==Challenges and Working Solutions in Agile Adaptation: Experiences from the Industry==
Challenges and Working Solutions in Agile Adaptation:
Experiences from the Industry1
Özden Özcan-Top1, Onur Demirors2 and Fergal Mc Caffery3,4
1
Graduate School of Informatics, Middle East Technical University, Ankara, Turkey
2
Department of Computer Engineering, Izmir Institute of Technology, Izmir, Turkey Springer
3
Regulated Software Research Centre, Dundalk Institute of Technology, Dundalk, Ireland
4
STATSports Group, Newry, Ireland
ozdenoz@metu.edu.tr, onurdemirors@iyte.edu.tr,
fergal.mccaffery@dkit.ie
Abstract. Challenges in agile adaptation is inevitable in software development
projects and have to be dealt with by software practitioners. The pathway to ex-
cellence in agility requires experience of challenges, failure of process scenarios;
and the discovery of working solutions by software development teams. The ma-
jor purpose of this study is to highlight both the challenges organizations faced
when implementing agile techniques and the solutions adopted that proved suc-
cessful. In order to specify these challenges and working solutions, we performed
a multiple case study by using the Software Agility Assessment Reference Model
(AgilityMod). In this paper, we describe two cases that achieve the highest levels
of agility among eight cases and describe their experiences in achieving a good
adaptation through the challenges that they faced and the solutions that were
found for these challenges. Additionally, we provide two challenges that have
not been resolved yet and are subject to further discussions.
Keywords: Agile Software Development, Agility Assessment, Agile Adapta-
tion, AgilityMod.
1 Introduction
Agile software development is one of the most important paradigms that radically
changed how software is developed [1]. The agile manifesto and principles [2] inspired
many people.
The promises made by the agile manifesto were so tempting that inevitably, agile
was considered as a silver bullet. After a while, it was noticed by the software commu-
nity that agile software development is not a “one size fits all” kind of approach. Every
project, whether small or large, distributed or collocated has its own conditions that are
specific to those environments. Besides, organizations do not quickly progress from
low to high levels of agility. The pathway to excellence in agility requires experience
1
Copyright ©2020 for this paper by its authors. Use permitted under Creative Commons License
Attribution 4.0 International (CC BY 4.0).
2
of challenges, failure of process scenarios; and the discovery of working solutions by
software development teams.
Unresolved challenges may end up with the fossilization of software development
teams, which is a phenomenon described as being stuck with a condition that prevents
someone from improving. Mitigating the impact of such challenges had a significant
role on team performance and breaking the domino effect created by such challenges
[3].
It is also significant to identify to what degree a software development team com-
promises agility while discovering the solutions that work for them. Agile maturity and
agility assessment models are utilized to identify upon which side of the agility line an
organization resides. Previously we assessed the capability of existing models [4], but
were not convinced with the quality of such models.
We developed the Software Agility Assessment Reference Model (AgilityMod) to
provide a structured model for agility assessment. The Model provides a means for
identifying agility gaps in software development projects [36].
We performed a multiple case study to identify AgilityMod’s applicability in oper-
ational software development projects. The case study included eight industry cases. In
this paper, we present the two cases (Case G and Case C), which achieved the best
agility results. The main emphasis of this paper is upon the lessons learnt from the most
successful implementations of agile and that is why we only focus on the two most
successful cases.
The purpose of this paper is to describe both the challenges organizations faced when
implementing agile techniques and the solutions adopted that proved successful. We
think that it is also very important for the challenges to be described with their own
environments where they were observed. From this perspective, the paper will provide
a specific insight to readers about what could work, under what kind of conditions. The
challenges described here are not at an abstract level, but actual, detailed and specific.
This paper is structured as follows: In Section 2, we discuss the challenges organi-
zations face when embarking upon agile software development and suggested solutions
for these challenges, based upon previous documented research. In Section 3, we briefly
explain the Software Agility Assessment Reference Model (AgilityMod) that we de-
veloped and was subsequently used within the eight case studies. In section 4, we pre-
sent the case study. In section 5, we both provide the challenges that were faced in agile
adaptation and the specific solutions that were successfully implemented in two organ-
izations. In Section 5, we also describe two challenges that still need to be further in-
vestigated for effective solutions. Finally, in Section 6, we present our overall opinion
on this topic.
2 Background
Agile has had a groundbreaking impact on software development. Debates on what
agile is still continue, as to whether agile is: a development and management philoso-
phy; a collection of technical practices; a way of life; or all of these [1].
