  https://dl.acm.org/




                                                                                                          111
T. Hacaloglu, O. Demirors




                   • Written in a language other than English,
                   • Partially available or inaccessible

                  A backward (looking in references) and forward (using the citations) snowballing
               step suggested in [12] is also followed to reach more number of relevant studies. For
               this aim, we adopted a similar strategy conducted in [13] such as choosing randomly
               five studies in the pool and applying snowballing process on these articles.
                  The final pool yielded 40 articles which are read to seek an answer to the research
               questions defined.


               3       Results

               3.1     Observed measures
               From the analysis of the papers, it was observed that story points were the most fre-
               quently referenced measure, and COSMIC Function Points (CFP) was the second.
               The measures observed in relation to RQ1 and the respective studies are given in
               Table 2.
                                          Table 2. Articles by size measure.
                  Main Size Measure Type6                    Articles7
                  Simplified Function Points (SiFP)[25]      [S2], [S3]
                  NESMA Function Points [24]                 [S4]
                  Function points [29]                       [S5], [S6]
                  IFPUG Function Points [23]                 [S7], [S3]
                  COSMIC Function Point (CFP) [30]           [S8], [S9], [S10], [S11], [S12], [S13],
                                                             [S14], [S16], [S17], [S18], [S19]
                  Story Points (SP)                          [S20], [S7], [S21], [S4], [S22], [S23],
                                                             [S24], [S5], [S25], [S26], [S27],
                                                             [S28],[S29], [S30], [S31], [S32], [S33],
                                                             [S37], [S38]
                  Use Case Points                            [S34], [S35], [S36],
                  Actual times                               [S39]
                  Web Objects [28]                           [S40], [S6]
                  User point                                 [S1]

               In this paper, with respect to RQ2, we focus on the size measurement and estimation
               related challenges identified in these papers. These findings led us to explore addi-
               tional articles in the literature, in addition to those retrieved from the SLR to discuss


               6
                   These measure types are not always used as is but enhanced with other attributes; for exam-
                   ple, [S36] added two elements, efficiency and risk factor, to the existing use case point esti-
                   mation method. However, in Table 2, we only included the major measure types.
               7
                   It is possible that the same article corresponds to distinct measures due to using more than
                   one measure type or comparing different measures.




                                                                                                                     112
IWSM/Mensura’18, September 18–20, 2018, Beijing, China




              the challenges in a more accurate manner. This discussion is presented in the follow-
              ing section 3.2.


              3.2     Challenges related to software size in agile projects
              In this section, we present the challenges identified related to software size in agile
              projects, which were categorized mainly as misinterpretation of size, difficulties in
              implementation, and acceptability of the measurement process. Each of these chal-
              lenges is individually presented in the following sections. The challenges depicted in
              the articles are given in Table 3.
                                             Table 2. Challenges observed
              Misinterpretation Story point can denote size= [S5, S7, S20, S21, S22, S23, S24,
              of size measure       S25, S26, S31, S32, S37], and complexity=[S39].
                                    Size can also refer to number of days [S30].
              Difficulties in       Story points are relative [S4, S5, S6, S20, S28], subjective [S4,
              application           S18], given based on team members estimating them [S8, S18,
                                    S21], not transferrable outside of the team [S18], given by
                                    comparing with simplest [S5, S28] or average [S8] story,
                                    assigned as high points for non-functional requirements [S8],
                                    under/overestimation related problems [S29], problems related to
                                    requirement uncertainty [S29], Difficulty related to FSM
                                    application [S4], is for complete projects or part of projects [S3].
                                    Estimations are not model [S18] and mathematical based [S21].
              Measurement/          Difficulty related to FSM application [S4], Problems related to
              estimation            adjusting requirements [S12, S15], Agile team members do not
              process               want a pressure one them [S39], Story point assignment is costly
              acceptability         [S1], tend to take long time [S16], affected by dominant
                                    characters [S20], Political pressure [S27].

