        <article-title>The Semantic Network Creation for an Innovative Project Scope as a Part of Project Knowledge Ontology</article-title>
      </title-group>
      <contrib-group>
        <aff id="aff0">
          <label>0</label>
          <institution>State Enterprise "Kharkіv Scientific-Research Institute of Mechanical Engineering Technology"</institution>
          ,
          <addr-line>Sumskaya str. 130a, Kharkiv, 61023</addr-line>
          ,
          <country country="UA">Ukraine</country>
        </aff>
      </contrib-group>
      <fpage>0000</fpage>
      <lpage>0002</lpage>
      <abstract>
        <p>In the article the subject for research is the content of the innovation project. The project knowledge system and contextual competencies of the project participants are considered. The methods of system analysis, ontological approach and semantic modeling are used. A conceptual model of project knowledge is proposed, which includes the basic knowledge system of the project and competence of the performers. The generalized structure of the project content in a schematic presentation of requirements, project phases and its participants is considered. An ontological model of an innovative project content in the form of a semantic network has been developed. The practical implementation of this model was made on the example of a project for the development of a reconnaissance-strike complex for action in mountain conditions. The description of the project knowledge system and the definition of contextual competencies will allow evaluating the project personnel and solving the problem of maximum adaptation of the already formed and worked out team for a specific project.</p>
      </abstract>
      <kwd-group>
        <kwd>innovative project</kwd>
        <kwd>knowledge ontology</kwd>
        <kwd>semantic network</kwd>
        <kwd>project content</kwd>
        <kwd>people management</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>-</title>
      <p>
        In a changeable environment and unstable development of enterprises in Ukraine,
more and more attention is paid to the issue of effective management of innovative
projects. At the same time for the successful project implementation the formation of
a suitable project team plays a great importance. Therefore, special attention is paid to
the problems of recruitment [
        <xref ref-type="bibr" rid="ref1 ref2 ref3">1 - 3</xref>
        ]. In this work, staff is used as the project
management team and the project implementers — heads of departments, specialists or
scientific and technical personnel, workers or technical personnel, and support staff.
      </p>
      <p>
        Existing models and methods do not provide the full solution of such a task as the
selection and adaptation of existing staff under the project [
        <xref ref-type="bibr" rid="ref4 ref5 ref6 ref7">4 - 7</xref>
        ].
      </p>
      <p>
        While considering the qualifications of project performers, the contextual
competencies of the participants should be taken into account, but not the positions [
        <xref ref-type="bibr" rid="ref8 ref9">8, 9</xref>
        ].
Contextual competences support project values, they include an understanding of the
project, having experience of participating or managing projects at different levels,
having knowledge and experience to successfully complete the project, and
knowledge to develop criteria for the success of a project in a project-oriented
enterprise [
        <xref ref-type="bibr" rid="ref10 ref11 ref12">10 - 12</xref>
        ].
      </p>
      <p>
        Recently, great attention has been paid to the formation and analysis of the
knowledge system in project management. For example, in [
        <xref ref-type="bibr" rid="ref13">13</xref>
        ], the information
component of knowledge management in an enterprise is considered, which is a
source of processes information, serves as reference and control documents when
introducing new forms of project management, is a methodical basis for staff training
and represents a database of documents in the audit management system. The
theoretical substantiation of the formation of core competencies of project managers on the
basis of the characteristic properties of adjacency matrices and its degrees creates the
main interest [
        <xref ref-type="bibr" rid="ref14">14</xref>
        ]. The use of ERP-systems allows to plan various types of resources
based on the company knowledge, but this class of systems implements a functional
approach, does not take into account the structure of project knowledge. [
        <xref ref-type="bibr" rid="ref15">15</xref>
        ].
      </p>
      <p>
        The theoretical substantiation of the formation of core competencies of project
managers on the basis of the characteristic properties of adjacency matrices and its
degrees creates the main interest [
        <xref ref-type="bibr" rid="ref16 ref17">16, 17</xref>
        ].
2
      </p>
      <p>
        Main Material Presenting
Ontological data analysis involves the creation of a terms glossary for studying the
characteristics of the objects and processes that make the system. In addition, the
basic logical interrelationships between the corresponding terms are documented.
