        <article-title>Management Teams Based on Building Information Modeling</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>Tetyana Honcharenko</string-name>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Svitlana Tsiutsiura</string-name>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Kateryna Kyivska</string-name>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Olena Balina</string-name>
          <email>elena.i.balina@gmail.com</email>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Iryna</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Bezklubenko</string-name>
          <email>i.bezklubenko@gmail.com</email>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Modeling</string-name>
        </contrib>
        <aff id="aff0">
          <label>0</label>
          <institution>Kyiv National University of Construction and Architecture</institution>
          ,
          <addr-line>31, Povitroflotsky Avenue, Kyiv, 03037</addr-line>
          ,
          <country country="UA">Ukraine</country>
        </aff>
      </contrib-group>
      <volume>000</volume>
      <fpage>0</fpage>
      <lpage>0003</lpage>
      <abstract>
        <p>The study is devoted to transform approaches to the formation of construction project management teams in the context of digitalization of the construction industry. It is necessary more widely use Building implementation of construction Information Proceedings of the 2nd International Workshop IT Project Management (ITPM 2021), February 16-18, 2021, Slavsko, Lviv region, Ukraine</p>
      </abstract>
      <kwd-group>
        <kwd>1</kwd>
        <kwd>Digitalization of the construction industry</kwd>
        <kwd>BIM-management</kwd>
        <kwd>project management team</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>-</title>
      <p>(BIM) technologies in</p>
      <p>the
methods and
approaches used in the
information technology can be the key to the success of a project in construction, while
moving from traditional management methods to innovative approaches with the maximum
use of BIM at all stages of the project lifecycle. A model of the transition of enterprise
business processes to BIM-management is proposed, depending on the stage of the
construction project and the volume of investments in the development of the company. The
study considers models of organizational transformations of the project management system
and the project management team, which are both the "brain" and the main resource that
determines the quality of management, interaction, support and the success of projects. The
object of this article is BIM-management as a technology for increasing the competitiveness
of enterprises in the construction industry. Study of issues related to the use of BIM in
construction, elucidate ion and clarification of the essence of BIM technology with the
determination of the positive and negative aspects of its implementation. The study shows the
dynamics of BIM</p>
      <p>efficiency growth for start-up companies and companies already
entrenched in the construction market.</p>
    </sec>
    <sec id="sec-2">
      <title>1. Introduction</title>
      <p>The construction industry is one of the areas of economic activity that is most fundamentally
subject to transformation due to the general global processes of "digitalization". There is a need to
transform the way the customer works with project information and with the project management
team in connection
with the increasing penetration of Building Information
Modeling (BIM)
technologies into the implementation of construction projects. Therefore, for the effective use of BIM,
there is a need for coordination and unity of methodological support for the activities of not only the
manager, but also the entire project management team. The dominant role of information technology
in the digital transformation of construction activities prompts the feasibility and need to adapt IT to
solving problems and tasks in the construction industry. To improve the efficiency of all stages of the
object's lifecycle, it is necessary to rechange the theoretical and practical aspects of engineering</p>
      <p>
        2021 Copyright for this paper by its authors.
activities for lifecycle contracts based on the theory of simulation and the functional method using
artificial intelligence and BIM technologies [
        <xref ref-type="bibr" rid="ref1">1</xref>
        ]. Based on the results obtained from research, it can be
said that when using BIM technologies, investors have increased confidence in construction projects.
A study by Autodesk [
        <xref ref-type="bibr" rid="ref2">2</xref>
        ] provides the following results:
• technical faults are detected on time, due to this, the cost is reduced by 10%;
• project implementation time is reduced by 7-15%;
• the accuracy of estimated calculations increases by 3%;
• the development of construction estimates can be reduced by almost 80%;
• reduced defects and construction waste by 30%;
• it becomes possible to more accurately assess the effectiveness and targeted spending of
budget funds.
