        <article-title>Information System for Sewing Enterprise</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>Nataliia Kunanets</string-name>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Anna Synko</string-name>
          <email>anna.i.synko@lpnu.com</email>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Nataliia Veretennikova</string-name>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <aff id="aff0">
          <label>0</label>
          <institution>Lviv Polytechnic National University</institution>
          ,
          <addr-line>S. Bandery str., 12 , Lviv, 79000</addr-line>
          ,
          <country country="UA">Ukraine</country>
        </aff>
      </contrib-group>
      <volume>000</volume>
      <fpage>0</fpage>
      <lpage>0002</lpage>
      <abstract>
        <p>The implementation of the project on construction of a rational model of the automated information system of complex accounting at the enterprise is described. The requirements to the project of information system and the analysis of the system functionality are given. The development of an automated information system of enterprise management is considered as a scientific project that has a certain life cycle, which is implemented in such phases as preinvestment, investment and operational. The main issues that need to be considered when developing an automated enterprise management system are outlined. Having analyzed the object-oriented methodology, the of the environment are separated, the actors, options for use and the relationship between them are identified. Project life cycle, business plan, Gantt chart, automated information system, critical path, human resources, material resources, project participants, sewing enterprise.</p>
      </abstract>
      <kwd-group>
        <kwd>system</kwd>
        <kwd>using</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>1. Introduction</title>
      <p>The word of project is very often used in our lives. There is development of means to fight AIDS,
conservation of the Chornobyl NPS, election campaign, renting and repairing a new office, etc. All
these tasks have several common features that characterize them as projects. These features include a
focus on achieving the goal; the presence of numerical hierarchical goals; coordinated implementation
of related actions; project time frame; availability of budget; uniqueness.</p>
      <p>It is the project that allows us to properly plan and quickly manage the implementation of tasks.
The aim of the project is to create something new, non-existent at this moment. As a result of the
project, a new product appears as an enterprise, a product, a production line, service. The concept of
project covers a wide range of activities from minor modernization of the existing facility to the
creation of an enterprise in a complex with the developed infrastructure that requires significant
investment.</p>
      <p>Project management is one of the most complex and time-consuming areas due to the large amount
of information used for management decisions, as well as the fact that the structure of the project in
the process of its implementation is changing.</p>
      <p>Effective project</p>
      <p>management is impossible without the use of modern information and
communication technologies and appropriate tools.</p>
    </sec>
    <sec id="sec-2">
      <title>2. Analysis of recent research and publications</title>
      <p>The paper [1] analyzes the content of the concept of project and project management; the main
components of the project are given; the life cycle of the project in the form of phases is described
(design, implementation, and operation), which have a certain set of works (processes) that need to be
implemented as well as the main functions for effective project management are mentioned.</p>
      <p>2021 Copyright for this paper by its authors.</p>
      <p>The main theoretical and conceptual principles and practical examples of strategic management
were studied by Tony Morden [2], Wyn Jenkins and David Williamson [3]. The use of information
technology in project management of the enterprise was researched by Michael S. Zambruski [4]. The
issues of organization management are studied by Hal G. Rainey [5], K. Schwalbe [6].</p>
      <p>Data flow diagram (DFD) is one of the main tools for structural analysis and design of information
systems. They are used for graphical structural analysis, which describes external sources to the
system and data recipients, logical functions, data flows and data warehouses to which access is made.
IDEF0 notation, based on SADT methodology, is most often used to describe business processes.</p>
      <p>Scientific works of many domestic and foreign scientists are devoted to business process
modeling, in particular works by John Jeston [7], J. Pinggera, P. Soffer, S. Zugal, B. Weber, M.
