        <article-title>Transfer of Project Management Technologies from Information Technology to Construction Industry</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>Primak Yury</string-name>
          <email>primak@mipk.by</email>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Lukianov Dmytro</string-name>
          <email>lukianov@live.com</email>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
        <aff id="aff0">
          <label>0</label>
          <institution>Ph.D., Dean for faculty of Construction, Belarusian National Technical University, Republic of Belarus</institution>
          ,
          <addr-line>Minsk</addr-line>
        </aff>
        <aff id="aff1">
          <label>1</label>
          <institution>Ph.D., Professor, Belarusian National Technical University, Republic of Belarus</institution>
          ,
          <addr-line>Minsk</addr-line>
        </aff>
      </contrib-group>
      <abstract>
        <p>The article discusses the need for transformation of construction project management teams in connection with the digitalization of the construction industry and the increasing use of BIM technologies in the implementation of construction projects. The key to successful implementation of the project in construction during the transition from traditional methods of construction management to innovative approaches with the maximum use of information modeling technologies at all stages of the project life cycle will be the use of approaches tested for the field of information technology.</p>
      </abstract>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>-</title>
      <p>
        Problem statement. In fact, we can say that the industry has already come to understand that it is
necessary to rethink the usual stages of the project. In particular, the “design” stage, which usually ends with the
receipt of “design documentation” (in different countries - of different composition and depth of detail) in changing
conditions, is more likely to end with the creation of a “digital double” [
        <xref ref-type="bibr" rid="ref2">2</xref>
        ] of the future building (another engineering
facility) that has passed checking for collisions and other inconsistencies, supported by the corresponding library of
digital elements - “digital doubles”, necessary for the implementation of the project of building materials, construction
and engineering equipment. And it is this created digital model that should become for those who will implement such
a project in the future, albeit unusual, but obligatory for execution by “project documentation”. At the same time, a
single digital model of maturity level 3 and above [
        <xref ref-type="bibr" rid="ref3">3</xref>
        ] can really include the information necessary not only for
construction, but also for operation, modernization, reconstruction, and the subsequent inevitable liquidation of the
object in the future. With this approach, we can say that when initiating a project in construction, one can really talk
about initiating at least two projects that will go “shoulder to shoulder” - a project in the field of information
technology aimed at creating a “digital double” of the future object, and, directly, a construction project related to its
future physical implementation. And in this case, we can talk about the need to redistribute the "project roles" between
these projects, as well as the introduction of new roles that were previously specific to the field of information
technology.
      </p>
      <p>
        Main part. It is to be expected that some approaches and, of course, best practices, such as ITSM [
        <xref ref-type="bibr" rid="ref4">4</xref>
        ],
Agile [
        <xref ref-type="bibr" rid="ref5">5</xref>
        ] and DevOps [
        <xref ref-type="bibr" rid="ref6">6</xref>
        ], which grew out of them, will inevitably come into the sphere of construction projects and
Copyright © 2019 for this paper by its authors. Use permitted under Creative Commons License Attribution 4.0 International (CC BY 4.0).
their subsequent operation, which solved the same problems that exist at the borders between the areas of
responsibility of "designers", "builders" and "operators" inherent in the construction industry, but in the field of
information technology. In particular, a well-known information resource such as the Gartner Blog Network published
a note by its research director, Christopher Little, where he proposes to use an integrated customer value cycle formed
by “superimposing” (or “combining”) elements of subproject life cycles related to the activity of those who “plans”,
“creates” and, in the future, exploits” [
        <xref ref-type="bibr" rid="ref7">7</xref>
        ], as shown in Figure 1:
      </p>
      <p>It is worth noting that due to the greater “squeeze” of projects in the field of information technology over
time, approaches to project management in this area are the undisputed leaders in modern project management
technologies, both in terms of using existing project management methodologies and their rethinking and
development.</p>
      <p>
        Results. For the effective implementation of such "mixed", both for the tasks to be solved and for the
technologies used, modern "hybrid" projects at the intersection of information technologies, technologies for the
organization of construction production, and also, in some cases, technologies for the production of building materials
and structures, it is necessary review existing approaches to the formation of management teams for such projects.