      </p>
      <p>Table 1 shows the results of studies of the BIM implementation, which indicate an improvement in
a number of performance indicators.</p>
      <p>
        The authors of [
        <xref ref-type="bibr" rid="ref3 ref4 ref5 ref6 ref7">3-7</xref>
        ] note such a need for the formation of competitiveness in a strategic
perspective due to increased global competition in the construction services market, acceleration of
innovation and technological development and reindustrialization of the world economy. Construction
engineering is a progressive organizational scheme aimed at increasing the productivity of the
construction industry through project-oriented and scientifically based on methods of organizing
construction production, as well as improving the technology of construction of objects through the
introduction of scientific developments [
        <xref ref-type="bibr" rid="ref8">8</xref>
        ]. Having analyzed the domestic and foreign experience of
enterprises in investment and construction activities [
        <xref ref-type="bibr" rid="ref10 ref11 ref9">9-11</xref>
        ], it can be argued that in the Ukrainian
economy there is a tendency to borrow foreign experience in the implementation of long-term
construction projects by concluding an agreement with one company for the entire range of services:
from project development, construction, operation and subsequent disposal, i.e. throughout the entire
life cycle of an object [12-16]. BIM technology is a modern approach to design, construction and
operation. It allows combining various software products and tools, which allows modeling much
cheaper, simplifies the visualization of the future object [17, 18]. The transition of the industrial and
civil construction industry to a higher level of competitiveness [19] in many countries of the world is
associated with the creation of full-fledged BIM models.
      </p>
      <p>The consulting company "McGraw Hill Construction" [20] conducted a survey among companies
in the construction industry and found out what benefits they received with the introduction of BIM.
Thus, the study showed the following results: 41% of the surveyed companies noted a reduction in the
number of errors after the introduction of the technology. In turn, 35% and 32% drew attention to
improving communication between managers and designers and improving the company's image,
respectively. A complete list of research findings is shown in Fig. 1.</p>
      <p>Nevertheless, despite all of the above, BIM technology, in addition to all the advantages, has
certain disadvantage. Experts identify the following difficulties in implementation:
• retraining from Computer Aided Design (CAD) to BIM software product;
• the interaction of departments when working in BIM technologies takes a long enough time to
get used to;
• high price category for the purchase of the corresponding software products;
• limited BIM managers who are ready to train entire staff and organize the transition to BIM
technologies.</p>
      <p>All these problems put the introduction of BIM technologies in Ukraine into a difficult position. A
key indicator of a company's maturity in using BIM technologies is the level of technological,
organizational and management changes as part of the transition to BIM.</p>
      <p>The purpose of the article is to develop models of organizational transformations of the project
management system and the project management team, which are both the "brain" and the main
resource that determines the quality of management, interaction, support and the success of projects.</p>
    </sec>
    <sec id="sec-3">
      <title>2. Theoretical Studies</title>
      <p>The role of the project manager, the coherence of the project management team and the ability to
generate synergy is further enhanced in the context of digital transformation in construction. Strategic
management of role communication and the interaction of its members play an important role for
team management.</p>
      <p>BIM technologies are constantly evolving. This led to the creation of technologies 4D modeling,
5D modeling, 6D modeling, Product Lifecycle Management, Multi-D modeling ‒ PLM and other
similar technologies. They help to intensify innovation processes and act as a basic condition for the
development of enterprises in the construction industry. BIM is not perfect, it doesn't work
automatically, and it doesn't replace humans. Moreover, BIM technology requires a lot of
professionalism and a comprehensive understanding of the process from the participant in the
construction process. But at the same time, BIM brings a creative component to work, makes human
work more efficient.</p>
      <p>Obtaining a reliable cost estimate for the implementation of the project implementation of
BIMtechnologies is possible through a systematic analysis[21–30] of the three areas of investment. Only
after such an analysis is the feasibility of determining the effectiveness of the company's transition to
information modeling technology.</p>