              Interpretations of size measures. In [5] Ozkan & Demirors observed and discussed
              the misconception that practitioners in the field frequently refer to functional size as
              an effort measure. This is also observed in agile software development, not limited to
              size and effort but also seen in size and duration. This confusion between size and
              effort is also mentioned in the guidelines for functional size measurement in agile
              projects published by COSMIC [14].
                 This misinterpretation of size and effort results from the fact that what a ―story
              point‖ denotes is often ambiguous in the agile software development literature. In our
              SLR, we observed that a story point was presented as a size estimate in some articles
              but as an effort or duration estimate in others. The representative studies for example
              [S20] and [S7] generally referred to Cohn [15], who related a story point with size,
              and described it as ―a pure measure of size‖ (p.71). In [S5] Kang, Choi and Baik also
              claimed that ―In an agile project, the story points are measured to estimate the size of
              the work for each user story‖ (p.744). Similarly, in [S37] Bhalerao and Ingle suggest-
              ed a size-based estimation of stories using story points. Furthermore, in [S31] story
              point is also considered as a size measure.




                                                                                                           113
T. Hacaloglu, O. Demirors




                  On the other hand, authors in Satapathy, Panda and Rath [16] interpreted a story
               point as an ―effort measure‖ by stating that ―In the case of agile projects, story point is
               used to measure the effort required to implement a user story.‖(p.304).
                  In [S24], by referring to Cohn [15], Miranda, Bourque and Abran drew attention to
               the fact that there is a proportion between the story point and the efforts required to
               implement them, and exemplified this situation as ―A 6-point user story is expected to
               require about twice as much effort as a 3-point user story‖ (p.1327). These definitions
               were encountered in other studies, but here only some have been discussed to present
               the two main views of story points; i.e., size and effort.
                   Additionally, size was expressed in terms of duration by Cohn in [15], who pro-
               posed to measure the size of software based on ideal days by stating that it is possible
               to consider ideal days as size estimate like story points when the organizational over-
               head is not taken into account and further stating that ―Then, an estimate of size ex-
               pressed as a number of ideal days can be converted into an estimate of duration using
               velocity in exactly the same way as with story points.‖ [15] (p.46). In addition, in
               [S30] Popli and Chauhan related story points with duration as follows: ―The size of
               user story is defined in terms of number of days i.e. time needed to complete the user
               story but this time estimation contains uncertainty‖ (p. 1358).
                  In another study [S39], Hohman defined story points as ―an arbitrary, indivisible
               unit of story ‗complexity‘, intended to map linearly to the actual, calendar time neces-
               sary for completion.‖ By ‗map linearly‘ I mean that two story points are supposed to
               take twice as much calendar time to complete as one story point.‖ (―Story points,
               para. 1).
                  In [17] it is reported that ―the team defines the relationship between story points
               and effort. Usually 1 story point is equal to 1 ideal working day.‖ (p. 773). In [18]
               Goswami, Jasuja and Dhir pointed to the drawback of this view by referring to [19]
               who stated that estimating a user story with ideal time concept can be perplexing for
               developers which may lead them to assume that there is a relation between story
               points and time that is not valid because story point corresponds to a distribution of
               time.
                  It should also be noted that story points cannot be considered as an objective meas-
               ure [S4], [S8] because they are relative [S4]; [S5]; [S20], subjective [S4, S18], and
               unreliable [14], and they have a meaning limited to the project and the team they be-
               long to [S8]. They are assigned by using the experience of measurers, with the help
               analogies with previous cases or user stories the measurers have at hand at the time of
               estimation. Therefore, the way they are assigned to stories is not compliant with the
               conventional measurement procedure, described by McDermid in [20] as
               ―…measurement is the means of recording this property with integrity: objectively,
               reliably, repeatably, efficiently, and without bias or ambiguity.‖ (p.12/3).
                  The reviewed articles revealed that neither the exact meaning of a story point is
               clear nor its relationship with effort and duration. Since the story point concept is
               already troublesome because it is relative and subjective, conflicting interpretations
               make the issue even more problematic. The varying meaning of size, which is some-
               times confused with effort and duration, is emerging from the lack of a stable size
               measurement method being adopted by the agile community.




                                                                                                             114
IWSM/Mensura’18, September 18–20, 2018, Beijing, China




                 There is a clear need for well defined, concrete, objective size measurement meth-
              ods applicable in agile software projects. The size obtained through such methods can
              be used as an input to estimate the effort, duration, cost and scope by appropriate
              techniques. In addition, objective size measures can establish a baseline for bench-
              marking, portfolio management, and normalization of indirect measures, including
              defect density.

