        <article-title>Optimization of the electrical networks reconstruction strategy by the criterion of functioning quality</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>Petro Lezhniuk</string-name>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Vyacheslav Komar</string-name>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Olena Sikorska</string-name>
          <email>olenasikorska@ukr.net</email>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Volodymyr Netrebsky</string-name>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Oleksandr Buryak</string-name>
          <email>buryak_om@ukr.net</email>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Yunifa Miftachul Arif</string-name>
          <xref ref-type="aff" rid="aff0">0</xref>
        </contrib>
        <aff id="aff0">
          <label>0</label>
          <institution>Universitas Islam Negeri Maulana Malik Ibrahim Malang</institution>
          ,
          <addr-line>Jl. Gajayana No.50, Dinoyo, Kec. Lowokwaru, Kota Malang, Jawa Timur, 65144</addr-line>
          ,
          <country country="ID">Indonesia</country>
        </aff>
        <aff id="aff1">
          <label>1</label>
          <institution>Vinnytsia National Technical University</institution>
          ,
          <addr-line>Khmelnytske Shose, 95, Vinnytsia, 21021</addr-line>
          ,
          <country country="UA">Ukraine</country>
        </aff>
      </contrib-group>
      <abstract>
        <p>The intensive development of renewable energy sources is one of the main reasons that necessitates the reconstruction or modernisation of existing power distribution networks. The study proposes a method based on the use of dynamic programming and an integral indicator of the quality of functioning as an optimality criterion. This method allows developing an optimal strategy for the reconstruction of power grids, taking into account the quality of electricity, reliability and eficiency.</p>
      </abstract>
      <kwd-group>
        <kwd>eol&gt;electric network</kwd>
        <kwd>renewable sources</kwd>
        <kwd>operation quality</kwd>
        <kwd>integral index</kwd>
        <kwd>dynamic programming</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>1. Introduction</title>
      <p>2. Setting the task of optimizing the development of electrical
networks with renewable energy sources
Objective assessment of promising technical solutions for the development of electrical networks is
possible with full consideration of the temporal (dynamic) and spatial relationships operating in the
systems [2]. This requires the construction of appropriate dynamic models of optimal development of
electrical networks. However, the development of dynamic models of optimal development that meet
the requirements of researchers and designers of real systems is a complex task that does not have
a general solution method. In the work, a dynamic model of optimal development is understood as
a method and algorithm for choosing a development strategy (terms of implementation of measures
for the development of electric networks) according to the selected optimality criterion. It provides a
minimum or suficiently close value of the integral over the calculation period and over the object as
a whole of the objective function while observing the imposed restrictions. The work considers only
such dynamic models that implement multi-step solution processes using the optimality principle of
dynamic programming [3].</p>
      <p>The implementation of dynamic methods of models for optimizing the development of electric power
systems with renewable energy networks is associated with significant dificulties. This is determined
by the nature of dynamic problems, namely:
• the need to consider multi-step development processes;
• the discreteness of variables;
• the presence of discrete nonlinear and linear constraints;
• the complex nature of the dependence of the integral in time and space of the objective function
on the variables.</p>
      <p>When setting a dynamic problem, the existing practice of comparing options during planning and
designing the development of electric power systems according to the technical and economic criterion
is taken as a starting point. A work [4] uses a multi-criteria approach to evaluating solutions.</p>
      <p>For the mathematical formulation of the dynamic problem of optimizing the development of the
electric network, we will introduce a number of concepts. Event – reflects a certain set of specific
works carried out on a certain set of network elements. This definition does not include the time of
implementation of the event. The specific meaning of the concept of “event” can be very diverse. For
example, a specific event can be the construction, reconstruction or dismantling of lines or substations,
transferring lines to a higher nominal voltage, etc. However, any event, regardless of its specific meaning,
is characterized by:
a) capital investments associated with the implementation of the event;
b) changes in the graph network, which are described by a set of branches that are added to or
disconnected from the graph.</p>
      <p>The set of alternative events, regarding the development of networks, contains various alternative 