Thus, the ontology of knowledge includes a set of terms and rules according to which
these terms can be combined to build reliable statements about the state of the system
at some point in time. Basis of these statements, appropriate conclusions can be done
that allow to made changes to the system in order to increase the efficiency of its
functioning [
        <xref ref-type="bibr" rid="ref18">18 - 20</xref>
        ].
      </p>
      <p>A conceptual model of knowledge is proposed (Fig. 1), which includes the main
areas of knowledge: the project knowledge system and the competences of the
executives. The model also describes the process of forming knowledge models:
 definition of the project knowledge ontology, which allows you to a hierarchy of
knowledge areas for project content,
 determination of the knowledge ontology of the project staff on the competencies
of the performers categories,
 comparison of the project knowledge system with the staff competencies.
Consider the main components of the conceptual model. The ontology of knowledge
about the project includes the classification of projects [21, 22] and the project
content model in the form of a semantic network.</p>
      <p>The ontology of knowledge about the project provides a certain level of flexibility
of the knowledge model and the possibility of its gradual development. In addition,
this ontology contains the concepts and relations, which is necessary for the formation
of a hierarchy of knowledge areas of project management [23].</p>
      <p>Ontology of project knowledge
General structure of the project
scope model</p>
      <p>Creation of the project</p>
      <p>semantic network
Project classification system</p>
      <p>Project scope</p>
      <p>Hierarchy of project knowledge areas</p>
      <p>"Leaders"
"Specialists" Strategy</p>
      <p>Control
"Workers"</p>
      <p>Execution</p>
      <p>Project staff competence system
Competence of the
project management
team</p>
      <p>Contextual
competence of
scientific and
technical staff</p>
      <p>Knowledge and
skills of technical
staff</p>
      <p>The ontology of the project team includes a description of the basic concepts of the
team management and project executors - the knowledge of the performers;
knowledge of scientific and technical personnel; knowledge of the technical staff.</p>
      <p>For objects with knowledge that are described in the ontology of the project team,
meta descriptions are created. The meta description of the object i has the following
form:</p>
      <p>Mi = {Mik, Mic},
(1)
where Mik - a set of metadata corresponding to the properties of the ontology concept,
and an instance of which is the described object,</p>
      <p>Mic - a set of metadata describing the knowledge content about an object.</p>
      <p>The structure of the specified metadata in the form of concept properties is
described in the ontology of the project team. Metadata element values are either
references to other instances of concepts, or literals. Thus, these metadata associate an
instance of an object - a source of knowledge with other instances of objects
described in the ontology of the project team, and therefore this component can be
called "contextual metadata".</p>
      <p>The second component of the meta descriptions (Mic) directly describes the
knowledge that is implicitly or explicitly contained in the object. This part of the
meta-description connects the object with instances of concepts from ontologies of
knowledge about the project and can be called “content metadata”.</p>
      <p>Content metadata for object i can be described as follows:</p>
      <p>Mi = {(tri1, ki1), . . . , (trif, kif)},
(2)
where trij = &lt;sij , pij, oij&gt; – triplet;</p>
      <p>sij –some concept from the ontology of the domain area, knowledge of which is
contained in the described object;
pij – relation defined in the ontology of the domain area;
oij – reference to the instance of the concept in the domain area ontology;
kij ∈ (0,1] – coefficient denoting the relevance of the triplet trij for object i. While
describing a metadata triplet, the elements pij and oij may be skipped.</p>
      <p>Let consider the features of project knowledge, taking into account the complex
classification of projects. For the effective implementation of an innovative project,
the description of a new subject area is important. Each domain area has its own
specifics, which can greatly affect the way the innovation implementation.</p>
      <p>Based on the specifics of the subject area, the structured content of the project is
described (Fig. 2).</p>
      <p>Initiation phase</p>
      <p>Task 1
Task 2
. .</p>
      <p>Task N</p>
      <p>Concept phase</p>
      <p>Task 1
Task 2
. .</p>
      <p>Task N</p>
      <p>Requirments
To project</p>
      <p>To product
Planning phase</p>
      <p>Task 1
Task 2
. .</p>
      <p>Task N</p>
      <p>Implementation</p>
      <p>Task 1
Task 2
. .</p>
      <p>Task N</p>
      <p>Completion phase</p>
      <p>Task 1
Task 2
. .</p>
      <p>Task N
Project management team</p>
      <p>Project performers</p>
      <p>Typically, project content includes:
 description of requirements;
 list and description of project stages;
 list and description of tasks;
 list and description of project activities;
 the structure of the project executors, etc.</p>
      <p>It should be noted that in order to analyze the provided project, as well as to
determine and take into account the specifics of the project knowledge that executors
should have, initially it is necessary to classify projects according to various
classification criteria: areas of activity, by the nature of the domain area of the project, by
scale, by duration, by complexity, etc. [24].</p>
      <p>The next step is to determine the knowledge of the project in accordance with the
basic processes of the project scope management [25].