3
Nerur et al. specify that agile and traditional approaches diverge in a number of as-
pects: approach to control, management style, knowledge management, role of the cus-
tomer in development process, role assignment, communication style, development
life-cycle, organizational culture and technology [2]. Boehm makes this discussion over
developers, customers, requirements, architecture, refactoring, team size and the pri-
mary objective of the development [3].
Stober and Hansmann compare the characteristics of software development teams to
the characteristics of fractal units in mathematics which are self-similarity, goal-orien-
tation, self-organization, self-improvement and vitality [4] .
The core set of Agile methods or to use Highsmith’s phrase Agile Software Devel-
opment Ecosystems [5] include Dynamic Systems Development Method [6], Scrum
[7], Agile Software Process Model [8], Crystal collection [9-12], Extreme program-
ming [13, 14], Internet Speed Development [15-17], Adaptive Software Development
[18], Pragmatic Programming [19], Feature Driven Development [20], Agile Modelling
[21], Lean Software Development [22] and Test Driven Development [23]. These mod-
els which are developed for varying real life conditions, share a set values which were
later defined in agile manifesto in 2001[24].
For organizations transitioning from traditional approaches to agile approaches, ma-
jor challenges are observed in customer involvement, documentation, upfront require-
ment analysis, document-driven testing, communication and knowledge sharing [25].
Heeagar mentions that it is difficult to find solutions to these challenges applicable in
organizational contexts and valid in terms of agility. However, she does not provide
any solutions that worked for large scale, and document driven software organizations
[25].
Sekitoleko et.al [26] specify the challenges associated with using agile within large-
scale distributed software development teams. They define “technical dependency” as
“the relationships and interactions between artifacts and teams during product develop-
ment”. From this perspective, they present the major challenges as “the planning chal-
lenge, the task prioritization challenge, the knowledge sharing challenge, the code
quality challenge, and the integration challenge”. Even if the presented challenges are
valid in a general context, we think that “technical dependency challenge” term mis-
leads the reader. The term is usually used for the dependencies among architectural
elements at the architectural level [27].
Kaisti et.al’s study is also valuable as they specified agile challenges in an embedded
systems development domain, a domain that had not benefited much from the agility
so far [28]. The major challenges listed in this study are “high cost of change late in
development due to hardware components”, “difficulties in making frequent software
releases”, “not avoiding documentation at different levels of software development due
to integration of different stakeholders to the process and due to the regulatory stand-
ards”, and “long development cycles of electronics and mechanics design”.
There are a small number of studies on identification of agile adoption challenges
specified through empirical research and focused on real life cases. Identification of
optimum granularity levels for user stories has been studied by Liskin et.al [29]. Their
work is one of the studies that analyzes the challenges and provides solutions for them.
4
Ramesh [30] et. al identified seven agile requirements engineering (RE) challenges
by collecting data from 16 organizations with semi-structured interviews, participant
observations and review of documents. The challenges are associated with RE practices
are: “agile estimation approaches and the need for early and accurate project estimates
in projects”, “agile architecture approach and architecture inadequacy with the emer-
gence of requirements”, “neglect of non-functional requirements and unavailability of
on-site customer in requirements elicitation”, “the conflicts between business value
based requirement prioritization and the architecture development”, “inadequate re-
quirements verification” and “misunderstood minimum documentation concept”. Alt-
hough those challenges point to significant problems in agile software development, all
of the practices mentioned are not specific to agile requirements engineering. In addi-
tion, the problems mentioned about the neglect of non-functional requirements, mini-
mal documentation and inadequate requirements verification cannot be listed as chal-
lenges in agile adoption rather they are examples of poor implementation choices and
can be resolved without violating the agile principles.
Conboy et. al [31] examined the people related challenges associated with agile soft-
ware development in 2011 through a case study followed by focused group discussions.
They specified the following challenges: developer fear caused by skill deficiencies,
the need for competence in broad range of skills, increased reliance on social interac-
tion, lack of business knowledge among developers, lack of developer motivation in
implementing agile methods, devolved decision making due to self-organization, and
implementing agile compliant performance evaluation systems instead of individual
evaluation.
Compared to other research papers described above, the last three emphasize the
real-life problems. The others basically focus on the challenges from a high level (ab-
stract) perspective. We do not ignore these attempts however, we are sure that we
should be more specific about the challenges, the solutions and the surrounding condi-
tions that created those challenges to provide insight about real life situations to the
reader.