      <p>A complex computer model that describes object and construction process is the result of BIM
modeling. This simulation brings together all information into a single database. This allows getting
up-to-date project documentation and visualization.</p>
      <p>BIM is not perfect, it doesn't work automatically, and it doesn't replace humans. Moreover, BIM
technology requires a lot of professionalism and a comprehensive understanding of the process from
the participant in the construction process. But at the same time, BIM brings a creative component to
work, makes human work more efficient. Based on the considered conditions of effective introduction
of BIM-technologies in activity of the enterprise, it is possible to allocate tree basic management
tools:
1. reengineering of business processes and management system;
2. transformation of the organizational structure in terms of staff composition and qualifications;
3. formation of supporting infrastructure.</p>
      <p>The transition to information modeling technologies is a set of interconnected processes, and
investments in the project of implementation of BIM-technologies are formed from a set of
investments in all three areas, presented in Fig. 2.</p>
      <p>The model of transitional business processes of the enterprise to BIM management depending on a
stage of development of the company is offered to be de-scribed by the following functional equation:
where is total income, is current costs without using BIM-management, is
current costs when using BIM-management, is investment costs incurred for the implementation
of BIM-technology, T is period of time during which it is expected to recoup investment costs in
BIM-technologies.</p>
      <p>The decision on the feasibility of transition to BIM-technologies at each stage of the construction
project (see Fig. 2) must be made by comparing current costs with the investment costs of
implementing new technologies. If the left part of equation (1) is over than the right part, then the
investment in the introduction of BIM-technologies is justified and the company can make the
transition to a new level of management:
(1)</p>
      <p>If the costs of implementing BIM-technologies exceed the current costs at this stage of the
construction project, the company refuses to switch to BIM management:</p>
      <p>Each level of maturity of BIM-processes represents potential goals of the company. Thus, there are
n levels of maturity. Fig. 3 visualizes the performance of the transition to the next levels of maturity
BIM. In this case, CAD-technologies occupy the level i (i ∈ [A; B]). The transition from one
technological level to another is an economic-technological leap (step) is m.
(3)
(4)
(5)
(6)
where is the company's revenue at 1 level of maturity of BIM-processes; is income of the
company on 2 levels of maturity of BIM-processes; is the company's revenue at 3 levels of
maturity of BIM-processes; is investment to move to level 1 maturity of BIM-processes; is
investments for transition to level 2 maturity of BIM-processes; is investment to move to level 3
maturity of BIM-processes; m is economic and technological step; =
is the coefficient of increase;</p>
      <p>In the left part of each of the obtained equations (6) are the values of the potential for the
development of BIM-processes, in the right part of the investment for the transition from one level of
BIM-processes to another. With insufficient potential for the development of BIM-processes, the
spread of new technologies stops, which indicates the impossibility of transition to a new level of
BIM-processes.</p>
      <p>The efficiency of BIM-technologies gradually increases with the transition from i to n level, which
is equivalent to reducing the specific production costs of each subsequent level of maturity of
BIMprocesses. At transition from one level of maturity of BIM-processes to the subsequent there is an
increase in price of IT therefore we will enter coefficient of increase in price k &gt; 0 and we will receive
expenses for transition from one level of maturity of BIM-processes:</p>
      <p>In this case, the economic and technological equilibrium for each transition has the form:
Estimation of economic and technological step at m = l-i = r-l = n-r has the form:</p>
      <p>Thus, the logical condition of transition from one BIM-level to another is established, which is
presented in Fig. 4. and is described by the following inequalities:</p>
      <p>where , , are development potentials of BIM-processes, respectively,
at l, r, n levels; , , are appropriate investments for the
transition from one level of maturity of BIM-processes to another; k-cost reduction factor at each
subsequent level of development of BIM-technologies (k &gt; 0).</p>
      <p>There are two strategies of economic and technological transformation: sequential transition and
abrupt transition. Analysis of functional dependence in Fig. 4 shows that as the BIM development
potential increases, the line approaches the vertical axis of Investment (I), therefore, the
critical value m 'decreases.