1. In the process of project initialization, the knowledge system includes: knowledge
of the political, socio-economic, technological, eco-logical state of the external
environment of the project; knowledge of the mission, vision, main objectives of the
project; knowledge of the project strategy; ability and skills to identify the
strengths and weaknesses of the project, opportunities and threats; skills and
experience in evaluating the beneficial effect of the project and activities; experience
for estimating potential costs etc.
2. In the process of project scope planning, the knowledge system includes:
knowledge to create databases and knowledge bases; forecasting experience,
including expert and formalized methods; experience in developing scenarios for the
development of objects and their environment; skills to identify and analyze the
strengths and weaknesses of the object, opportunities and threats; skills to identify
and analyze the problems of maintaining the achieved state and achieving the
previously set goals; experience in the formation of goals, criteria and priority areas
for development etc.
3. In the process of determining the project scope, knowledge and skills are needed
for working with templates of hierarchical work structures.
4. In the process of checking the project scope, skills and experience communication
with the customer are necessary, as well as a comparative analysis of the planned
and current state of the project products, activities, phases and tasks.
5. In the process of monitoring changes in the content of the project are needed: skills
of working with reports; knowledge, skills and experience with the project change
control system, methods and tools for additional content planning and content
determination.</p>
      <p>For a detailed structured description of the project domain, it is necessary to form an
ontology of its content. One of the effective tools for the formation of ontology is the
semantic network. The basis of the semantic network is instances or objects, concepts
or classes, attributes, relationships [26].</p>
      <p>The construction of a semantic model begins with the selection of composite
elements, which act as objects of description. Based on the content of the technical task
of the innovation project, we will define the objects for describing the semantics
model. It should be noted that each element of the description can be single or
represent a group of elements [27].</p>
      <p>Nodes and links in the proposed semantic network have the following attributes:
Name – line of text (object name), the corresponding node.</p>
      <p>ObjectClass – object class of the corresponding node: Functional, Organization,
Specification, Resource, Structural.</p>
      <p>ObjectType – the type of the object corresponding to the node: the central concept
(Central), the context (Context), the group of concepts (Group).</p>
      <p>SemanticType – semantic rank. The main digits are: information (Inform), property
(Property), executor (Excuter)</p>
      <p>Relation – the type of semantic connection between nodes used to build a network.</p>
      <p>The following classes of objects are highlighted here:
 Functional (project name, project purpose, basis for implementation, goal structure,
etc.)</p>
      <p>ObjectClass = “Functional”[O1, O2.1, O2.2, O2.3, O3.3];
 Organization (project team, implementing organizations)</p>
      <p>ObjectClass = “Organization”[O2.4, O2.4.1];
 Specification (basic requirements for implementation, requirements for the product
and works, etc.)</p>
      <p>ObjectClass = “Specification”[O3.1, O5.1, О5.1.1, О5.1.2, О5.1.3, О5.1.4];
 Structural (development stages, work hierarchy)</p>
      <p>ObjectClass = “Structural”[O3.2, О4.1];
 Resource (work resources)</p>
      <p>ObjectClass = “Resource”[O5.2, O5.2.1, O5.2.2, O5.2.3].</p>
      <p>When describing elements, the types of objects were highlighted (ObjectType):
 Central – central concept when building a semantic network (project name, basis
for project execution)</p>
      <p>ObjectType= “Central”[O1, О2.1];
 Context – auxiliary, clarifying the concept (the purpose of the project, the structure
of goals, the project team, the performers, the basic requirements, stages, tasks)
ObjectType= “Context”[O2.2, О2.3, O2.4, O2.4.1, O3.1, O3.2, О3.3, O4.1];
 Group – group of concepts (technical requirements, product specifications, quality
of work, duration of work, cost of work, resources)</p>