Weidlich, D. Fahland, H.A. Reijers, J. Mendling [8], J. Cardoso [9], H. Gould [10] and others.</p>
      <p>One of the methods of project planning is the Gantt chart, which is used to illustrate the plan, the
work schedule for any project. The method of planning the activities of the enterprise using the Gantt
chart was investigated by such scientists as J. Geraldi [11], A. Sharon [12], Olivier and Cristina
Rebière [13].</p>
      <p>A significant contribution to the study of life cycles of related fields of knowledge was made by
J. Westland [14], Massimo Pica [15].</p>
    </sec>
    <sec id="sec-3">
      <title>3. Project proposals for the formation of the information system</title>
      <p>It is known that a lot of industries today do not have partial or full automated work. Therefore,
employees of such enterprises are forced to perform some routine operations that could be done with
computers. Thanks to new information technologies, it is possible to automate management
operations, as well as to obtain information for decision-making and analytics in enterprise
management.</p>
      <p>The purpose of this paper is to create and implement a project to build a rational model of an
automated information system of integrated accounting of material resources, production costs, sales
of finished products of light industry, building an effective business management model using
intelligent systems and technologies.</p>
      <p>This task can be considered in terms of a research project, which contains a set of purposeful,
consistent actions aimed at achieving the result with limited resources and timing of their beginning
and end. A project is a certain enterprise with established goals, the achievement of which determines
the completion of the project [15].</p>
      <p>Each project has its own life cycle that is the period from the conception of the project (idea) to its
completion (liquidation of the project). The project life cycle is defined as a set of consecutive phases
of the project, their names and numbers are determined by the control needs of the organization or
organizations involved in the project [16].</p>
      <p>The following phases of the project were used to solve this goal:</p>
      <p>Pre-investment phase includes identification that is a problem definition and proposal for its
solution, preparation and evaluation of a business plan, especially an identification of investment
opportunities, analysis of alternatives and preliminary project selection, namely preliminary feasibility
study, analysis of analogue projects (if any), definition of time, resource (human), financial costs of
the project, assessment of risks and viability of the project, selection and preliminary approval of
equipment and its location (s), expertise, negotiations on the development of an automated system.</p>
      <p>Investment phase includes establishing the legal, financial, and organizational basis for the project,
detailed design and contracting, development of the most automated system and its testing, tenders for
equipment supply, purchase and installation of equipment and programs, data filling system,
preproduction marketing, staff training, commissioning, and launching.</p>
      <p>Operation phase:
• in the short term, it is studied the possible occurrence of problems related to the use, operation
of equipment or staff qualifications;
• in the long term, it is considered the chosen strategy and the total cost of production and
marketing, as well as saving time and resources during operation, which automatically leads to an
increase in profits from the manufacture of goods. This phase also includes the following works as
testing of equipment, debugging programs, correction of errors and inaccuracies in the work,
closing the contract, analysis of results, development, and improvement of certain functions of the
automated accounting system at the enterprise.</p>
      <p>The point of the project is to produce a new and unique product for the company [16].
The process of managing this project can be considered as a set of some functions:
1. Subject area management. The subject area of the project (project goals, objectives, and
work) in the process of its life undergoes changes, so there is a need to manage the subject area of
the project.
2. Quality management. There are clearly defined and established requirements or standards of
quality of results, using which it is possible to assess the degree of success of the implemented
automated information system or the developed project. Defining these requirements, their control
and support during all phases of the project is the essence of the quality management function.
3. Time management. It means keeping time limits, control of project development and in case
of deviation from the plan, the appropriate measures for their elimination should be applied. To
prevent undesirable deviations, it is necessary to predict the project development process.
4. Cost management. It is necessary to keep the established, planned budget according to the
plan [17].</p>
      <p>Effective project management is impossible without the use of modern information technologies.