(7)</p>
      <sec id="sec-3-1">
        <title>BIM process levels</title>
        <p>Thus, the high potential of information modeling technologies contributes to a more smooth
transition from one level of maturity to another, which indicates a high rate of economic growth and a
large scale of production, which contributes to a more even transition to a new economic and
technological level. Therefore, the first strategy of consistent transition of economic and technological
transformations is more acceptable.</p>
        <p>The minimum economic and technological step m', which will be economically feasible, is
determined by the ratio:</p>
        <p>The proposed model of choosing the strategy of transition to BIM and further technological
development is an evidence base for choosing the best way of technological transformation in the
company based on the analysis of planned costs, production volumes in the implementation of
innovative and technological potential of the company. This model makes it possible to estimate the
minimum economically justified technological step that the company must withstand to move to the
next level of maturity of BIM-processes.</p>
        <p>Fig. 5 presents a scheme of the formation of a team of BIM specialists to manage construction
projects at different stages of the lifecycle.</p>
        <p>The BIM-manager should appear at the beginning of the process of implementing information
modeling technologies. At the initial levels of maturity of BIM-processes in the company, the
manager is actively involved in the development of work processes, standards and templates of the
company. In the future, supports the information model, maintains it up to date, as well as forms
training programs and training of employees.</p>
        <p>It is recommended to connect BIM-masters during the design process using information modeling
technologies. The key task of the BIM-master is the technical support of the information model from
the creation of means of entering information into the general data environment to the implementation
of expert support for users of BIM-content.</p>
        <p>The BIM-coordinator is responsible for ensuring the integrity of the information model by
integrating the results of the work of specialists in related specialties according to the approved rules
and standards of the company.</p>
        <p>It is necessary to transfer all specialists of the organization to the new technology to achieve the
maximum effect from the transition to information modeling technology of the company.
Modernization and improvement of existing tools in the company must already be performed. At this
stage, it is necessary to replace the existing approach to solving the company's problems to innovative
through training. It is important to keep in mind that the reduction of labour productivity in the early
stages is an inevitable phenomenon (see Fig. 6), which with effective management of learning
processes will be replaced by growth. Thus, the choice of educational technologies is one of the
determining factors influencing the effectiveness of the transition to BIM-management.</p>
        <p>In fact, it is necessary to rethink the usual stages of project implementation in connection with the
massive digitalization of activities in the construction industry. In particular, the "design" stage,
usually ending with the receipt of project documentation in different countries of different
composition and depth of detail in changing conditions, will most likely end with the creation of a
"digital twin" of the future real estate object, which has been checked for collisions and other
inconsistencies, supported by the appropriate library digital elements necessary for the
implementation of the project, containing complete information about all kinds of building materials,
structures and engineering equipment. It is this prototype of the construction site that is the digital
information BIM model. At the same time, a digital model of a construction object can really include
all the comprehensive information necessary not only for construction, but also for operation,
modernization, reconstruction and subsequent liquidation of the object.</p>
      </sec>
    </sec>
    <sec id="sec-4">
      <title>3. Organizational transformations in the project management system based on Building Information Modeling</title>
      <p>The emergence of new and the transformation of old responsibilities is inevitable when a
construction company switches to BIM-management.</p>
      <p>Fig. 7 presents a model of organizational transformations in the project management system, when
BIM technologies are introduced in construction projects. Recommendations for project managers on
monitoring the implementation of the project are developed using BIM logic in connection with the
active development of the use of information technologies and information about an object throughout
the entire life cycle through the use of BIM models.</p>
      <sec id="sec-4-1">
        <title>Investor Customer Technical customer</title>
      </sec>
      <sec id="sec-4-2">
        <title>Leadership</title>
        <sec id="sec-4-2-1">
          <title>Project</title>
          <p>organization</p>
        </sec>
        <sec id="sec-4-2-2">
          <title>General designer</title>
        </sec>
        <sec id="sec-4-2-3">
          <title>Leadership</title>
        </sec>
      </sec>
      <sec id="sec-4-3">
        <title>Building company General contractor</title>
      </sec>
      <sec id="sec-4-4">
        <title>Leadership</title>
      </sec>
      <sec id="sec-4-5">
        <title>Manager</title>
        <p>BIMmanager</p>
      </sec>
      <sec id="sec-4-6">
        <title>Chief Project Engineer</title>
        <p>BIMmanager</p>
        <p>BIMmanager</p>
      </sec>
      <sec id="sec-4-7">
        <title>Project manager BIMauthor</title>
        <p>BIM
coordinator</p>
        <p>BIMmodeler
information model. This specialist does not solve any engineering problems. It should be noted that
these functions can be performed by both the BIM-author and the BIM-coordinator in parallel with
the main responsibilities.</p>
        <p>BIM- author.</p>
        <p>This specialist develops the project, maintains the model, and provides technical coordination.