      <p>ObjectType= “Group”[O5.1, О5.2, O5.1.1, O5.1.2, O5.1.3, O5.1.4, O5.2.1,</p>
      <p>O5.2.2, O5.2.3].</p>
      <p>When describing the elements, semantic types were identified. (SemanticType):
 Inform - the name of the project, the basic requirements, steps, tasks. These
elements are textual, they are purely informational characteristics of the development
object</p>
      <p>SemanticType = “Inform” [O1, О3.1, O3.2, O3.3, O4.1];
 Property - the basis for the development, the purpose of the project, the structure of
goals, requirements for the project, product characteristics, quality of work,
duration, cost of work, resources, logistics. These elements are characterizing, they
describe the properties of an innovative product and the conditions for its
development</p>
      <p>SemanticType = “Property”[O2.1, O2.2, O2.3, O5.1, О5.2, O5.1.1, O5.1.2,</p>
      <p>O5.1.3, O5.1.4, O5.2.1, O5.2.2, O5.2.3];
 Executor - project team, performers. Are objects of the semantic network that
describe the project participants</p>
      <p>SemanticType = “Executor”[O2.4, O2.4.1].</p>
      <p>Define the types of relationships used to build a semantic network (Relation):
 clar - a link that indicates that the lower level object is a top-level refinement
object;
 dep - expresses the relationship between objects;
 deagr - expresses the decomposition of a single top-level object into several
lowlevel objects;
 inv - connection shows that one object is a consequence of another element of the
semantic network.</p>
      <p>These types of links allow to display the relationship of elements with regard to their
semantic features (Fig. 3). Dotted arrows indicate the connections between the
elements, which reflect the innovative properties of the project.</p>
      <p>О2.1
О3.1</p>
      <p>O1
О2.3
О2.2
О2.2.1
О5.1</p>
      <p>О4.1
О3.2
О3.3
О2.4
О2.4.1
О5.2
О5.1.1
О5.2.1
О5.2.2
О5.2.3
О5.1.2
О5.1.3</p>
      <p>О5.1.4</p>
      <p>An important step in building a semantic model is the partitioning of the semantic
network in accordance with the phases of the innovation project life cycle.</p>
      <p>Four phases are most often distinguished: the initiation phase, the planning phase,
the implementation phase and the completion phase.</p>
      <p>However, for the innovative project the most complete, it seems to be the
allocation of another phase before the planning of the project - the concept phase. A
diagram that reflects the involvement of staff at different stages is presented in fig. 4.</p>
      <p>As at the last stage there is only the closure of all documentation, the compilation
of reports, the termination of contracts, this work is typical for most types of projects
and does not require the acquisition of additional specialized knowledge to perform
such work. Therefore, from the ontology of knowledge, the first four phases of the
innovation project life cycle are more important, as well as the works and participants
that are involved in these stages.</p>
      <p>The semantic model of the project scope from its division into phases of the
innovation project life cycle is structured as a tree-visible model, that is, the connections
between its elements are directed from top to bottom, which allows them to be
considered in accordance with the development of the project life cycle phases. The
initiation phase includes the following elements: the name and purpose of the project, as
well as the basis for its development. Elements such as: project goals, executives,
requirements, stages, tasks, and project work relate to the concept phase. The
remaining elements (all types of resources and technical requirements) belong to the
planning and implementation phase.</p>
      <p>Project management</p>
      <p>team
In the first three phases, considerable attention is paid to the management staff,
researchers and engineering and technical personnel, since it is mainly these
participants who are involved in the preparation of the project. In the fourth phase, the
emphasis in the selection of personnel is shifted to the working-production personnel.</p>
      <p>The practical implementation of this model was made on the example of a project
for the development of a reconnaissance-strike complex for action in mountain
conditions (Fig. 5). A hierarchy of classes and subclasses of the project scope was formed
and a semantic network was built in the form of a graph in the Protégé system.