At each stage of the project life cycle, the goals of automation will be different. During the
preinvestment phase these is search for sponsors, ensuring effective interaction with the customer,
reducing development time, concluding key documents, calculation of risks, etc. During the
investment phase these are the choice of performers, staff, equipment, suppliers, etc. At the design
stage it is to reduce the time of development of the project implementation schedule [18]. At the
implementation stage it is to increase the reliability and efficiency of information about the status of
the project to solve operational management tasks; to reduce time for preparation of documents,
reports on the progress of the project; to ensure effective interaction between project participants. At
the stage of delivery and completion of the project it is observed checking the efficiency of the
equipment, and the formation of working documentation [19-26].</p>
      <p>In practice of project management, it is used both universal and specialized tools or programs
(software packages).</p>
      <p>Universal software packages include spreadsheet, word processor, database management systems
(DBMS), presentation programs (e.g., PowerPoint) and communication programs (e.g., Skype, Zoom,
MS Teams, etc.).</p>
      <p>Specialized programs are the tools that are specifically designed to manage the project at different
stages. For example, during the concept phase, the software package ProjectExpert can be used,
during the system design it can be ERWin package, if it is preparation and implementation, MS
Project is proposed.</p>
      <p>The MS Project software package is most often used for the implementation of small and
mediumsized projects due to the wide capabilities of the package, and user-friendly interface. The program
provides an opportunity to structure the project by dividing it into stages, tasks, and subtasks, to
identify critical tasks, to obtain a schedule of project implementation, to allocate resources to project
tasks, as well as to effectively control the load of resources.</p>
      <p>The development of a project to create an automated information accounting system was
implemented using the MS Project environment using the Gantt chart, which is one of the methods of
project planning. All tasks performed during the project life cycle are presented in Fig.1.</p>
      <sec id="sec-3-1">
        <title>Basic budget</title>
      </sec>
      <sec id="sec-3-2">
        <title>Reserve for unknown risks</title>
      </sec>
      <sec id="sec-3-3">
        <title>Reserve for</title>
        <p>known risks</p>
      </sec>
      <sec id="sec-3-4">
        <title>Distributed budget</title>
      </sec>
      <sec id="sec-3-5">
        <title>Undistributed budget</title>
      </sec>
      <sec id="sec-3-6">
        <title>Expense items</title>
      </sec>
      <sec id="sec-3-7">
        <title>Works</title>
        <p>• visualization of the task and all stages of the project;
• assistance in identifying critical points;
• optimization of planning and distribution of tasks;
• the ability to quickly update with software and applications;
• the ability to build even on plain paper or in Excel, etc.</p>
        <p>Management functions of this project are:
• forecasting and planning of project activities;
• organization of work;
• coordination and regulation of project development and implementation processes;
• activation and stimulation of work of executors, developers;
• accounting, control and analysis of the progress of project development and implementation
(regular meetings, inspections such as monitoring of project implementation).</p>
        <p>Also, it should be emphasized that during the development of the project there is an important
justification, which is presented in the business plan [7]. After all, it provides a detailed description of
the goals and objectives that need to be solved, as well as their ways to achieve. A business plan
provides an opportunity to determine the viability of the project in conditions of fierce competition;
describes possible risks of the project; contains a reference point for the development of the
enterprise; is an important tool for obtaining financial support from external investors, auctioneers,
etc. [8].</p>
        <p>Although the development of this project is done by a business analyst and an enterprise analyst,
who make a significant contribution to its conclusion and formation, but it is primarily intended for
the following categories of participants as directors or owners; investors or ordinary banks for which
it is a mandatory document.</p>
        <p>The content of the business plan and the degree of its detailization usually depend on the size of
the future project and the scope to which it relates; the size of the market (demand); the presence of
competitors and their number.</p>
        <p>There are different standards of business planning [7]. The most famous are the UNIDO standard
(United Nations Industrial Development Organization); KPMG standart (Klynveld Kraayenhof &amp; Co.,
William Barclay Peat &amp; Co., Marwick, Mitchell &amp; Co., Treuhand-Gesellschaft); TACIS standard
(Technical Assistance for the Commonwealth of Independent States); EBRD standard (European
Bank for Reconstruction and Development).</p>
        <p>The automated information system itself, to which the project was developed, needs to solve the
following issues:
• analysis of product demand in the market;
• study of the system of indicators of accounting for production costs and sales at industrial
enterprises in order to organize automated information accounting;
• examination of disadvantages and problems in the organization of the system of accounting
for production costs and the organization of the sales process of finished products at the enterprise;
• development of a database of potential buyers for further communication with them;
• substantiation of the use of information technology for analysis and management decisions in