The issues of organizing a project management team and managing their role-based communications are one of the
key elements affecting the success of a project, which has been given attention for a long time [
        <xref ref-type="bibr" rid="ref8">8</xref>
        ]. On the other hand,
it is obvious that there is not enough training for specialists in the construction industry in precisely those areas that
would be close to both BIM and project management, as shown in a guide such as Building Information Modeling for
Project Managers [
        <xref ref-type="bibr" rid="ref9">9</xref>
        ].
      </p>
      <p>It is expected that the need to expand the role of the project manager is forecasted, to ensure the possibility
of his maximum involvement in issues related to both project management and understanding the logic of obtaining
the final product using, in this case, BIM tools (Figure 2).</p>
      <p>
        All this is fully consistent with the roles described in a compact but capacious study based on the analysis of
a standard such as ISO19650 [
        <xref ref-type="bibr" rid="ref10">10</xref>
        ], in which the following roles specific to the project management team using BIM
are highlighted:
a) Project Information Manager,
b) Task Team Manager,
      </p>
    </sec>
    <sec id="sec-2">
      <title>c) Task Information Manager,</title>
    </sec>
    <sec id="sec-3">
      <title>d) Interface Manager,</title>
    </sec>
    <sec id="sec-4">
      <title>e) Information Author,</title>
    </sec>
    <sec id="sec-5">
      <title>e) BIM Manager,</title>
    </sec>
    <sec id="sec-6">
      <title>g) BIM Coordinator,</title>
    </sec>
    <sec id="sec-7">
      <title>h) BIM Technician / Modeller.</title>
      <p>This system of three "enlarged" standard roles in the project:
 Task Team: Individual or organization who is responsible for the production of the design outputs related
to a discipline-specific, package-based or time-based task. This includes the previously mentioned:
 BIM Author: is the content creator,
 Interface Manager: manage coordination and clashes,
 Task Information Manager (TIM): Direct the production of information using agreed standards and
reviews information deliverables,
 Task Team Manager: Coordinated design and approves information deliverables.</p>
      <p>
         Lead Supplier: Individual or organization who is appointed by the Employer, responsible for coordinated
delivery of all design information AND / OR appoints task teams (predominantly first tier contractors)
 Employer’s Representative: Individual or organization for whom the contract is executed or delivered.
 Even for this system and role model, it is possible to draw an analogy from the sphere of professional
certification that exists in the field of project management and specifically for one of the Agile approaches - for
certification of professionals using Scrum. As stated in the Scrum Founding Guide: “Scrum is a framework for
developing, delivering, and sustaining complex products. This Guide contains the definition of Scrum. This definition
consists of Scrum’s roles, events, artifacts, and the rules that bind them together” [
        <xref ref-type="bibr" rid="ref11">11</xref>
        ].
      </p>
      <p>The Scrum Team consists of a Product Owner, the Development Team, and a Scrum Master. Each of the
roles, respectively, has its own certification requirements, and, accordingly, passed certification as a Scrum master,
will be called a "Certified Scrum Master", etc:</p>
      <p> The Product Owner is responsible for maximizing the value of the product resulting from work of the
Development Team. How this is done may vary widely across organizations, Scrum Teams, and individuals.</p>
      <p> The Development Team consists of professionals who do the work of delivering a potentially releasable
Increment of “Done”product at the end of each Sprint.</p>
      <p> The Scrum Master is responsible for promoting and supporting Scrum as defined in the Scrum Guide.