Structured presentation of knowledge and concepts about the project allowed to determine
the relationship in the knowledge system and appropriately determine the necessary
competence of the project staff.
The developed ontological model of the innovation project scope is used to determine
the classes of objects that correspond to the knowledge classes for functional
specialists and specialists in general. The advantage of this model is the possibility of
structuring the project content in the form of a hierarchy of knowledge about the project
requirements, the main tasks and performers. However, this model is static, does not
allow to display the dynamics of interrelations during the project implementation.</p>
      <p>The next stage of the research is the selection of the required amount of knowledge
from each class of the semantic model, in accordance with the role in the project
management team; definition of knowledge set required for the full implementation of
the project, and further - the comparison of object classes and functional roles of the
project management team.
19. Soffer, P. et al.: Modelling off-the-shelf information systems requirements: an ontological
approach. Requirements Engineering 6(3), 183-199 (2001).
20. Ovdiy, O., Proskuddina, G.: Ontology in the context of information integration:
presentation, methods and construction tools. Problems of programming 2(3), 353-365 (2004)
21. Gruber, T.: Ontology, http://tomgruber.org/writing/ontology-definition-2007.htm, last
accessed 2019/03/16.
22. Derenskaya, Ya.: Classification of projects in project management,
http://www.finanalis.ru/litra/328/2895.html, last accessed 2019/03/19.
23. Nosova, N., Lysenko, E.: Creation of project classification criterion and project knowledge
for all project types. Radioelectronic and computer systems 2 (66), 135-140 (2014).
24. Brandt, S., et al.: An ontology-based approach to knowledge management in design
processes. Computers &amp; Chemical Engineering, vol. 32, 1-2, 320-342 (2008).
25. Malyeyeva, O., Nosova, N., Artyuh, R.: Comprehensive method of project knowledge
presentation and evaluation according to the project specific and project staff categories.</p>
      <p>Control, Navigation and Communication Systems 2(42), 171 – 175 (2017).
26. Nekrasov, A., Sokolova, N., Lysenko, D.: The semantic model of the technical
documentation ontology for the development of scientific and technical products. Control, navigation
and communication Systems 2(6), 96 – 101 (2007).
27. Nosova, N.: Semantic model of project scope for innovation technical project. Information
Processing Systems 4 (94), 258-262 (2011).</p>
    </sec>
  </body>
  <back>
    <ref-list>
      <ref id="ref1">
        <mixed-citation>
          1.
          <string-name>
            <surname>Gavkalova</surname>
          </string-name>
          , N.:
          <article-title>Human resource capacity as the basis of personnal management. Economic and management of machine building enterprise: the problems of theory and practice 3</article-title>
          ,
          <fpage>4</fpage>
          -
          <lpage>14</lpage>
          (
          <year>2014</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref2">
        <mixed-citation>
          2.
          <string-name>
            <surname>Baiden</surname>
            ,
            <given-names>B.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Price</surname>
            ,
            <given-names>A.</given-names>
          </string-name>
          :
          <article-title>The effect of integration on project delivery team effectiveness</article-title>
          .
          <source>International Journal of Project Management</source>
          <volume>29</volume>
          (
          <issue>2</issue>
          ),
          <fpage>129</fpage>
          -
          <lpage>136</lpage>
          (
          <year>2011</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref3">
        <mixed-citation>
          3.
          <string-name>
            <surname>Semiv</surname>
            ,
            <given-names>L.</given-names>
          </string-name>
          :
          <article-title>Personnel management in the minds of economics knowledge</article-title>
          .
          <source>UBS NLU</source>
          , Kiev (
          <year>2011</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref4">
        <mixed-citation>
          4.
          <string-name>
            <surname>Kosenko</surname>
            ,
            <given-names>N.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Kadykova</surname>
            ,
            <given-names>I.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Artiukh</surname>
          </string-name>
          , R.:
          <article-title>Formalization the problem of a project team building based on the utility theory</article-title>
          .