This specialist carries out design duties with BIM-software and supports the BIM-concept. The
qualifications of a BIM-author in working with software have to correspond to his engineering
position and the complexity of the design work entrusted to him. The minimum qualification
threshold for a BIM author is basic knowledge of the software in which he will work an
understanding of the principles of collaboration and knowledge of the BIM standard.</p>
        <p>BIM-coordinator.</p>
        <p>This specialist develops the BIM Execution Plan, conducts regular audits of the information model
and checks it for collisions. This is the person responsible for the information modeling process in the
BIM project. BIM coordinator in its pure form does not accept or agree on design decisions.</p>
        <sec id="sec-4-7-1">
          <title>Management</title>
        </sec>
        <sec id="sec-4-7-2">
          <title>BIM-manager</title>
          <p>Objectives
Analysis
Processes</p>
          <p>Standards
Implementation</p>
        </sec>
        <sec id="sec-4-7-3">
          <title>Coordination</title>
        </sec>
        <sec id="sec-4-7-4">
          <title>BIM-сoordinator</title>
        </sec>
      </sec>
      <sec id="sec-4-8">
        <title>Model check</title>
        <p>Сoordination</p>
      </sec>
      <sec id="sec-4-9">
        <title>Content creation</title>
        <sec id="sec-4-9-1">
          <title>Design</title>
        </sec>
        <sec id="sec-4-9-2">
          <title>Development</title>
        </sec>
        <sec id="sec-4-9-3">
          <title>BIM-author</title>
        </sec>
      </sec>
      <sec id="sec-4-10">
        <title>Model creation</title>
      </sec>
      <sec id="sec-4-11">
        <title>Creation of drawings</title>
        <sec id="sec-4-11-1">
          <title>BIM-modeler</title>
          <p>BIM-manager.</p>
          <p>This specialist is engaged in the development of a BIM-process management strategy, internal
regulations, training methods, BIM Execution Plan and audit the information model. If the
BIMauthor and BIM-coordinator are inherent only in design organizations, then the BIM-manager should
also be in the service of the technical customer and in the construction general contractor. The duties
of a BIM-manager in a design organization differ from those of a BIM-manager in the customer
service and a BIM-manager in a construction general contractor. BIM-manager in a design
organization performs the following main duties and functions:
• development of a strategy for creating a BIM-model and internal rules for working with a
BIM-model, preparing a file for collaboration;
• development of modeling and design standards, unification of various elements for working
with the model;
• organization of storage of related files and source data files;
• managing the creation of required library items model management, administration and
verification of information in the model;
• coordination of the work of specialists;
• training employees to work with the program, consulting at all stages of work;
• distribution of tasks and changing roles between project participants exchange of experience
with other specialists in the organization;
• study and implementation of new BIM-programs and BIM-applications that help in the work
on the project.</p>
          <p>The main task of the BIM-manager in the project team is the information technology management
of the creation of the BIM-model and the coordination of the actions of all participants in the project
BIM-process.</p>
        </sec>
      </sec>
    </sec>
    <sec id="sec-5">
      <title>4. Conclusion</title>
      <p>The article discusses the need to transform approaches to the formation of construction project
management teams in the context of digitalization of the construction industry based on the use of
BIM technologies.</p>
      <p>The results of work present two models of organizational transformations of the project
BIMmanagement system and the project BIM- management team, which are both the "brain" and the main
resource that determines the quality of management, interaction, support and the success of projects.</p>
      <p>It is necessary to revise the existing approaches to the formation of management teams for such
projects for the effective implementation of modern mixed, hybrid projects at the intersection of
information technologies, technologies for organizing construction production and the production of
building materials and structures. Implementation of BIM technology in construction projects is
impossible without BIM-manager.</p>
    </sec>
    <sec id="sec-6">
      <title>5. References</title>
      <p>[12] S. Aewunruen, J. Sresakoolchai, Z. Zhou: Sustainability-Based Lifecycle Management for</p>
      <p>Bridge Infrastructure Using 6D BIM. Sustainability,12, 24-36 (2020).