commercial activities;
• analysis of the use of information systems and technologies in order to study the needs of the
buyer and the organization of production of goods;
• creating a database of manufactured products to calculate the cost of their production;
• development of personal electronic accounts to obtain the necessary information by
employees in accordance with their work at the enterprise.</p>
        <p>The object of the study is the organizational and economic process of automation of cost
accounting and sales of finished products at industrial enterprises to ensure its effective management
in modern conditions of high competition using information technology and systems.</p>
        <p>The subject of the study is a set of methodological, practical, and theoretical aspects of
automation of the process of managing the commercial activities of light industry, which provide a
rational structure and create competitiveness in the market.</p>
        <p>Customer</p>
        <p>View the
product catalog</p>
        <p>&lt;&lt;extend&gt;&gt; Making an order
Creating a database
of goods and prices &lt;&lt;include&gt;&gt;</p>
        <p>The work of the automated information accounting system at the sewing enterprise, for which the
project was developed, can be represented by a use case diagram, which is designed to build a
conceptual model of how the system works in the environment.</p>
        <p>The main purpose of the system is to automate the input and storage of reporting data on the
receipt of orders and their processing, scheduling and workload of employees. The system allows you
to change, supplement and view information about the work of the enterprise, impose restrictions on
access to the system, save orders that have already been processed.</p>
        <p>The selected system contains the following main functions:
1. Obtaining and processing the order.</p>
        <p>This function is designed to receive and process information about the execution of the order. It
describes how the order arrives at the enterprise and stores information about it and the customer as
well as the characteristics of goods that are listed in the database.</p>
        <p>Registration
System administrator</p>
        <p>View the
availability of
materials in stock
completing the task, employees enter this information in their account. To ensure the effectiveness of
the system, it is necessary to motivate employees with the following measures as self-development,
profit sharing, career growth, professional recognition, etc. [6]. The place of application of the system
is industrial enterprises for sewing. This system, for example, reflects the transition from manual,
time-consuming and error-prone routine operations to the use of computer technology that quickly
and accurately stores and processes the information needed to make management decisions.</p>
        <p>Manager</p>
        <p>Distribution of
tasks between</p>
        <p>employees
Defining the
powers of
employees
Seamstress</p>
        <p>Establishing a
work schedule</p>
      </sec>
    </sec>
    <sec id="sec-4">
      <title>4. Conclusions</title>
      <p>The problem of automating the work of certain departments or even the whole enterprise is
important. After all, every day there are new functions, opportunities to simplify the work, the use of
which will facilitate the work of production and reduce costs. Therefore, each company must monitor
new trends, functions, applications, programs, etc. and implement them to make a profit. Also, it is
necessary to constantly analyze the work of production and identify weaknesses and eliminate them.
One of such methods is the transition to automated work using modern technologies. The paper
considers the development of an automated information enterprise management system as a research
project that has a certain life cycle, which is implemented in such phases - pre-investment, investment
and operational. With the help of calendar planning tools, a Gantt chart was constructed, which shows
the sequence of works defined in time. And it allows you to specify the resources (labor, financial and
material) and their workload, which are necessary to perform a task. After describing all the works
and resources, the general budget of the project was calculated, and the main points of its conclusion
were described. For systematization of the project the classification on traditional features is carried
out as scale, complexity, quality, sphere of activity, duration. The main functions of the project are
given. The structure of the business plan, its content, participants, and standards are analyzed. After
analyzing the system, using object-oriented methodology, the boundaries of the system and the
environment were separated, the actors, options for use and the relationship between them were
identified. There are three main functions that reflect and characterize the operation of the automated
information management system of the enterprise manufacturing goods.</p>
    </sec>
    <sec id="sec-5">
      <title>5. References</title>
      <p>[1] K. R. Bibarsov, G. I. Khokholova, D. R. Okladnikova, Conceptual basics and mechanism of
innovation project management. European Research Studies Journal, 20(2B), 2017, 224-235.
[2] T. Morden, Principles of Strategic Management, 3rd ed., Routledge, 2017, 640 p.
[3] Wyn Jenkins, Dave Williamson, Strategic Management and Business Analysis, 2nd. ed.,</p>
      <p>Routledge, London and New York, NY, 2015.
[4] Michael S. Zambruski, A Standard for Enterprise Project Management, 1st. ed., Auerbach</p>
      <p>Publications, 2008, 128 p.
[5] Hal G. Rainey, Understanding and Managing Public Organizations, 5th ed., Jossey-Bass</p>
      <p>Publishers, 2014, 571 p.
[6] Kathy Schwalbe, Information Technology Project Management, 7th ed., Course Technology,</p>
      <p>Cengage Learning, 2015.
[7] J. Jeston, Business Process Management: Practical Guidelines to Successful Implementations,
4th ed., Routledge, 2018, 690 p.