              Difficulties in application. In this part, we present the difficulties reported in the
              literature related to the application of software size measurement and estimation in
              agile software development. In [21] Javdani et al. emphasized that there was no com-
              monly accepted, standardized practice for agile software measurement. Although
              story points are a highly adopted estimate in the agile literature, it does not fulfill the
              estimation needs. In addition to the confusion and misinterpretations concerning the
              story point concept as represented in Section 3.1, there are also problems with its
              usage.
                  Story point has been frequently criticized for its relativity [S5] and subjectivity
              [S4]. In [S21], Hamouda commented on the varying nature of story points across the
              teams for similar features and emphasized that this situation can create a challenge for
              organizations in maintaining consistency across projects. Adoption of FSM methods
              is required especially for benchmarking purposes [S8]. Popli and Chauhan in their
              study [S27] pointed out that since the estimation methods used in agile projects are
              not based on mathematical formulas for effort and cost calculation, they are not effec-
              tive. To overcome this, some researchers; e.g., Khatri, Malhotra and Johri [S34] inte-
              grated technical and environmental complexity factors into use case points. However,
              the complexity perception is also a relative concept.
                  Commeyne, Abran and Djouab [22] criticized subjective estimations in agile pro-
              jects being based on a consensus, and thus varying from one team to another even for
              the same story set, depending on estimators‘ background in terms of abilities and past
              experiences, rather than the sizing of the product. In [22], the authors also emphasize
              the inability of re-using past estimates for iterations, assessing the quality of esti-
              mates, and taking related actions for improvement.
                  In Kang, Choi and Baik [S5] described the following problem that the team faced
              when assigning story points to stories-: The agile team selects the simplest user story
              to assign a point to it, and then only they can compare other user stories with it and
              assign story points. The same authors drew attention to the need for story points to be
              reassigned when the referenced user story is changed. Another similar way of assign-
              ing story points is presented in [14], where the team first selected an average user
              story, and then assigned story points to other user stories, comparing them with the
              average. Here, it can be inferred that software size estimation is restricted to the per-
              ception of estimators at the moment of estimation and to the scope of the user stories
              at hand. Moreover, when the story used as a reference is changed, the estimate should
              be updated, which leads to overheads and extra effort.
                  As a response to the problems related to subjective estimation techniques, func-
              tional size measurement methods are being adopted by the agile community.
              COSMIC [14] recently published a guideline on the usage of the COSMIC functional




                                                                                                            115
T. Hacaloglu, O. Demirors




               size measurement (COSMIC FSM) method for agile user stories. This was followed
               by attempts to apply COSMIC FSM method to agile user stories [S9] [S10] [S11] and
               observe its usability [S13], [S16], [22] in Scrum projects.
                   In [S7], Santana et al. detected a positive correlation between functional size in
               terms of IFPUG function points [23] and the number of story points. This study was
               replicated by Huijgens and Solingen [S4], who assessed the relationship between
               NESMA [24] for functional size measurement and using story points, and found a
               negative correlation. On the other hand, Lenarduzzi and Taibi in [S2] conducted re-
               search using Simplified Function Points (SiFP) [25] and IFPUG Function Points [23]
               in Scrum projects and concluded that these methods did not have any contribution to
               estimation accuracy. Since there has been only a handful studies on the topic to date,
               it is too early to draw a conclusion on the usability of functional size measurement in
               agile contexts. However, there are clear difficulties in relation to maintaining a bal-
               ance between the need to create well defined requirements for measuring functional
               size and minimizing overhead arising from welcome the changing requirements in
               agile projects. Further case studies are required to explore the usability and accepta-
               bility of functional size measures in agile projects. Furthermore, new measurement
               approaches or new extensions of current approaches that might be more suitable for
               measuring size of user stories should be explored

               Measurement/estimation process acceptability. As mentioned in Section 3.2, there
               are studies on the successful application of the functional size measurement methods
               in agile contexts. However, these methods are not widely used in practice by agile
               teams. In a survey [S15] by Huijgens et al., it was reported based that the majority of
               the participants acknowledged the importance of functional size measurement (FSM)
               in decision making, and a minority of the participants thought that in agile ―develop-
               ers do not like disturbance for functional size measurement‖ (p.60). The ratio of this
               minority group was low but still noteworthy to depict the need that adopting function-
               al size measures in the agile world should be considered as a social challenge. This
               finding was implicitly supported in [8], where it is indicated that subjective estimation
               techniques were the most used. In addition, as stated in [S8] agile teams resist replac-
               ing their already adopted sizing or estimation methods. Furthermore, in [S15] it is
               found that the participants who were against the usage of FSM complained about the
               incompatibility of the FSM techniques with the poor, open scope and changing re-
               quirements, and short-cycle characteristics of agile software development.
                  Additionally, in [S39] Hohman stated that instead of being told what to do, devel-
               opers appreciate taking over the responsibility about the share of their existing work.
               In the line of this obtained responsibility, developers benefit the authority to foresee
               the duration of the implementation rather than being told how long it is supposed to
               be and claimed that the estimates were more realistic when performed through com-
               parisons.
                  Hussain, Kosseim, and Ormandjieva in [S12] emphasized that agile processes re-
               sult in time efficiency by eliminating the necessity to adjust requirements to make
               them formalized and decomposed in a visible granularity, a task that is required by
               COSMIC method and offered an approach to use COSMIC where the formalism in




