<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Archiving and Interchange DTD v1.0 20120330//EN" "JATS-archivearticle1.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta />
    <article-meta>
      <title-group>
        <article-title>The incremental goal evolution process methodology</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>Shinobu SAITO</string-name>
          <email>saitousnb@nttdata.co.jp</email>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Shuichiro YAMAMOTO</string-name>
          <email>yamamotosui@nttdata.co.jp</email>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <aff id="aff0">
          <label>0</label>
          <institution>NTT DATA CORPORATION Research and Development Headquarters 1-21-2 Shinkawa, Chuo-ku and Tokyo</institution>
          ,
          <addr-line>104-0033</addr-line>
          <country country="JP">Japan</country>
        </aff>
      </contrib-group>
      <fpage>254</fpage>
      <lpage>261</lpage>
      <abstract>
        <p>This paper proposes the incremental goal evolution process methodology from the view point of the approach to business process optimization. This paper first presents a procedure for proposed methodology, which is composed of 6 steps. An actual business process of industrial factory is analyzed by adopting this methodology in on-site case study. the result of case study indicate that proposed methodology is contribute to evolving both goal and business process by analysis of business process-data. This paper finally indicates validation of the methodology and future work.</p>
      </abstract>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>1 Introduction</title>
    </sec>
    <sec id="sec-2">
      <title>2 The incremental goal evolution process</title>
      <p>The Business Process Management (BPM) methodology improves business processes
[5]. Fig.1 overviews steps of the methodology. First a present business process (as-is
model) is defined. Next goal is analyzed. And finally to-be model is designed based
on the goals and business processes which improve the as-is model. This business
process improvement is repeated continuously.</p>
      <p>In this methodology, goals are made by the interview and discussion with the person
in charge of the business. However checking the validity of goals and reviewing the
goals aren't mentioned closely. So we propose new methodology which includes steps
of checking and reviewing goals. Fig.2 shows the steps of the proposed methodology.
1.Define present business process
(Define as-is model)</p>
      <p>2.Identify Goal
3.business process improvement</p>
      <p>(Design to-be model)
Improve to-be model continuously</p>
      <sec id="sec-2-1">
        <title>Step 1 - Define present business process (Define as-is model).</title>
        <p>Identify actors and event (activity) in the business process and its boundary. Identify
material and information in the business process.</p>
      </sec>
      <sec id="sec-2-2">
        <title>Step 2 - Identify Goal.</title>
        <p>Identify a goal to be attained by the business process. Then, the function (hard-goal)
which is necessary for the goal is considered.</p>
      </sec>
      <sec id="sec-2-3">
        <title>Step 3 - Associate Business Process with Goal</title>
        <p>Associate business process with the goal. And Identify actors which have
responsibility for the goal by business process–actors association.</p>
      </sec>
      <sec id="sec-2-4">
        <title>Step 4 - Visualize Business Process (Analyze business process-data)</title>
        <p>Collect and evaluate business process-data. Business process data, it points at the data
by measuring the performance of the work in the business process. For example
“Process start-time”, “Process finish-time”, “Movement start-time”,” Movement
finish-time” and so on.</p>
        <p>Then visualize (analyze) business process by business process-data.</p>
      </sec>
      <sec id="sec-2-5">
        <title>Step 5 - Evaluate and Check Goal</title>
        <p>Check and evaluate the goal based on the analysis of the business process in step 3.
And change the goal identified by step2.</p>
      </sec>
      <sec id="sec-2-6">
        <title>Step 6 - business process improvement (Design to-be model)</title>
        <p>Improve business process in accordance with the goal reconsidered in step 5. Then,
Return to step 3 again. The step 3 through step 6 repeats continuously.</p>
      </sec>
    </sec>
    <sec id="sec-3">
      <title>3 Case study</title>
      <p>This section describes a case study applying the incremental goal evolution process.
We adopt it to business process at an industrial factory which manufactures
automobile parts.
itcuo ltrno
rodP cno
ihpSm tonC
ien lro Production
achM tcon Order
Outline of business process: the production control person who took an order from
client does production planning and shows “production order” to leaders of each
process. The leader does job planning and shows “job order” to the manufacturing
worker and the machine control person. The machine control person does set-up of
the machine in accordance with the kind of materials. The manufacturing worker
prepares materials and manufacture (processing, inspection) after set-up is completed
by the machine control person. When finished, the machine control person moves
materials to the next process. When product is completed by passing through
processes, the shipment control person confirms product with reference to “Shipment
Order” and finally ship to client.</p>
      <sec id="sec-3-1">
        <title>Step1 - Define present business process (Define as-is model)</title>
        <p>BPMN (Business Process Modeling Notation) is used in this paper as a notation of
business process [6]. The diagram is shown in the Fig.3.</p>
      </sec>
      <sec id="sec-3-2">
        <title>Step2 - Identify Goal</title>
        <p>optimization of
production process
delivery performance</p>
        <p>Improvement
In this step we aim to confirm consistency of business processes and goals. This
association between business process-goal and goal-actor will become guidelines to
interview the person in analysis of business processes. The result of this step is omitted in
this paper.</p>
      </sec>
      <sec id="sec-3-3">
        <title>Step4 - Visualize Business Process (Analyze business process-data)</title>
        <p>Although business process was defined in step 1, it only explained the overview
structure of business process. In this step actual business process-data is collected and
analyzing the business process. For acquisition of business process-data we used
RFID-tag attached to Job order sheet (show Fig.5). RFID-tag is contributed to
minimize work load and accurate data collecting. The examples of analysis technique of
business process-data are described as followings.</p>
      </sec>
      <sec id="sec-3-4">
        <title>1. Trace graph (Fig.6):</title>
        <p>The trace graph paid attention to each material and progress result of which is showed
by time transition (x-axis). The y-axis of trace graph shows the progress conditions of
the subject (Material). “Process1” and ”Process2” shows the conditions that a subject
is being processed (manufactured). “Wait“ shows that a subject is accumulated
between the processes. By this we know the point where the material flows becomes
complex and where material flow sequence become changes and so on.</p>
      </sec>
      <sec id="sec-3-5">
        <title>2. Accumulation graph (Fig.7):</title>
        <p>The accumulation graph paid attention to each process and Cumulative throughput of
which showed by time transition (x-axis). By this we know point which is a
bottleneck process and which is instability of process throughput and so on.</p>
      </sec>
      <sec id="sec-3-6">
        <title>3. Operating time graph (Fig.8):</title>
        <p>The operating graph paid attention to operating time of each process and operating
rate of which showed by time transition (x-axis). By this we know which process is
always low operating rate and always low operating rate and so on.</p>
      </sec>
      <sec id="sec-3-7">
        <title>Step5 - Evaluate and Check Goal</title>
        <p>Considerations are made using graphs, mentioned above. These graphs visualize
business process-data. The improved goals after the step of evaluation and check are
shown in Fig.9.</p>
        <p>optimization of
production process
delivery performance</p>
        <p>Improvement</p>
      </sec>
      <sec id="sec-3-8">
        <title>1. Considerations by Trace graph:</title>
        <p>It became clear that material flow of order changes frequently among whole process.