[13] M. Pepe, D. Costantino, A. Restuccia Garofalo: An Efficient Pipeline to Obtain 3D Model for</p>
      <p>HBIM and Structural Analysis Purposes from 3D Point Clouds. Appl. Sci.,10, 12-35 (2020).
[14] C. Hu, S. Zhang: Study on BIM technology application in the whole life cycle of the utility
tunnel. Smart Innov. Syst. Technol, 127, 277–285 (2019).
[15] J. C. P. Cheng, Q. Lu, Y. Deng: Analytical review and evaluation of civil information modeling.</p>
      <p>Autom. Constr., 67, 31–47 (2016).
[16] M. Gerges, S. Austin, M. Mayouf, O. Ahiakwo, M. Jaeger, A. Saad, T. El Gohary: An
investigation into the implementation of building information modeling in the Middle East.J. Inf.</p>
      <p>Technol. Const., 22, 1–15 (2017).
[17] D. Ryzhakov, O. Dikiy, M. Druzhynin, H. Petrenko, T. Savchuk: Innovative tools for
management the lifecycle of strategic objectives of the enterprise-stakeholder in construction.
International Journal on Emerging Trends in Engineering Research, 8(8), 4526-4532 (2020).
https://doi.org/10.30534/ijeter/2020/7888202018.
[18] D. Chernyshev, D. Ryzhakov, O. Dikiy, O. Khomenko, S. Petrukha: Innovative Technology for
Management Tools of Commercial Real Estate in Construction. International Journal on
Emerging Trends in Engineering Research, 8(9), 4967-4973 (2020).
[19] M. Dyomin, A. Dmytrenko, D. Chernyshev, O. Ivashko: Big Cities Industrial Territories
Revitalization Problems and Ways of Their Solution. Lecture Notes in Civil Engineering, 73,
365-373 (2020).
[20] The Business Value of BIM for Construction in Major Global Markets Icn-solutions. Retrieved
from https://www.icn-solutions.nl/pdf/bim_construction.pdf
[21] M. Odrekhivskyy, V. Pasichnyk, A. Rzheuskyi, V. Andrunyk, M. Nazaruk, O. Kunanets, D.</p>
      <p>Tabachyshyn, Problems of the intelligent virtual learning environment development. CEUR
Workshop Proceedings 2386 (2019) 359–369.
[22] V. Tomashevskyi, A. Yatsyshyn, V. Pasichnyk, N. Kunanets, A. Rzheuskyi, Data Warhouses of
Hybrid Type: Features of Construction. Advances in Intelligent Systems and Computing book
series 938 (2019) 325–334.
[23] R. Kaminskyi, N. Kunanets, V. Pasichnyk, A. Rzheuskyi, A. Khudyi, Recovery gaps in
experimental data. CEUR Workshop Proceedings 2136 (2018) 108–118.
[24] A. Rzheuskyi, H. Matsuik, N. Veretennikova, R. Vaskiv, Selective Dissemination of Information
– Technology of Information Support of Scientific Research. Advances in Intelligent Systems
and Computing 871 (2019) 235–245.
[25] R. Kaminskyi, N. Kunanets, A. Rzheuskyi, A. Khudyi, Methods of statistical research for
information managers, in: Proceedings of the 13th International Scientific and Technical
Conference on Computer Sciences and Information Technologies, CSIT 2018, 2018, pp. 127–
131.
[26] А. Kazarian, N. Kunanets, R. Holoshchuk, V. Pasichnik, A. Rzheuskyi, Information Support of
the Virtual Research Community Activities Based on Cloud Computing, in: Proceedings of the
13th International Scientific and Technical Conference on Computer Sciences and Information
Technologies, CSIT 2018, 2018, pp. 199–202.
[27] A. Rzheuskiy, N. Veretennikova, N. Kunanets, V. Kut, The information support of virtual
research teams by means of cloud managers. International Journal of Intelligent Systems and
Applications 10(2) (2018) 37–46.
[28] V. Pasichnyk, D. Tabachyshyn, N. Kunanets, A. Rzheuskyi, Visualization of Expert Evaluations
of the Smartness of Sociopolises with the Help of Radar Charts. Advances in Intelligent Systems
and Computing 938 (2020) 126–141.