                                                                                                           116
IWSM/Mensura’18, September 18–20, 2018, Beijing, China




              requirements is not needed. The authors also supported the findings of [S15] empha-
              sizing that a FSM technique COSMIC is considered as time-consuming for agile.
                 In addition to the FSM techniques, it is pointed out in [S20] that although planning
              poker, an expert estimation technique, is a prevalent technique to size user stories, it
              suffered from being time consuming and the probability of becoming involved in
              unnecessary discussions. Salmanoglu, Hacaloglu and Demirors in [S16] also noted
              that story points-based estimation took far more effort than COSMIC-based meas-
              urement for the cases they studied.
                 In [26] Mahnič & Hovelja stated that in contrast to the studies in psychology
              claiming that group processes are risky for effort and schedule estimates, agile meth-
              odologies recommend the adoption of planning poker for user story size estimation
              and developing release and iteration plans. In [S1] Ali, Shaikh, and Ali criticized the
              group activity such as incorporating all team members to the estimation process, be-
              ing a potentially costly activity.
                 In [S20], Power drew attention to another social point: Challenge of planning pok-
              er caused by dominant characters when sizing user stories. With this aim, in their
              study, the authors tried to reduce unnecessary long discussions and save time with the
              help of silent grouping. As a result, they found that the participants acknowledged the
              effect of silent grouping positive as they were able to think and express their opinions
              freely. In [S27] Popli and Chauhan explored the causes for inaccurate estimates in
              agile development and addressed from the political pressure which may prevent a
              team to express their real estimate, and rather lead them to make an estimate that
              would satisfy the manager or customer.
                 The SLR undertaken in this study revealed that agile projects suffer from the rela-
              tive and subjective estimation techniques, such as story points, and various studies
              have drawn attention to the benefits and problems of performing software size estima-
              tion as a group activity. It is also noteworthy that developers generally resist adopting
              a formal functional size measurement technique, such as COSMIC since it requires a
              pre-study and preparation of requirements before measurement.


              4       Conclusion

              Considering the popularity of agile methodologies among the practitioners, measure-
              ment, estimation, and implicitly the size concept has come into special prominence.
              However, what software size is and how it should be measured in agile software de-
              velopment projects is not clear. It seems that the most frequently referenced story
              point concept does not fulfill the need of a size measure. It is treated fundamentally
              differently in various studies; sometimes referring to effort and time while other times
              to size based on the viewpoint of the authors. There is no doubt that a well-defined
              and accepted scope is a prerequisite for a concept to be measurable. If we do not
              know what we are measuring, it is not likely that the discussion of the results will be
              fruitful.
                 Relativity and subjectivity of estimation techniques, such as story points is the
              main criticism expressed by the researchers. The measurement and estimation process




                                                                                                          117
T. Hacaloglu, O. Demirors




               of these measures not only involve software artifacts but also human measurers, as
               well as application teams as the parameters of the process. The resultant estimations
               are project-specific and can be used for effort prediction at best. Teams need to utilize
               other measures for other common usages of size; e.g., benchmarking, portfolio man-
               agement, and normalization of other outputs like the number of defects. In addition,
               the efficiency of the estimation process as a group activity is highly questionably, and
               thus needs further research for improvement.
                  It is observed from the reported studies that functional size measurement methods
               have the potential to resolve some of these issues. However, practitioners appear to be
               reluctant to adopt these methods probably due to three main reasons: First, they find
               the application-related procedures cumbersome to follow; second, they think there is a
               mismatch between agility and the need for detailed requirements; and finally, teams
               prefer to be somewhat free to make decisions about software development.
                  In conclusion, the literature survey demonstrated the significant need for new size
               measurement techniques or modifications of the existing method that are applicable to
               agile contexts. Such new technique should consider all related components, including
               the artifacts to be measured, the measurement process to be applied, and the challeng-
               es discussed in this paper. It should also first start with a clear definition of the con-
               cepts on which it is built and resolve the confusion about the concepts in the litera-
               ture. In future work, we plan to extend this study by performing case studies to pro-
               vide a deeper understanding of the usability of the common size measurement tech-
               niques in practice. We believe that the development of a new size measure will com-
               plement our umbrella work on measurement in agile contexts [27].
                  This study has certain limitations. For example, the search was performed in a lim-
               ited number of databases, excluding grey literature and books and theses, and the
               synonyms of the search keywords were not used. In our future work, we hope to ex-
               tend the literature review considering these limitations and also do a deep analysis of
               the selected papers in this review.