3 Software Agility Assessment Reference Model (AgilityMod)
AgilityMod is a software agility assessment reference model the structure of which was
defined in accordance with the ISO/IEC 15504-Process Assessment Model [32, 33].
From AgilityMod’s perspective, Agility is the capability of being able to give and
obtain feedback rapidly, being adaptive to changing conditions, having confidence on
developing solutions to complex problems, being creative and innovative, respecting
others, working with humility, learning from mistakes, improving continuously, solv-
ing problems/issues with communication and moving away from complex and bureau-
cratic procedures.
The model mainly consists of two dimensions: Aspect Dimension and Agility Dimen-
sion which can be seen on Fig.1.
5
Agility
Dimension
LEVEL 3: EFFECTIVE
Agile Manifesto and Principles
LEVEL 2: LEAN AGILITY ASSESSMENT
REFERENCE MODEL
AgilityMOD
LEVEL 1: AD-HOC
Aspect
Dimension
LEVEL 0: NOT IMPLEMENTED
Agile Practices and Processes
Fig. 1. Dimensions of AgilityMod
The first dimension of the Model is the Aspect Dimension. This dimension is de-
scribed with Aspects rather than processes. Because, the formal process layers of tradi-
tional software development are intertwined to each other in agile software develop-
ment. Therefore, it is difficult to specify boundaries for agile processes. From this per-
spective, the Aspects are a collection of interrelated and interacting activities of agile
processes and practices that are integrated under meaningful and agile compatible ab-
stract definitions [5]. The aspect dimension consists of four aspects: “Exploration”,
“Construction”, “Transition” and “Management”. The cultural issues which are a sig-
nificant part of agile adaptation are taken into account in the agility dimension.
The purpose of the Exploration Aspect is to understand the customer/user needs and
to transform these needs into artifacts that initiate communication for elaboration on
them during construction and manage the changes to these artifacts. The purpose of the
Construction Aspect is to develop a high-quality software solution that is ready to be
built, including architecture, design, coding and unit testing activities. The Transition
Aspect includes practices to establish and maintain reliable and repeatable build, inte-
gration and deployment practices to keep the application in a working state throughout
development. This makes it possible to obtain feedback in relation to the problems in
the process, to make the whole process visible to everyone, and to shorten the response
time for changes. Finally, the purpose of the Management Aspect is to perform planning
and tracking activities continuously, and estimating collaboratively to achieve effi-
ciency and performing these practices as value adding activities to the project life cycle
At the Agility Dimension, Agility of an aspect is described with four Levels: “Not
Implemented (L0)”, “Ad-Hoc (L1)”, “Lean (L2)” and “Effective (L3)”. When an aspect
progresses from the bottom level to the top level, its conformance to agile values and
principles increases.
At Level 0, the aspect practices are either not achieved or partially achieved. At
Level 1, fundamental development processes such as requirements development, de-
sign, coding, integration, testing, and deployment are performed consistently. There are
transition attempts towards agility by exploring best fitting agile practices or ap-
proaches. Aspect practices are implemented and aspect purposes are achieved; however
agile values and principles are not fully incorporated into aspect practices. At Level 2,
work products are developed iteratively and incrementally, non-value-added activities
6
are eliminated from the aspect practices, balance is achieved between adaptive and pre-
dictive works. At Level 3, each aspect is performed to achieve delivering value with
high productivity and low defects by employing agile engineering practices and using
agile tools to support a continuously improving environment.
4 The Case Study
We performed this study using a qualitative research approach where the researchers
collect data in the natural settings through overviewing documents, observing behavior
or interviewing participants [34]. Through reviewing other qualitative research strate-
gies, we selected the case study research to collect and analyze the empirical evidence.
The case study research is suitable for “how” and “why” type questions and the re-
searcher has little control over events in a real-life context [35].
We performed a multiple case study that included eight cases. We observed the ap-
plicability of AgilityMod for the identification of agility gaps in software projects and
also to identify strengths and the weaknesses of the Model. We explained the case study
and the results in detail in [36]. As the scope of this paper is to describe the agile adap-
tion challenges and lessons learnt from the most successful cases, here we describe only
the two cases that had achieved the highest agility levels from the eight cases: Case G
and Case C.
4.1 Description of the Cases
We selected the eight cases randomly in order to observe different levels of agility for
each aspect. The rationale behind this approach is that without performing an agility
assessment, it is not rational and easy to make judgments about the maturity of the
cases, just by knowing the duration of agile adaption efforts.