[8] J. Pinggera, P. Soffer, S. Zugal, B. Weber, M. Weidlich, D. Fahland, H.A. Reijers, J.</p>
      <p>Mendling, Modeling styles in business process modeling. In: Proceedings of the BPMDS ’12,
2012, pp. 151–166.
[9] J. Cardoso, Business process control-flow complexity: metric, evaluation, and validation. Int. J.</p>
      <p>Web Serv. Res. 5(2), 2008, pp. 49–76.
[10] Gould Howard, Systems Analysis and Design. Bookboon, 2016. 147 p.
[11] J. Geraldi, T. Lechler, Gantt charts revisited: A critical analysis of its roots and implications to
the management of projects today. International Journal of Managing Projects in Business,
Volume 5, Number 4, 2012, pp. 578-594.
[12] A. Sharon, D. Dori, Model‐Based Project‐Product Lifecycle Management and Gantt Chart
Models: A Comparative Study. The Journal of The International Council on Systems
Engineering. Vol.20. Issue 5, 2017, pp.447-466. doi.org/10.1002/sys.21407
[13] O. Rebière, C. Rebière, Mastering the Gantt Chart: Understand and use the "Gantt Project" open
source software efficiently! Guide Education, 2017.
[14] J. Westland, The Project Management Life Cycle: A Complete Step-By-Step Methodology for
Initiating, Planning, Executing &amp; Closing a Project Successfully. Kogan Page; PAP/CDR
edition, 2007, 237 p.
[15] M. Pica, Project Life Cycle Economics: Cost Estimation, Management and Effectiveness in</p>
      <p>Construction Projects. Routledge, 2015, 440 p.
[16] Jolyon Hallows, Information Systems Project Management: How to Deliver Function and Value
in Information Technology Projects, 2nd. ed., AMACOM, 2005.
[17] S. Petter, Managing user expectations on software projects: Lessons from the trenches.</p>
      <p>International Journal of Project Management, 26(7), 2008, pp. 700–712.
[18] J. Motwani, D. Mirchandani, M. Madan, A. Gunasekaran, Successful implementation of ERP
Projects: Evidence from two case studies. International Journal of Production Economics, 75(1),
2002, pp. 83–96. doi:10.1016/S0925-5273(01)00183-9.
[19] F. Millerand, K. S. Baker, Who are the users? Who are the developers? Webs of users and
developers in the development process of a technical standard. Information Systems, 20(2), 2010,
pp.137–161.
[20] Rzheuskyi, H. Matsuik, N. Veretennikova, R. Vaskiv, Selective Dissemination of Information –
Technology of Information Support of Scientific Research. Advances in Intelligent Systems and
Computing 871 (2019) 235–245.
[21] O. Matsyuk, M. Nazaruk, Y. Turbal, N. Veretennikova, R. Nebesnyi, Information analysis of
procedures for choosing a future specialty. Advances in Intelligent Systems and Computing
(AISC) 871 (2019) 364–375.
[22] N. Veretennikova, R. Vaskiv, Application of the Lean startup methodology in project
management at launching new innovative products, in: Proceedings of the 13th International
Scientific and Technical Conference on Computer Sciences and Information Technologies, CSIT
2018, 2018, pp. 169–173.
[23] R. Kaminskyi, N. Kunanets, V. Pasichnyk, A. Rzheuskyi, A. Khudyi, Recovery gaps in
experimental data. CEUR Workshop Proceedings 2136 (2018) 108–118.
[24] E. Vasilevskis, I. Dubyak, T. Basyuk, V. Pasichnyk, A. Rzheuskyi, Mobile application for
preliminary diagnosis of diseases. CEUR Workshop Proceedings, 2255 (2018) 275–286.
[25] J.Stolarek, P. Lipiński, Improving watermark resistance against removal attacks using orthogonal
wavelet adaptation, Lecture Notes in Computer Science, 2012, 7147 LNCS, pp. 588-599.
[26] A. Wosiak, P. Lipiński, M. Kaźmierski, I. Kersz, Optimisation of the cooling unit in the system
for supervising the condition of large power transformers, Przeglad Elektrotechniczny, 2009, 85
(12), pp. 166-169.</p>
    </sec>
  </body>
  <back>
    <ref-list />
  </back>
</article>