               Acknowledgements
               We would like to thank to Asst. Prof. Dr. Bilge SAY for her valuable contributions in
               reviewing the article and for her precious comments which improved the article.


               References
                1. Fenton N. E., Pfleeger, S., L.: Software Metrics A Rigorous and Practical Approach. PWS
                   Publishing Company, (1997).
                2. Abran, A., Symons, C., and Ebert, C., Vogelezang, F., Soubra, H. Measurement of Soft-
                   ware Size: Contributions of COSMIC to Estimation Improvements, (2016).
                3. Gencel, C., Demirors, O.: Functional size measurement revisited. ACM Transactions on
                   Software Engineering and Methodology (TOSEM) 17(3), 15 (2008).
                4. Trendowicz, A. Jeffery, R. Appendix A: Measuring software size. Software Project Effort
                   Estimation. 433-449, (2014).
                5. Özkan, B., Demirors, O.: On the Seven Misconceptions about Functional Size Measure-
                   ment. In: 2016 Joint Conference of the International Workshop on Software Measurement




                                                                                                             118
IWSM/Mensura’18, September 18–20, 2018, Beijing, China




                  and the International Conference on Software Process and Product Measurement (IWSM-
                  MENSURA), pp. 45-52. Berlin (2016).
               6. Bilgaiyan, S., Mishra, S., Das, M.: A review of software cost estimation in agile software
                  development using soft computing techniques. In: Computational Intelligence and Net-
                  works (CINE), 2nd International Conference on. pp. 112-117, IEEE (2016).
               7. Nguyen-Cong, D., Tran-Cao, D.: A review of effort estimation studies in agile, iterative
                  and incremental software development. In: Computing and Communication Technologies,
                  Research, Innovation, and Vision for the Future (RIVF), 2013 IEEE RIVF International
                  Conference on, pp. 27-30. IEEE, (2013, November).
               8. Usman, M., Mendes, E., Weidt, F., Britto, R.: Effort estimation in agile software develop-
                  ment: A Systematic Literature Review. In: Proceedings of the 10th International Confer-
                  ence on Predictive Models in Software Engineering - PROMISE ‘14, pp. 82–91. (2014).
               9. Schweighofer, T., Kline, A., Pavlic, L., Hericko, M.: How is Effort Estimated in Agile
                  Software Development Projects?. In: SQAMIA, pp. 73-80. (2016).
              10. Osman, H. H., Musa, M. E.: A Survey of Agile Software Estimation Methods. Internation-
                  al Journal of Computer Science and Telecommunications 7(3), 38-42 (2016).
              11. Kitchenham B., Charters S. Guidelines for performing systematic literature reviews in
                  software engineering (version 2.3). Technical report, Keele University and University of
                  Durham, (2007).
              12. Wohlin, C.: Guidelines for snowballing in systematic literature studies and a replication in
                  software engineering. In: Proceedings of the 18th international conference on evaluation
                  and assessment in software engineering, pp. 38. ACM, (2014).
              13. Garousi, V., Petersen, K., Ozkan, B.: Challenges and best practices in industry-academia
                  collaborations in software engineering: A systematic literature review. Information and
                  Software Technology 79, 106-127 (2016).
              14. COSMIC, The Guideline for the use of COSMIC FSM to manage Agile Projects (2011).
              15. Cohn, M.: Agile estimating and planning. Pearson Education, (2005).
              16. Satapathy, S. M., Panda, Rath, S. K.: Story point approach based agile software effort es-
                  timation using various svr kernel methods (2014).
              17. Panda, A., Satapathy, S. M., Rath, S. K.: Empirical Validation of Neural Network Models
                  for Agile Software Effort Estimation based on Story Points. Procedia Computer Science
                  57, 772-781 (2015).
              18. Goswami, R., Jasuja, M., Dhir, S.: Impact of Different Estimation Approaches in Tradi-
                  tional and Agile Development. In: Computational Intelligence & Communication Tech-
                  nology (CICT), 2016 Second International Conference on, pp. 679-682. IEEE, (2016).
              19. Simon           Baker,         Ideal         time         vs.         story          points,
                  http://www.energizedwork.com/weblog/2006/02/ideal-time-vs-storypoints
              20. McDermid, J. A.: (Ed.), Software engineer's reference book. Elsevier (2013).
              21. Javdani, T.Zulzalil, H., Ghani, A.A.A., Md Sultan, A.B. Parizi, R. M.: On the Current
                  Measurement Practices in Agile Software Development. CoRR abs/1301.5964 (2013).
              22. Commeyne, C., Abran, A., Djouab, R.: Effort Estimation with Story Points and COSMIC
                  Function Points - An Industry Case Study. Software Measurement News 21(1), 25–36
                  (2016).
              23. IFPUG, IFPUG FSM Method: ISO/IEC 20926 - Software and systems engineering –
                  Software measurement – IFPUG functional size measurement method, New York: Interna-
                  tional Function Point User Group (IFPUG), (2009).
              24. NESMA, NESMA functional size measurement method conform ISO/IEC 24570, version
                  2.2, Netherlands Software Measurement User Association (NESMA), (2004).