[29] V. Pasichnyk, N. Kunanets, N. Veretennikova, A. Rzheuskyi, M. Nazaruk, Simulation of the
Social Communication System in Projects of Smart Cities, in: Proceedings of the 14th
International Scientific and Technical Conference on Computer Sciences and Information
Technologies, CSIT 2019, 2019, pp. 94–98.
[30] H. Lypak, V. Lytvyn, O. Lozynska, R. Vovnyanka, Y. Bolyubash, A. Rzheuskyi, D. Dosyn,
Formation of Efficient Pipeline Operation Procedures Based on Ontological Approach. Advances
in Intelligent Systems and Computing 871 (2019) 571–581.</p>
    </sec>
  </body>
  <back>
    <ref-list>
      <ref id="ref1">
        <mixed-citation>
          [1]
          <string-name>
            <given-names>R.</given-names>
            <surname>Sacks</surname>
          </string-name>
          ,
          <string-name>
            <given-names>C.</given-names>
            <surname>Eastman</surname>
          </string-name>
          ,
          <string-name>
            <given-names>G.</given-names>
            <surname>Lee</surname>
          </string-name>
          ,
          <string-name>
            <surname>P.</surname>
          </string-name>
          <article-title>Teicholz: BIM Handbook: A Guide to Building Information Modeling for Owners, Designers</article-title>
          , Engineers, Contractors, and
          <string-name>
            <given-names>Facility</given-names>
            <surname>Managers</surname>
          </string-name>
          . 3rd ed. John Wiley &amp; Sons: Hoboken,
          <string-name>
            <surname>NJ</surname>
          </string-name>
          , USA p.
          <volume>688</volume>
          , (
          <year>2018</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref2">
        <mixed-citation>
          <article-title>[2] Information modeling of industrial and civil construction objects</article-title>
          .
          <source>Autodesk [Electronic resource]</source>
          . URL: https://damassets.autodesk.net/content/dam/autodesk/www/campaigns/ BTTRU/BIM%20for%20buildings_Autodesk.pdf
        </mixed-citation>
      </ref>
      <ref id="ref3">
        <mixed-citation>
          [3]
          <string-name>
            <given-names>S.</given-names>
            <surname>Bushuyev</surname>
          </string-name>
          ,
          <string-name>
            <given-names>B.</given-names>
            <surname>Kozyr</surname>
          </string-name>
          ,
          <string-name>
            <surname>N.</surname>
          </string-name>
          <article-title>Rusan: Modeling of Empathy, Emotional Intelligence and Transformational Leadership to the Project Success</article-title>
          .
          <source>Mathematical Modeling and Simulation of Systems. Selected Papers of 14th International Scientific-Practical Conference, MODS, June</source>
          <volume>24</volume>
          - 26, Chernihiv, Ukraine.
          <source>Springer Nature Switzerland AG</source>
          , Vol.
          <volume>1019</volume>
          ,
          <fpage>209</fpage>
          -
          <lpage>223</lpage>
          (
          <year>2019</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref4">
        <mixed-citation>
          [4]
          <string-name>
            <given-names>R.</given-names>
            <surname>Trach</surname>
          </string-name>
          ,
          <string-name>
            <surname>S.</surname>
          </string-name>
          <article-title>Bushuyev: Analysis of communication network of the construction project participants</article-title>
          .
          <source>Scientific Review Engineering and Environmental Sciences</source>
          ,
          <volume>29</volume>
          (
          <issue>3</issue>
          ),
          <fpage>388</fpage>
          -
          <lpage>396</lpage>
          (
          <year>2020</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref5">
        <mixed-citation>
          [5]
          <string-name>
            <given-names>A.</given-names>
            <surname>Voitushenko</surname>
          </string-name>
          ,
          <string-name>
            <surname>S.</surname>
          </string-name>
          <article-title>Bushuyev: Development of project managers' creative potential: Determination of components and results of research</article-title>
          .