Below, we both describe the two organizations that the projects were performed in
and the two projects that were subjected to this research. Again, we are not describing
all eight cases here, just the cases that achieved the hightest agility levels after the
assessment with AgilityMod.
Case G
Organization G is a government IT organization responsible for developing e-govern-
ment software for various governance organizations. It is located in Ankara, Turkey.
The project (Case G) that was subjected to the assessment, is an e-government pro-
ject, providing solutions to 40 foundations which are located in different cities of Tur-
key and with approximately 25 million Turkish citizens. Case G includes 21 employees
divided into four teams which report to a project manager and an assistant project man-
ager. Three of these teams purely work on software modules, the last one is involved
in both system infrastructure and software development activities. Each team has a
technical team leader. Other members of the team did not have specific roles, each one
was involved in analysis, design and development activities. Since the beginning of the
7
project in 2009, 7 million LOC has been developed. The product is developed in itera-
tions, each of which is one month in length. There is a signed contract between the
organization and the customer to specify the deadlines and budget.
The functional domain of the assessed project, is classified as a “Controlling Data
System” based on the CHAR group method [37].
Case C
Organization C works within the internet security domain. They develop products with
the purpose of securing information on the internet, securing websites and e-commerce
applications and personal computers. Org. C is an international company, doing busi-
ness over 100 countries, having 25 million end users, and over 7000 business partners.
Case C is a digital advertisement sharing platform. It is in use and new versions of
the product are being deployed continuously. The purpose of the project is to ensure
the security of the advertisements and to deliver harmless and focused advertisements
to end users. The project includes 22 employees. There are three different development
teams and Scrum Masters for each of the teams. Overall, there are four testers, 13 de-
velopers and an architect. Additionally, each team has a program manager. Apart from
these members, there is a product owner residing in the US.
Case C is built upon legacy code. Java, PhP and Python languages are being used
for different modules of the product. The project includes big data analyzes performed
using the tools Cassandra and Hadoop. Scrum is used for project management activi-
ties. The product is built iteratively with each iteration lasting three weeks.
4.2 Case Study Conduct
We assessed the Agility of Case G and Case C by both interviewing with project team
members and observing of the outputs produced during the project life cycles. Prior to
the case study conduct, we developed a list of scripted questions related to the aspect
practices and agility practices of the Model. We followed a semi-structured interview
which included asking additional questions based on the project context and challenges.
Each interview session was recorded and transcribed. The assessor was one of the au-
thors of this paper who had four years of experience on agile software development at
that time.
For Case G, the assessment was performed over a three-hour time period with the
technical leader of the infrastructure team who had worked formerly as a developer and
has knowledge about the project’s processes. For Case C, the assessment was per-
formed in a three-hours with the configuration manager and the quality assurance man-
ager who is also the scrum master of the project.
After the assessments, we developed the agility assessment reports and shared these
reports with the case organizations. In addition, we presented the results to the assess-
ment teams. The presentations covered the assessment findings, the aspect levels and
the improvement suggestions. After or during each presentation, we discussed the re-
8
sults with attendees. Thus, we ensured the validity of the case study results by discuss-
ing our findings and observations with the interviewees and managers in the organiza-
tions.
We present the agility assessment results in Fig. 2 and Fig. 3 for Case G and Case C
respectively. These figures give the colored schema of the assessment ratings to provide
a visual high-level view of the findings. Each column refers to the practices of Agili-
tyMod (APx and GPx). The colors and the numbers in each cell refer to the achieved
levels of these practices. We used a-four-level rating scale to express the achievement
of the aspect attributes: “not achieved (0-red), partially achieved (1-yellow), largely
achieved (2-orange) and fully achieved (3-green) and not applicable (NA)”. For an agil-
ity level to be reached, all the practices should be largely or fully achieved.
The Case G achieved Level-3: Effective for all of the aspects. This essentially means
that Case G’s aspects are iteratively performed, lean, technically excellent and contin-
uously improving. Fast feedback is obtained and effectively communicated among
team members. On the other hand, the customers are located in a different building.
The communication between the customer and the team is not as effective as the com-
munication among team members. The ways to communicate with the customer needed
to be improved. It was found that retrospective studies to identify improvement areas
are not performed regularly. It is suggested to perform regular retrospective studies that
would provide much more value to the processes. Another recommendation provided
to teams was to establish a generic measurement framework to improve the decision
making.