                                                                                                                 119
T. Hacaloglu, O. Demirors




               25. Lavazza L., Meli, R.: An Evaluation of Simple Function Point as a Replacement of IFPUG
                   Function Point, IWSM - Mensura 2014, Rotterdam, October (2014).
               26. Mahnič, V., & Hovelja, T.: On using planning poker for estimating user stories. Journal of
                   Systems and Software, 85(9), 2086-2095, (2012).
               27. Salmanoğlu, M., Coşkunçay, A., Yildiz, A., Demirörs, O.: An Exploratory Case Study for
                   Assessing the Measurement Capability of an Agile Organization. Software Quality Profes-
                   sional 20 (2), 36-47 (2018).
               28. Reifer, D. J.: Web development: Estimating quick-to-market software. IEEE Software,
                   17(6). 57-64. (2000).
               29. Albrecht, A.J., Gaffney, J.E.: Software function, source lines of codes, and development
                   effort prediction: a software science validation, IEEE Trans Software Eng. SE-9, 639-648
                   (1983).
               30. The COSMIC Functional Size Measurement Method, Version 4.0.1, Measurement Manu-
                   al, The COSMIC Implementation Guide for ISO/IEC 19761: 2011, COSMIC Group, April
                   (2015).


               Primary Studies
                  [S1] Ali, M., Shaikh, Z., Ali, E.: Estimation of Project Size Using User Stories. In: The In-
                  ternational Conference on Recent Advances in Computer Systems, pp.54-60. (2015).
                  [S2] Lenarduzzi, V. and Taibi, D. : Can Functional Size Measure Improve Effort Estimation
                  in SCRUM?. In: ICSEA - International Conference on Software Engineering and Advances,
                  pp.173-178. Nice, France (2014).
                  [S3] Lenarduzzi, V., Lunesu, I., Matta, M.,Taibi, D.: Functional Size Measures and Effort
                  Estimation in Agile Development: A Replicated Study. In: International Conference on Ag-
                  ile Software Development, pp. 105-116. Springer International Publishing, (2015-may).
                  [S4] Huijgens, H., Solingen, R. V.: A replicated study on correlating agile team velocity
                  measured in function and story points. In: Proceedings of the 5th International Workshop on
                  Emerging Trends in Software Metrics, pp. 30-36. ACM, (2014).
                  [S5] Kang, S., Choi, O., Baik, J.: Model-Based Dynamic Cost Estimation and Tracking
                  Method for Agile Software Development. In: 2010 IEEE/ACIS 9th International Conference
                  on Computer and Information Science, pp.743-748. Yamagata (2010).
                  [S6] Soni, D., Kohli, P. J.: Cost estimation model for web applications using agile software
                  development methodology. Pertanika Journal Of Science & Technology, 25(3). 931-938.
                  (2017).
                  [S7] Santana, C., Leoneo, F., Vasconcelos, A., Gusmão, C.: Using function points in agile
                  projects. In: International Conference on Agile Software Development, pp. 176-191. Spring-
                  er, Berlin Heidelberg (2011).
                  [S8] Buglione, L.,Trudel, S.: Guideline for sizing agile projects with COSMIC.
                  In: Proceedings of the IWSM/MetriKon/Mensura, Stuttgart, Germany, (2010).
                  [S9] Desharnais, J. M., Kocaturk, B., Abran, A.: Using the cosmic method to evaluate the
                  quality of the documentation of agile user stories. In: Software Measurement, 2011 Joint
                  Conference of the 21st Int'l Workshop on and 6th Int'l Conference on Software Process and
                  Product Measurement (IWSM-MENSURA), pp. 269-272. IEEE, (2011).
                  [S10] Desharnais, J. M., Buglione, L., & Kocatürk, B.: Using the COSMIC method to esti-
                  mate Agile user stories. In: Proceedings of the 12th International Conference on Product Fo-
                  cused Software Development and Process Improvement, pp. 68-73. ACM, (2011).