Scrum Masters do this by helping everyone understand Scrum theory, practices, rules, and values.</p>
    </sec>
    <sec id="sec-8">
      <title>Moreover, if you carefully read the description of each of the roles in Scrum, you can draw the following analogy with the role model “BIM Level 2 Business Systems Certification”: Product Owner = Employer’s Representative Development Team = Task Team</title>
      <p>Scrum Master = Lead Supplier</p>
      <p>
        It is important to understand that the availability of knowledge in the field of "BIM as a tool" among specialists
on the part of the executing organization (organizations) involved in the implementation of the project does not
guarantee the success of the entire project. A similar situation exists in the implementation of IT projects. The presence
of knowledge in the field of “directly technologies” among IT specialists implementing projects also does not
guarantee the success of the entire project. For projects in the field of information technology, as was noted for an
example of using an approach such as Scrum, it was proposed to supplement the model of “aggregate competences of
the project team” with a serious focus on maximizing the value of the project being implemented through the role of
Product Owner. Similar logic can be traced in the recommendations on the formation of the project team and
expectations for the competencies needed by the participants of the modern construction project. According to [
        <xref ref-type="bibr" rid="ref10">10</xref>
        ],
with reference to AEC BIM Technology Protocol V.2.1.1, it is necessary to ensure the continuity of the
decisionmaking system at the following three levels, as shown in Figure 3:
      </p>
      <p>As can be seen from the above matrix, confident possession of the entire set of skills given in the aggregate
for all three levels, it is hardly worth expecting from one specific person, regardless of the level at which he is in the
organization. Therefore, it is worth saying that the possession of BIM technologies should be considered much broader
than simply “tool ownership”, for example, of one or another software package from one or another leader-producer
of specialized software, which are not so few today in the world. It is worth talking about an integrated multi-level
system of knowledge that requires an appropriate training system - both specialists and managers of construction
industry enterprises.</p>
      <p>Conclusion. To the existing system of managerial decision-making in the implementation of projects in
the construction industry, it is necessary, as it was done in the field of information technology, to involve specialists
responsible for operation. Special attention should be paid to the training of specialists in the field of operation of
buildings and structures, including knowledge in the field of BIM technologies in the requirements for their
competencies, which will really organize the work of all participants in a construction project throughout its entire life
cycle in the logic “operation” - “construction” - "design". Only then can we talk about the readiness of the construction
industry to create a ConOps (Construction+Operation) model similar to DevOps in the field of software and
information systems development.</p>
    </sec>
  </body>
  <back>
    <ref-list>
      <ref id="ref1">
        <mixed-citation>
          1.
          <string-name>
            <surname>Bryde</surname>
            <given-names>D.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Broquetas</surname>
            <given-names>M.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Volm</surname>
            <given-names>J. M.</given-names>
          </string-name>
          <article-title>The project benefits of building information modelling</article-title>
          (BIM) //International journal of project management.
          <source>- 2013</source>
          . -
          <fpage>Т</fpage>
          .
          <year>31</year>
          . -
          <fpage>№</fpage>
          . 7. - P.
          <fpage>971</fpage>
          -
          <lpage>980</lpage>
          .
        </mixed-citation>
      </ref>
      <ref id="ref2">
        <mixed-citation>
          2.
          <string-name>
            <given-names>Andy</given-names>
            <surname>Stanford-Clark</surname>
          </string-name>
          ,
          <article-title>Erwin Frank-Schultz, Martin Harris What are digital twins?</article-title>
          [Electronic resource] // Available at: https://developer.ibm.com/articles/what-are
          <string-name>
            <surname>-</surname>
          </string-name>
          digital-twins/ - Accessed:
          <fpage>10</fpage>
          .
          <fpage>11</fpage>
          .
          <year>2019</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref3">
        <mixed-citation>
          3.
          <string-name>
            <given-names>BIM</given-names>
            <surname>Maturity Levels</surname>
          </string-name>
          Explained- Level 0,
          <string-name>
            <surname>Level</surname>
            <given-names>1</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Level</surname>
            <given-names>2</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Level</surname>
            <given-names>3</given-names>
          </string-name>
          [Electronic resource] // Available at: https://www.united
          <article-title>-bim.com/bim-maturity-levels-explained-level-0-1-</article-title>
          <issue>2</issue>
          -3/ - Дата доступа:
          <volume>10</volume>
          .