Similarly, Case C also showed very good results. All of the practices of exploration
and management aspects of Case C were rated as fully achieved. The Construction as-
pect of Case C is at Level 3. The weakest aspect of Case C is the “Transition” aspect
which is at Level 2: Lean level. The major improvement areas for this project in terms
of the Agility are achieving continuous integration, continuous delivery and increasing
unit test coverage and automated test ratio, refactoring continuously and managing
technical debt better.
Fig. 2. Rating of Each Practices of Case G
Fig. 3. Rating of Each Practices of Case C
In Fig. 4, we provide a comparative radar chart to display the differences between
the ideal case (blue line) (the case that the all practices were fully achieved) and the
current situation of Case G (orange line) and Case C (grey line). The data to draw the
9
current situation of the cases for each aspect was obtained by adding the rating values
in each cell along with the horizontal columns given on Fig. 2 and Fig. 3 (E: Explora-
tion, M: Management, T: Transition, C: Construction). This chart allows us to observe
the how far each case’s Aspect is from being fully agile according to AgilityMod.
Fig. 4. Comparison of Case G and Case C with the Ideal Case
5 Challenges Faced Agile Adaptation and Working Solutions
In this section, we present two types of challenges: First, the challenges that Case C
and Case G teams overcame through implementing successful solutions (Resolved).
Second, the challenges that need further discussion (Unresolved). A summary of the
challenges and working solutions is provided in Table 1.
5.1 Resolved Challenges
Having no on-site customer: As specified in the Agile Manifesto, one of the critical
success factors in agile software development is the level of interaction between soft-
ware development teams with their customers.
In Case G, the Product Owner (PO) lives in the United States, while the rest of the
team reside in Turkey. However, the product owner communicates with the program
managers regularly (3 to 5 times in a week) over teleconferencing despite the 8 hours
difference. The PO does not only communicate with the program managers but also
with the scrum masters and the developers when further clarification is required for the
backlog items.
This case shows that “distance” is not an excuse for low levels of communication
with the customer. The commitment of the customer is a very significant part of over-
coming the no on-site customer challenge. In Case C, what we found was that having
customers on different continents has given Case C teams significant insight into the
10
importance of communication where they have focused on ways to strengthen their
interaction channels.
Granularity level of requirements: In agile software development, user stories are
a widespread way of specifying software requirements. However, the identification of
optimum granularity levels for user stories still remains a challenge. Coarsely granu-
lated user stories are the source of difficulties and problems in the estimation process
[29].
In Case C, a well working process has been implemented for this challenge. It was
stated that the business needs were transformed into software requirements through the
following stages: First, the product owner and/or program managers define the business
needs as “epics” in the product backlog in Atlassian’s Jira tool. Second, the program
managers and software development teams perform “backlog grooming meetings” once
a week where each epic were split-down into user stories.
It is essential to mention here that these grooming meetings were performed inde-
pendent of the scope of the upcoming sprints. If the teams require further information
to clarify some issues, the PO was requested to involve in those meetings.
The teams use two approaches to decide on the optimum granularity level for user
stories. The first one is the “story points (sp) estimation”. A user story is not included
in a sprint, if its size is above a threshold (for Case C, it was 20 sp.). A user story is
discussed, detailed and re-estimated until it reaches the pre-specified sp level. The sec-
ond one is the “acceptance criterion” which is essential for both of the development and
test teams. Definability of the acceptance criteria is an indicator of a well-defined user
story which was spilt-down into a sufficient level of detail.
Growth of product backlog at a constant pace: As specified by Rubin [38] and
defined in AgilityMod [39] as a generic agility practice; the balance between the up-
coming items and outgoing items in a software development process has a significant
effect on the work to be done without interruption. This flow has to be smooth so that
developers do not need to wait to receive new items to develop from business analysts;
and that testers are also not idle just because there is no current item to be tested.
In Case C, there had been a stage when this flow had been interrupted. The product
backlog had not grown in a constant pace. Upon investigation, it was observed that the
issue arose due to communication problems among the PO in the US and the program
managers in Turkey. Once they sensed the reason for the problem, they established a
communication matrix that had to be updated whenever the PO and the program man-
agers communicated with each other. After a while, the problem became so obvious
that the frequency of the communication was once or twice in a month between some
of the program managers and the product owner. A communication matrix is not a di-
rect solution for this challenge, but it is a very effective tool to observe communication
problems.
Since the effectiveness of communication is considered a critical success factor in
agile software development and the effect of the communication matrix observed by
the Case C team, they started using it to observe all the interactions within the project.
Consequently, Case C established a correlation between the growth of the product
backlog and the numbers in the communication matrix.