                                                                                                                  120
IWSM/Mensura’18, September 18–20, 2018, Beijing, China




                 [S11] Desharnais, J., Buglione, L., & Kocaturk, B.: Improving Agile Software Projects
                 Planning Using the COSMIC Method. In: workshop on Managing Client Value Creation
                 Process in Agile Projects, pp.1-11. Torre Cane, Italy (2011).
                 [S12] Hussain, I., Kosseim, L., Ormandjieva, O.: Approximation of COSMIC functional
                 size to support early effort estimation in Agile. Data & Knowledge Engineering 85, 2-14
                 (2013).
                 [S13] Ungan, E., Çizmeli, N. and Demirörs, O.: Comparison of Functional Size Based Esti-
                 mation and Story Points, Based on Effort Estimation Effectiveness in SCRUM Projects. In
                 40th Euromicro Conference on Software Engineering and Advanced Applications Compari-
                 son, pp. 77-80. (2014).
                 [S14] Ochodek, M.: Approximation of COSMIC Functional Size of Scenario-Based Re-
                 quirements in Agile Based on Syntactic Linguistic Features—A Replication Study. In:
                 Software Measurement and the International Conference on Software Process and Product
                 Measurement (IWSM-MENSURA), 2016 Joint Conference of the International Workshop
                 on, pp. 201-211. IEEE, (2016).
                 [S15] Huijgens, H., Bruntink, M., van Deursen, A., van der Storm, T., and Vogelezang. F.:
                 An exploratory study on functional size measurement based on code. In: Proceedings of the
                 International Conference on Software and Systems Process (ICSSP '16), pp.56-65. ACM,
                 New York, NY, USA, (2016).
                 [S16] Salmanoglu, M., Hacaloglu, T., and Demirors. O.: Effort estimation for agile software
                 development: comparative case studies using COSMIC functional size measurement and
                 story points. In: Proceedings of the 27th International Workshop on Software Measurement
                 and 12th International Conference on Software Process and Product Measurement (IWSM
                 Mensura '17), pp.41-49. ACM, New York, NY, USA (2017).
                 [S17] Dumas-Monette J, Trudel, S.: Requirements Engineering Quality Revealed through
                 Functional Size Measurement: An Empirical Study in an Agile Context. In: 2014 Joint Con-
                 ference of the International Workshop on Software Measurement and the International Con-
                 ference on Software Process and Product Measurement, pp.222-232. Rotterdam, (2014).
                 [S18] Berardi, E., Santillo, L.: COSMIC-based project management in agile software devel-
                 opment and Mapping onto related CMMI-DEV process areas. In: International Workshop on
                 Software Measurement-IWSM, (2010).
                 [S19] Fehlmann, T., Santillo, L.: From story points to cosmic function points in agile soft-
                 ware development–a six sigma perspective. In: Metrikon-Software Metrik Kongress, pp. 24.
                 (2010).
                 [S20] Power, K.: Using silent grouping to size user stories. In: International Conference on
                 Agile Software Development, pp. 60-72. Springer, Berlin Heidelberg (2011).
                 [S21] Hamouda, A. E. D.: Using agile story points as an estimation technique in cmmi or-
                 ganizations. In: Agile Conference (AGILE), pp. 16-23. IEEE, (2014).
                 [S22] van Valkenhoef, G., Tervonen, T., de Brock, B., Postmus, D.: Quantitative release
                 planning in extreme programming. Information and software technology 53(11), 1227-1235
                 (2011).
                 [S23] Bhalerao, S., Ingle, M.: Incorporating Vital Factors in Agile Estimation through Algo-
                 rithmic Method. IJCSA 6 (1), 85-97 (2009).
                 [S24] Miranda, E., Bourque, P., Abran, A.: Sizing user stories using paired comparisons. In-
                 formation and Software Technology 51(9), 1327-1337 (2009).
                 [S25] Kumar, C. S., Kumari, A. A., Perumal, R. S.: An Optimized Agile Estimation Plan
                 Using Harmony Search Algorithm. International Journal of Engineering and Technology
                 (IJET) 6(5), 1994-2001 (2014).