          <source>Innovative Technologies and Scientific Solutions for Industries</source>
          <volume>1</volume>
          (
          <issue>1</issue>
          ),
          <fpage>53</fpage>
          -
          <lpage>57</lpage>
          (
          <year>2017</year>
          ). doi:https://doi.org/10.30837/
          <fpage>2522</fpage>
          -
          <lpage>9818</lpage>
          .
          <year>2017</year>
          .
          <volume>1</volume>
          .
          <fpage>0534</fpage>
        </mixed-citation>
      </ref>
      <ref id="ref5">
        <mixed-citation>
          5.
          <string-name>
            <surname>Malyeyeva</surname>
            ,
            <given-names>J.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Persiyanova</surname>
            ,
            <given-names>H.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Kosenko</surname>
            ,
            <given-names>V.</given-names>
          </string-name>
          :
          <article-title>Information and software support of the HR manager of an IT-company</article-title>
          .
          <source>Innovative Technologies and Scientific Solutions for Industries</source>
          <volume>1</volume>
          (
          <issue>3</issue>
          ),
          <fpage>22</fpage>
          -
          <lpage>32</lpage>
          (
          <year>2018</year>
          ). doi:https://doi.org/10.30837/
          <fpage>2522</fpage>
          -
          <lpage>9818</lpage>
          .
          <year>2018</year>
          .
          <volume>3</volume>
          .
          <fpage>022</fpage>
        </mixed-citation>
      </ref>
      <ref id="ref6">
        <mixed-citation>
          6.
          <string-name>
            <surname>Burke</surname>
          </string-name>
          , R.:
          <article-title>Project management: planning and control techniques</article-title>
          . New Jersey, USA (
          <year>2013</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref7">
        <mixed-citation>
          7.
          <string-name>
            <surname>Kosenko</surname>
            ,
            <given-names>N.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Kolomiiets</surname>
            ,
            <given-names>A.</given-names>
          </string-name>
          :
          <article-title>Building and developing a project team on the basis of a multicriteria model</article-title>
          .
          <source>Innovative Technologies and Scientific Solutions for Industries</source>
          <volume>2</volume>
          (
          <issue>2</issue>
          ),
          <fpage>56</fpage>
          -
          <lpage>61</lpage>
          (
          <year>2017</year>
          ). doi:https://doi.org/10.30837/
          <fpage>2522</fpage>
          -
          <lpage>9818</lpage>
          .
          <year>2017</year>
          .
          <volume>2</volume>
          .0566.
        </mixed-citation>
      </ref>
      <ref id="ref8">
        <mixed-citation>
          8. De Los Rios, I., et al.:
          <article-title>Project-based learning in engineering higher education: two decades of teaching competences in real environments</article-title>
          .
          <source>Procedia-Social and Behavioral Sciences</source>
          <volume>2</volume>
          (
          <issue>2</issue>
          ),
          <fpage>1368</fpage>
          -
          <lpage>1378</lpage>
          (
          <year>2010</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref9">
        <mixed-citation>
          9.
          <string-name>
            <given-names>Project</given-names>
            <surname>Management</surname>
          </string-name>
          :
          <article-title>Fundamentals of professional knowledge, National requirements for the competence of specialists. "Consulting agency" CUBS Group -</article-title>
          "
          <string-name>
            <surname>Cooperation</surname>
          </string-name>
          ,
          <string-name>
            <surname>Business-Service</surname>
            <given-names>"</given-names>
          </string-name>
          , Moscow (
          <year>2001</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref10">
        <mixed-citation>
          10.
          <string-name>
            <surname>Jałocha</surname>
            ,
            <given-names>B.</given-names>
          </string-name>
          , et al.:
          <article-title>Key competences of public sector project managers</article-title>
          .
          <source>Procedia-Social and Behavioral Sciences</source>
          <volume>119</volume>
          ,
          <fpage>247</fpage>
          -
          <lpage>256</lpage>
          (
          <year>2004</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref11">
        <mixed-citation>
          11.