11
Another solution for the continuous product backlog growth in the Case C, is the
conduct of regular product backlog grooming (PBG) meetings. The program managers,
scrum masters, developers, testers and the product owner are the members of PBG
meetings. Teams spend almost two hours a week for elaboration activities. Since it is
regular, even a two-hour-time makes a big difference in solving such a significant prob-
lem.
Nonfunctional retrospective meetings: Retrospective meetings are one of the ways
to transform good teams to great teams [40]. It is one of the easiest ways to turn the
challenges into successful practices in agile software development. However, they may
easily turn into useless meetings.
When the Case C quality assurance manager observed that none of the improvement
suggestions proposed in the retrospective meetings were implemented, he decided two
things: The first one was to open action items for each of the issues and assign the items
to team members using the Jira tool. The second one was to specify a team quality
criterion based upon the percentage of closed retrospective issues in Jira. Both these
approaches allowed the Case C teams to perform effective retrospective meetings and
observe the results very quickly.
Ineffective review meetings: Conventional review meetings might be a waste of
time for software development teams in some cases. Especially when lots of ideas are
discussed, without a decision being made. The solution found by the Case G team was
to provide a tool support for design and code reviews. They utilized the Confluence
tool to review class and sequence diagrams in software design and the Crucible tool for
design and code reviews. They specified the rule of everyone on the team can comment
on the code parts and all the comments are seen by other reviewers. After this initial
review, final remarks are decided with a meeting if necessary.
Motivation problems and software quality: There are various reasons for motiva-
tional problems in software development teams.
The Case G team members had suffered from high personnel turnover in the testing
team and this was not the only problem. They were in a continuous “fire-fighting” re-
active state, because of the bugs found in released versions of the product G.
In such a case, it might be very difficult to notice the sources of the problem and
easy to blame other people working in the team. Eventually the Case G team noticed
that the problem mentioned above was due to a decrease in the motivation level of the
testers. The managers in the company were hiring successful, experienced and talented
developers to establish a strong testing team. However, they were assigned mostly
black-box manual testing roles which do not require good development skills but re-
quire domain knowledge.
The managers of the Case G have made a radical decision to quit manual testing and
abolished the test team. All of the testers were assigned to different parts of the devel-
opment team where there is no distinction among team members. Then, they were asked
to code the automated unit tests. It was mentioned that this had been one of the breaking
points for the Case G team in terms of moving towards agility. They resolved this chal-
lenge by collaborative work and adopting shared responsibility.
Ability to manage technical debt: Technical debt is evitable in software develop-
ment, but it can be managed. In some cases, team needs to develop quick solutions or
12
hot fixes which may cause technical debt. On the other hand, it is very easy to overlook
the created technical debt in daily life turmoil, if there is no specific mechanism to
control it.
The solution that was found by the Case G team for this challenge by assigning the
responsibility of recovery from technical debt to the person who created it and follow-
ing the progress of such recoveries via a tracking system such as Jira.
Table 1. Summary of the Challenges and Working Solutions
Challenges Working Solutions
No on-site customer Take the commitment of the customer for frequent meetings
Decide the frequency of the meetings
Involve customer and product owner to team discussions
Varying granularity Break down the user stories until the size of each is below a
level of requirements threshold level
Define acceptance criteria for each user story
Nonfunctional retro- Define action items in issue or item tracking system for each of
spective meetings the improvement items and assign that items to a person
Review all the previously specified improvement action items be-
fore the retrospective meeting
Ineffective review Use tool support to review design and code
meetings Let everyone in the team comment on the code parts and all the
comments seen by other reviewers
Decide final remarks with a short meeting
Motivation problems Combine test teams and development teams
caused by team divi- Abandon manual testing except for the exploratory testing
sions Support collaborative work and shared responsibility
Ability to manage Give the responsibility to manage the technical debt to the person
technical debt who created it
Make sure you recorded the technical debt to not to overlook it
5.2 Unresolved Challenges
The following challenges were observed in the projects; however, satisfactory solutions
have not been found for them yet.
Identification of the dependencies among design elements for change manage-
ment: Knowing the relationship between design elements has a significant impact on
identification of changes within an existing software system. On the other hand, the
larger the system, the more difficult it is to specify the relations among modules or
lower level design parts. In addition, teams mostly overlook and rely on personal expe-
riences for change impact analyses until the system grows to an unmanageable size.
This was what happened in both Cases. The impact of new requirements on modules
and lower level module components were evaluated based on personal experiences. To
date, they have not experienced significant issues due to not establishing traceability.