                                                                                                                121
T. Hacaloglu, O. Demirors




                  [S26] Aslam, W. A. Q. A. R., Ijaz, F. A. R. A. H., Lali, M. I., Mehmood, W. A. Q. A. R.:
                  Risk aware and quality enriched effort estimation for mobile applications in distributed agile
                  software development. Journal of Information Science and Engineering, 33(6). 1481-1500.
                  (2017).
                  [S27] Popli, R., Chauhan, N.: Cost and effort estimation in agile software development. In:
                    Optimization, Reliabilty, and Information Technology (ICROIT), 2014 International Con-
                    ference on, pp. 57-61, IEEE (2014).
                  [S28] Popli, R., Chauhan, N.: Agile estimation using people and project related factors. In:
                    Computing for Sustainable Global Development (INDIACom), 2014 International Confer-
                    ence on, pp. 564-569. IEEE, (2014).
                  [S29] Popli, R., Chauhan, N.: Estimation in agile environment using resistance factors. In:
                  Information Systems and Computer Networks (ISCON), 2014 International Conference on,
                  pp. 60-65. IEEE, (2014).
                  [S30] Popli, R., Chauahn, N.:Managing uncertainty of story-points in Agile software. In:
                  Computing for Sustainable Global Development (INDIACom), 2015 2nd International Con-
                  ference on, pp. 1357-1361. IEEE, (2015).
                  [S31] Choudhari, J., Suman, U.: Story points based effort estimation model for software
                  maintenance. Procedia Technology, 4, 761-765 (2012).
                  [S32] Choudhari, J., Suman, U.: Phase wise effort estimation for software maintenance: an
                  extended SMEEM model. In: Proceedings of the CUBE International Information Technol-
                  ogy Conference, pp. 397-402. ACM, (2012).
                  [S33] Zahraoui, H., Idrissi, M. A. J.: Adjusting story points calculation in scrum effort &
                  time estimation. In: Intelligent Systems: Theories and Applications (SITA), 2015 10th Inter-
                  national Conference on, pp. 1-8. IEEE, (2015).
                  [S34] Khatri, S. K., Malhotra, S., and Johri, P.: Use case point estimation technique in soft-
                  ware development. In: Reliability, Infocom Technologies and Optimization (Trends and Fu-
                  ture Directions)(ICRITO), 2016 5th International Conference on, pp. 123-128. IEEE (2016).
                  [S35] Nunes, N. J.: iUCP–estimating interaction design projects with enhanced use case
                  points. In: International Workshop on Task Models and Diagrams for User Interface Design,
                  pp. 131-145. Springer, Berlin Heidelberg (2009).
                  [S36] Parvez, A. W. M. M.: Efficiency factor and risk factor based user case point test effort
                  estimation model compatible with agile software development. In: Information Technology
                  and Electrical Engineering (ICITEE), 2013 International Conference on, pp. 113-118. IEEE,
                  (2013).
                  [S37] Bhalerao, S., Ingle, M.: Agile estimation using caea: A comparative study of agile
                  projects. In: Proceeding of International Conference on Computer Engineering and Applica-
                  tion (ICCEA09), pp. 78-84. Philippines, (2011).
                  [S38] Satapathy, S. M., Rath, S. K.: Empirical assessment of machine learning models for
                  agile software development effort estimation using story points. Innovations in Systems and
                  Software Engineering 13(2-3), 191-200. (2017).
                  [S39] Hohman, M. M.: Estimating in actual time [extreme programming]. In: Agile Confer-
                  ence, pp.132-138. IEEE, 2005.
                  [S40] Celar, S., Seremet, Z., Marusic, Z., Turic, M.: Using of Web Objects method in agile
                  web software projects. In: Telecommunications Forum (TELFOR), 2013 21 st, pp. 873-876.
                  IEEE (2013).




                                                                                                                   122