          <source>Advances in Intelligent Systems and Computing</source>
          ,
          <volume>1080</volume>
          AISC,
          <fpage>283</fpage>
          -
          <lpage>292</lpage>
          (
          <year>2020</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref6">
        <mixed-citation>
          [6]
          <string-name>
            <given-names>M.</given-names>
            <surname>Shkuro</surname>
          </string-name>
          ,
          <string-name>
            <surname>S.</surname>
          </string-name>
          <article-title>Bushuyev: Development of proactive method of communications for projects of ensuring the energy efficiency of municipal infrastructure</article-title>
          ,
          <source>EUREKA, Physics and Engineering</source>
          ,
          <volume>1</volume>
          ,
          <fpage>3</fpage>
          -
          <lpage>12</lpage>
          (
          <year>2019</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref7">
        <mixed-citation>
          [7]
          <string-name>
            <given-names>T.</given-names>
            <surname>Honcharenko</surname>
          </string-name>
          ,
          <string-name>
            <given-names>Y.</given-names>
            <surname>Chupryna</surname>
          </string-name>
          , I. Ivakhnenko,
          <string-name>
            <given-names>M.</given-names>
            <surname>Zinchenco</surname>
          </string-name>
          , T. Tsyfra:
          <article-title>Reengineering of the Construction Companies Based on BIM-technology</article-title>
          .
          <source>International Journal of Emerging Trends in Engineering Research</source>
          <volume>9</volume>
          (
          <issue>5</issue>
          ),
          <fpage>8670</fpage>
          -
          <lpage>8676</lpage>
          (
          <year>2020</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref8">
        <mixed-citation>
          [8]
          <string-name>
            <given-names>P.</given-names>
            <surname>Kulikov</surname>
          </string-name>
          , G. Ryzhakova,
          <string-name>
            <given-names>T.</given-names>
            <surname>Honcharenko</surname>
          </string-name>
          ,
          <string-name>
            <given-names>D.</given-names>
            <surname>Ryzhakov</surname>
          </string-name>
          ,
          <string-name>
            <surname>O.</surname>
          </string-name>
          <article-title>Malykhina: OLAP-Tools for the Formation of Connected and Diversified Production and Project Management Systems</article-title>
          .
          <source>International Journal of Advanced Trends in Computer Science and Engineering</source>
          ,
          <volume>8</volume>
          (
          <issue>10</issue>
          ),
          <fpage>7337</fpage>
          -
          <lpage>7343</lpage>
          (
          <year>2020</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref9">
        <mixed-citation>
          [9]
          <string-name>
            <given-names>V.</given-names>
            <surname>Mihaylenko</surname>
          </string-name>
          ,
          <string-name>
            <given-names>T.</given-names>
            <surname>Honcharenko</surname>
          </string-name>
          ,
          <string-name>
            <given-names>K.</given-names>
            <surname>Chupryna</surname>
          </string-name>
          , Yu. Andrashko,
          <string-name>
            <surname>S.</surname>
          </string-name>
          <article-title>Budnik: Modeling of Spatial Data on the Construction Site Based on Multidimensional Information Objects</article-title>
          .
          <source>International Journal of Engineering and Advanced Technology</source>
          ,
          <volume>8</volume>
          (
          <issue>6</issue>
          ),
          <fpage>3934</fpage>
          -
          <lpage>3940</lpage>
          (
          <year>2019</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref10">
        <mixed-citation>
          [10]
          <string-name>
            <given-names>O.</given-names>
            <surname>Terentyev</surname>
          </string-name>
          ,
          <string-name>
            <given-names>S.</given-names>
            <surname>Tsiutsiura</surname>
          </string-name>
          ,
          <string-name>
            <given-names>T.</given-names>
            <surname>Honcharenko</surname>
          </string-name>
          , T. Lyashchenko:
          <article-title>Multidimensional Space Structure for Adaptable Data Model</article-title>
          .
          <source>International Journal of Recent Technology and Engineering</source>
          ,
          <volume>8</volume>
          (
          <issue>3</issue>
          ),
          <fpage>7753</fpage>
          -
          <lpage>7758</lpage>
          (
          <year>2019</year>
          ).
        </mixed-citation>
      </ref>
      <ref id="ref11">
        <mixed-citation>
          [11]
          <string-name>
            <given-names>S.</given-names>
            <surname>Azhar</surname>
          </string-name>
          :
          <article-title>Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry</article-title>
          . Leadersh. Manag. Eng.,