But, this is a valid concern for them as their systems grow rapidly.
Brown, Nord and Ozkaya emphasize the importance of architectural agility in
achieving success [27]. They suggest dependency analysis among architectural ele-
ments and high-level design capabilities. We suggested this approach to both teams at
13
the multiple case study reporting phase. Unfortunately, this approach did not find much
interest by agile software developers in our cases. They found it very difficult to estab-
lish a relationship matrix manually and maintain it with every change. Therefore, this
challenge remains valid and we feel that effective and practical ways to establish design
relations needs to be identified.
The efficiency of the code comments: Code comments are significant especially
for the living software systems where a policy of little documentation is applied. To-
day’s source control systems do not allow developers to check-out code parts without
any comments. But the efficiency of the code comments is not evaluated. There is a
need to identify and evaluate efficiency of code comments to increase the clarity of the
code especially at maintenance phase of a software development life cycle.
6 Conclusion and Future Work
Agile software development methods are frequently adapted in recent years by the soft-
ware community as they are seen as well solutions for software development problems.
Upon the introduction of this new approach to traditional software development envi-
ronments, researchers and practitioners started to deal with agile adaptation challenges.
As most of the agile software development models are not highly prescriptive in
terms of adoption processes, the experience reports published in this topic remains as
an important problem for practitioners in specific contexts.
In this paper, we briefly described the Software Agility Assessment Reference
Model (AgilityMod) the purpose of which is to assist software organizations in as-
sessing projects’ agility levels, indicating the gaps that prevent fully obtaining the ben-
efits of agile software development and introducing roadmaps in adopting agile princi-
ples/practices. Secondly, based on the multiple case study that we had assessed software
projects’ agility with AgilityMod, we selected most successful two cases among the
eight cases. We presented the challenges that these cases had faced during agile adap-
tation and the best solutions that worked very well for them. The major contribution of
this study is the insights provided to readers about real life challenges faced and how
these challenges were overcame. We also discussed two unresolved challenges that will
require further research.
Further studies need to be performed for the discovery of efficient solutions for such
problems. We believe that the software industry will benefit from experience reports
discussing challenges observed and lessons learnt in different domains.
ACKNOWLEDGMENTS
This study is partially supported by Turkish Scientific and Technological Research
Council of Turkey (TÜBİTAK), grant number 113E528. This research is also supported
in part by Science Foundation Ireland under a co-funding initiative by the Irish Gov-
ernment and European Regional Development Fund),and by Lero - the Irish Software
Research Centre (http://www.lero.ie) grant 10/CE/I1855 & 13/RC/20194
14
References
1. T. Dingsøyr, T. Dybå, N. Brede Moe, T. Dingsøyr, and T. Dybå, "Agile Software Develop-
ment," Agile Software Development: Current Research and Future Directions, ISBN 978-3-
642-12574-4. Springer-Verlag Berlin Heidelberg, 2010, vol. 1, 2010.
2. S. Nerur, R. Mahapatra, and G. Mangalaraj, "Challenges of migrating to agile methodolo-
gies," Communications of the ACM, vol. 48, pp. 72-78, 2005.
3. B. Boehm, "Get ready for agile methods, with care," Computer, vol. 35 pp. 64-69, 2002.
4. T. Stober and U. Hansmann, Agile Software Development: Best Practices for Large Soft-
ware Development Projects vol. 3: Springer, 2010.
5. J. Highsmith, "What Is Agile Software Development?," The Journal of Defense Software
Engineering, vol. 15, pp. 4-9, 2002.
6. J. Stapleton, DSDM Dynamic Systems Development Method: the method in practice: Cam-
bridge University Press, 1997.
7. K. Schwaber, "Scrum development process," in Business Object Design and Implementa-
tion, ed: Springer, 1997, pp. 117-134.
8. M. Aoyama, "Agile software process model," in Computer Software and Applications Con-
ference, 1997. COMPSAC'97. Proceedings., The Twenty-First Annual International, 1997,
pp. 454-459.
9. A. Cockburn, Crystal clear: a human-powered methodology for small teams: Addison-Wes-
ley Professional, 2004.
10. A. Cockburn, Agile software development: the cooperative game (agile software develop-
ment series): Addison-Wesley Professional, 2006.
11. A. Cockburn, Surviving object-oriented projects: a manager's guide: Addison-Wesley
Longman Publishing Co., Inc., 1998.
12. A. Cockburn, "Writing effective use cases, The crystal collection for software profession-
als," ed: Addison-Wesley Professional Reading, 2000.