By interview with leaders of each process they don’t share planning information
during each process and therefore job plans are made individually by each leader.
Because of that, when express order and trouble occurred, they couldn't cope with it.
So it can't hope for the great effect even if hard-goal "production planning cycle
shortening" is realized. We create new soft-goal "Co-operation among processes" and
new hard-goal "Share job planning through all process”</p>
      </sec>
      <sec id="sec-3-9">
        <title>2. Considerations by accumulation graph:</title>
        <p>The bottleneck process could be easily discovered by accumulation graph. In the
bottleneck process the measured cycle-time (manufacturing time per one material)
was much longer than those of production control person expected. Furthermore it is
uneven. So, we create a new soft-goal “worker skill improvement” (is sub-goal of
“Bottleneck process improvement”) and a hard-goal “Standard manual for worker”.</p>
      </sec>
      <sec id="sec-3-10">
        <title>3. Considerations by operating time graph:</title>
        <p>It found that operating rate wasn't high level in each process by operating time graph.
This shows the machine performance is satisfactory under the current condition.
Therefore a hard-goal "Machine performance improvement" doesn’t greatly
contribute a soft-goal "Lead-time shortening".</p>
      </sec>
      <sec id="sec-3-11">
        <title>Step6 - business process improvement (Design to-be model)</title>
        <p>Check of business process is done based on the goal after evaluation and check by
step5. Improvement Plan Candidates is shown in Fig.10.
io lo
tcu trn
rodP cno
ten lro
ihpSm tonC
ien lro Production
achM tcon Order
A "Share job planning" activity is added by hard-goal "Share job planning through all
process ". Each leader could make working plan by united standard. Since the
information of each material’s progress could be shared timely by the machine control
person and leaders in each process, “Result reporting" activity is moved at the next of
“Material Input” activity and ”Material Output” activity. by hard-goal “Real-time
progress reporting”.
4</p>
      </sec>
    </sec>
    <sec id="sec-4">
      <title>Conclusion and future work</title>
      <p>We propose a methodology of the continuous goal evolution process toward the
optimization of the business process. The methodology is also applied to the actual
business field, and evaluated. The Advantage of the proposed methodology is the
goal check step using business process-data which could gather from the actual
environment of the business. This will help business process improvement.
Although the methodology is able to apply all the business processes, it could hardly
apply to creative processes that have no obvious steps. For example Research and
Development, Product Planning, marketing have remain ambiguous human activities.
And the proposed methodology needs more actual usage in case study to gain
experience with strength and weaknesses of methodology.</p>
    </sec>
  </body>
  <back>
    <ref-list>
      <ref id="ref1">
        <mixed-citation>
          <string-name>
            <given-names>Shuichiro</given-names>
            <surname>Yamamoto</surname>
          </string-name>
          : Requirement Engineering, http://www.bcm.co.jp/ ,2005
          <string-name>
            <given-names>E.</given-names>
            <surname>Yu</surname>
          </string-name>
          and
          <string-name>
            <given-names>J.</given-names>
            <surname>Mylopoulos</surname>
          </string-name>
          <article-title>: Enterprise Modeling for Business Redesign: the i* Framework, SIGGROUP Bulletin</article-title>
          , vol.
          <volume>18</volume>
          , No.
          <volume>1</volume>
          ,1997 Lawrence Chung, Brian Nixon,
          <string-name>
            <given-names>Eric</given-names>
            <surname>Yu</surname>
          </string-name>
          ,
          <source>John Mylopoulos: Non-Functional Requirements In Software Engineering</source>
          , Kluwer Academic Publishers ,2000
          <string-name>
            <given-names>A.</given-names>
            <surname>Lamsweerde</surname>
          </string-name>
          et al :
          <source>The KAOS Project : Knowledge Acquisition in Automated Specification of Software, Proc.of AAAI Spring Symposium Series</source>
          , Track: “
          <article-title>Design of Composite Systems”</article-title>
          , Mar.
          <year>1991</year>
          , pp.
          <fpage>59</fpage>
          -
          <lpage>62</lpage>
          Roger Burlton: Business Process Management: Incorporating Internet Strategies, Sams,
          <year>2001</year>
        </mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>