          <fpage>11</fpage>
          .
          <year>2019</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref4">
        <mixed-citation>
          4.
          <string-name>
            <given-names>IT</given-names>
            <surname>Service</surname>
          </string-name>
          <article-title>Management (ITSM</article-title>
          ) [Electronic resource] // Available at: https://www.ibm.com/cloud/learn/itservice-management -
          <source>Accessed: 10.11</source>
          .
          <year>2019</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref5">
        <mixed-citation>
          5.
          <string-name>
            <surname>Cobb</surname>
            <given-names>C. G.</given-names>
          </string-name>
          <article-title>The project manager's guide to mastering Agile: Principles and practices for an adaptive approach</article-title>
          . - John Wiley &amp; Sons,
          <year>2015</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref6">
        <mixed-citation>
          6.
          <string-name>
            <surname>Bass</surname>
            <given-names>L.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Weber</surname>
            <given-names>I.</given-names>
          </string-name>
          , Zhu L.
          <article-title>DevOps: A software architect's perspective</article-title>
          . -
          <string-name>
            <surname>Addison-Wesley Professional</surname>
          </string-name>
          ,
          <year>2015</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref7">
        <mixed-citation>
          7.
          <source>DevOps Mar</source>
          <year>2019</year>
          [Electronic resource] // Available at: https://blogs.gartner.com/christopherlittle/2019/03/01/devops-mar-2019/ - Accessed:
          <fpage>10</fpage>
          .
          <fpage>11</fpage>
          .
          <year>2019</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref8">
        <mixed-citation>
          8.
          <string-name>
            <surname>Lukianov</surname>
            <given-names>D.</given-names>
          </string-name>
          et al.
          <article-title>Development of the markov model of a project as a system of role communications in a team //Eastern-European journal of enterprise technologies</article-title>
          .
          <source>- 2017</source>
          . -
          <fpage>№</fpage>
          .
          <volume>3</volume>
          (
          <issue>3</issue>
          ). - P.
          <fpage>21</fpage>
          -
          <lpage>28</lpage>
          .
        </mixed-citation>
      </ref>
      <ref id="ref9">
        <mixed-citation>
          9. Building Information Modelling for Project Managers [Electronic resource] // Available at: https://www.rics.org/globalassets/rics-website/media/knowledge/research/insights/bim
          <article-title>-for-project-managersrics</article-title>
          .pdf - Accessed:
          <fpage>10</fpage>
          .
          <fpage>11</fpage>
          .
          <year>2019</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref10">
        <mixed-citation>
          10.
          <string-name>
            <surname>Roles</surname>
            or Functions in
            <given-names>BIM</given-names>
          </string-name>
          [Electronic resource] // Available at: https://www.linkedin.com/pulse/rolesfunctions-bim
          <string-name>
            <surname>-</surname>
          </string-name>
          narciso-guerrero/ - Accessed:
          <fpage>10</fpage>
          .
          <fpage>11</fpage>
          .
          <year>2019</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref11">
        <mixed-citation>
          11. BIM Level 2
          <string-name>
            <given-names>Business</given-names>
            <surname>Systems</surname>
          </string-name>
          <string-name>
            <given-names>Certification</given-names>
            [Electronic resource] // Available at: https://www.bregroup.com/expertise/bim/bim
            <surname>-</surname>
            certification/bim-level-2-
          </string-name>
          business-systems-certification/ - Accessed:
          <fpage>10</fpage>
          .
          <fpage>11</fpage>
          .
          <year>2019</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref12">
        <mixed-citation>
          12.
          <article-title>The Scrum GuideTM. The Definitive Guide to Scrum: The Rules of the Game</article-title>
          [Electronic resource] // Available at: https://www.scrumguides.org/docs/scrumguide/v2017/2017-Scrum-Guide-US.pdf - Accessed:
          <fpage>10</fpage>
          .
          <fpage>11</fpage>
          .
          <year>2019</year>
          .
        </mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>