13. K. Beck, Extreme programming explained: embrace change: Addison-Wesley Professional,
2000.
14. K. Beck, "Embracing change with extreme programming," Computer, vol. 32, pp. 70-77,
1999.
15. M. A. Cusumano and D. B. Yoffie, "Software development on Internet time," Computer,
vol. 32, pp. 60-69, 1999.
16. R. Baskerville, L. Levine, J. Pries-Heje, B. Ramesh, and S. Slaughter, "How Internet soft-
ware companies negotiate quality," Computer, vol. 34, pp. 51-57, 2001.
17. R. Baskerville and J. Pries-Heje, "Racing the E-bomb: How the Internet is redefining infor-
mation systems development methodology," in Realigning research and practice in infor-
mation systems development, ed: Springer, 2001, pp. 49-68.
18. J. A. Highsmith and K. Orr, Adaptive software development: a collaborative approach to
managing complex systems: Dorset House Pub., 2000.
19. A. Hunt, The pragmatic programmer: from journeyman to master: Addison-Wesley Profes-
sional, 2000.
20. S. R. Palmer and M. Felsing, A practical guide to feature-driven development: Pearson Ed-
ucation, 2001.
21. S. W. Ambler, Agile modeling: Wiley, 2002.
22. M. Poppendieck and T. Poppendieck, Lean software development: An agile toolkit: Addi-
son-Wesley Professional, 2003.
23. K. Beck, Test-driven development: by example: Addison-Wesley Professional, 2003.
24. (2001). Agile Manifesto. Available: www.agilemanifesto.org
15
25. L. T. Heeager, "How Can Agile and Documentation-Driven Methods be Meshed in Prac-
tice?," in Agile Processes in Software Engineering and Extreme Programming, ed: Springer,
2014, pp. 62-77.
26. N. Sekitoleko, F. Evbota, E. Knauss, A. Sandberg, M. Chaudron, and H. H. Olsson, "Tech-
nical Dependency Challenges in Large-Scale Agile Software Development," in Agile Pro-
cesses in Software Engineering and Extreme Programming, ed: Springer, 2014, pp. 46-61.
27. N. Brown, R. Nord, and I. Ozkaya, "Enabling Agility Through Architecture," DTIC Docu-
ment2010.
28. M. Kaisti, T. Mujunen, T. Mäkilä, V. Rantala, and T. Lehtonen, "Agile principles in the
embedded system development," in Agile Processes in Software Engineering and Extreme
Programming, ed: Springer, 2014, pp. 16-31.
29. O. Liskin, R. Pham, S. Kiesling, and K. Schneider, "Why we need a granularity concept for
user stories," in Agile Processes in Software Engineering and Extreme Programming, ed:
Springer, 2014, pp. 110-125.
30. B. Ramesh, L. Cao, and R. Baskerville, "Agile requirements engineering practices and chal-
lenges: an empirical study," Information Systems Journal, vol. 20, pp. 449-480, 2010.
31. K. Conboy, S. Coyle, X. Wang, and M. Pikkarainen, "People over process: key people chal-
lenges in agile development," 2011.
32. "ISO/IEC 15504-2:2003 Information technology -- Process assessment -- Part 2: Performing
an assessment," ed, 2003.
33. "ISO/IEC 15504-5:2012 Information technology -- Process assessment -- Part 5: An exem-
plar software life cycle process assessment model," ed, 2012.
34. J. W. Creswell, Research design: Qualitative, quantitative, and mixed methods approaches:
Sage Publications, Inc, 2009.
35. R. K. Yin, Case study research: Design and methods: Sage publications, 2014.
36. Ö. Özcan-Top, and O. Demirors, "Application of a software agility assessment model–Agi-
lityMod in the field". Computer Standards & Interfaces, 62, 1-16, 2019.
37. SO/IEC, "IS 14143-5 Information Technology – Software Measurement - Functional Size
Measurement - Part 5: Determination of Functional Domains for Use with Functional Size
Measurement," ed, 2004.
38. K. S. Rubin, Essential Scrum: A Practical Guide to the Most Popular Agile Process: Addi-
son-Wesley Professional, 2012.
39. Ö. Özcan Top, "AgilityMod: Software Agility Assessment Reference Model v3.0," Infor-
matics Institute, METU/II-TR-2014-392014.
40. E. Derby, D. Larsen, and K. Schwaber, Agile retrospectives: Making good teams great:
Pragmatic Bookshelf Raleigh, NC, 2006.