          <string-name>
            <surname>Paszkiewicz</surname>
            ,
            <given-names>Z.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Picard</surname>
            <given-names>W.</given-names>
          </string-name>
          :
          <article-title>Modeling competences in service-oriented virtual organization breeding environments</article-title>
          .
          <source>In: Proceedings of the 2011 15th International Conference on Computer Supported Cooperative Work in Design (CSCWD)</source>
          (
          <year>2011</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref12">
        <mixed-citation>
          12.
          <string-name>
            <surname>Gebert</surname>
            ,
            <given-names>H.</given-names>
          </string-name>
          , et al.:
          <article-title>Knowledge-enabled customer relationship management: integrating customer relationship management and knowledge management concepts</article-title>
          .
          <source>Journal of knowledge management 7</source>
          (
          <issue>5</issue>
          ),
          <fpage>107</fpage>
          -
          <lpage>123</lpage>
          (
          <year>2003</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref13">
        <mixed-citation>
          13.
          <string-name>
            <surname>Kulkarni</surname>
            ,
            <given-names>U.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Ravindran</surname>
            ,
            <given-names>S.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Freeze</surname>
            <given-names>R.:</given-names>
          </string-name>
          <article-title>A knowledge management success model: Theoretical development and empirical validation</article-title>
          .
          <source>Journal of management information systems</source>
          .
          <volume>23</volume>
          (
          <issue>3</issue>
          ),
          <fpage>309</fpage>
          -
          <lpage>347</lpage>
          (
          <year>2006</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref14">
        <mixed-citation>
          14.
          <string-name>
            <surname>Vaisman</surname>
            ,
            <given-names>V.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Velichko</surname>
            ,
            <given-names>V.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Gogunsky</surname>
            ,
            <given-names>V.</given-names>
          </string-name>
          :
          <article-title>The system of enterprise standards for knowledge management in a project-managed organization</article-title>
          .
          <source>Works of Odessa Polytechnic University</source>
          <volume>1</volume>
          ,
          <fpage>256</fpage>
          -
          <lpage>261</lpage>
          (
          <year>2011</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref15">
        <mixed-citation>
          15.
          <string-name>
            <surname>Somers</surname>
            ,
            <given-names>T.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Nelson</surname>
            ,
            <given-names>K.</given-names>
          </string-name>
          :
          <article-title>A taxonomy of players and activities across the ERP project life cycle</article-title>
          .
          <source>Information &amp; Management</source>
          <volume>41</volume>
          (
          <issue>3</issue>
          ),
          <fpage>257</fpage>
          -
          <lpage>278</lpage>
          (
          <year>2004</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref16">
        <mixed-citation>
          16.
          <string-name>
            <surname>Diakoulakis</surname>
            ,
            <given-names>I.</given-names>
          </string-name>
          , et al.:
          <article-title>Towards a holistic knowledge management model</article-title>
          .
          <source>Journal of knowledge management 8</source>
          (
          <issue>1</issue>
          ),
          <fpage>32</fpage>
          -
          <lpage>46</lpage>
          (
          <year>2004</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref17">
        <mixed-citation>
          17.
          <string-name>
            <surname>Gogunsky</surname>
            ,
            <given-names>V.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Lukianov</surname>
            ,
            <given-names>D.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Vlasenko</surname>
            ,
            <given-names>O.</given-names>
          </string-name>
          :
          <article-title>Definition of knowledge on count nuclei competence of project managers</article-title>
          .
          <source>Eastern-Еuropean journal of enterprise technologies</source>
          ,
          <source>vol. 1</source>
          <volume>10</volume>
          (
          <issue>55</issue>
          ),
          <fpage>26</fpage>
          -
          <lpage>28</lpage>
          (
          <year>2012</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref18">
        <mixed-citation>
          18.
          <string-name>
            <surname>Doerr</surname>
            ,
            <given-names>M.:</given-names>
          </string-name>
          <article-title>The CIDOC conceptual reference module: an ontological approach to semantic interoperability of metadata</article-title>
          .
          <source>AI</source>
          magazine
          <volume>24</volume>
          (
          <issue>3</issue>
          ),
          <volume>75</volume>
          (
          <year>2003</year>
          ).
        </mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>