events. The notation   is introduced for this set. Alternative events in the dynamic problem act as
variables.</p>
      <p>Development step is a time interval characterized by the sequence number , the coeficient of
reduction of multi-temporal costs for this step - () , the design loads of nodes for the considered
network modes -  (, ),  = 1.., where  - the number of design modes in the step. It is assumed that
no network development measures are implemented during the step. The moment of implementation
of the measure is attributed to the beginning of a certain step.</p>
      <p>
        Network development strategy  is a sequence (
        <xref ref-type="bibr" rid="ref1">1</xref>
        ), (
        <xref ref-type="bibr" rid="ref2">2</xref>
        ), ..., (), .., ( ) in which () is a set of
measures implemented before the start of the -th development step. The set () has the following
properties:
a) the set () in the general case can include from 1 to  implemented measures, i.e. in limiting
cases or in special cases, restrictions can be imposed on the number of implemented measures;
a) for any pair of development steps ′ and ′′ − ( ′) ∩ (′′) = 0 since any measure can be
implemented no more than once;
      </p>
      <p>a) the relation holds ⋃︀ () ∈  , since in the process of network development measures can be
implemented only from the set .</p>
      <p>The state of network development  () at a step  is a set of measures implemented at the
develop=1
ment steps  = 1, 2, ...,  : () = ⋃︀ () . Note that  () ⊂  . Each state of the network uniquely
corresponds to:</p>
      <sec id="sec-1-1">
        <title>1) capital investment;</title>
        <p>2) network graph;
3) the level of quality of operation of the electric network.</p>
        <p>The estimated costs of the -th step (,  ) have the property that they are uniquely determined
by the state  and step  , since the measures implemented in  , determine the capital investments
and changes in the graph network (its scheme), and the loads of the step  - the network mode and the
indicators dependent on it - currents, losses, etc.</p>
        <p>Admissible development strategy. Based on the fact that development can also be represented as a
sequence of states , admissible development is determined by two conditions:
1)  ( − 1) ⊂  
2) at all development steps the given constraints must be satisfied.</p>
        <p>In the above definitions, the dynamic problem of optimizing the development of the electric network
can be formulated as follows.</p>
        <p>It is necessary to find such admissible strategy of the network development 0, which has the
minimum total reduced costs for the calculation period  . Hereinafter, 0 is called the optimal
development strategy.</p>
        <p>The objective function characterizing the technical and economic criterion, according to [4], is usually
a sum. For the applied model of the development process, it has an important property: each term of the
sum depends only on the state of development and the parameters of this step. Under these conditions,
it is possible to use the dynamic programming method.</p>
        <p>The solution of the dynamic problem of optimizing the development of electrical networks is carried
out using the appropriate dynamic models. Such models implement a systematic approach to the
problem of optimizing the development of electrical networks, which is expressed in solving the
problem of the development of the object in space and time.</p>
        <p>The development space model is a network graph containing branches that reflect both existing and
prospective network elements. The development time model is an ordered sequence of development
steps  = 1, 2, ...,  .</p>
        <p>The structure of the dynamic model, designed to solve specific problems of designing and planning
the development of the electric network, is shown in Figure.1
3. Modeling the problem of optimizing the development of the
electric network
As shown above, the dynamic development problem has a multi-step structure and can be formulated as
determining the optimal sequence of network states in time according to the criterion of the minimum
of the objective function of the form:</p>
        <p>= ∑︁ (,  ())</p>
        <p>
          =1
where (, 0) is the component of the objective function at step  for the development state  . The
solution of the dynamic problem consists of two stages. At the first stage, the optimal development
of the network for the calculation period  is determined from the initial state  (0) to the final state
 (). At the other stage, its optimal state is determined. Therefore, the task of optimizing the network
development process is to determine
min  = min min
 [(,)]
 [(,  )]
where  – the state of network development at time  ; [ ]– the set of possible states of development at
time  ; – the network development strategy for the period  from the initial state to state  ; (,  )
(
          <xref ref-type="bibr" rid="ref1">1</xref>
          )
(
          <xref ref-type="bibr" rid="ref2">2</xref>
          )
– the set of possible development strategies for the period to state  ;  [(,  )] – the value of the
integral objective function for the development strategy (,  ).
        </p>
        <p>
          Expression (
          <xref ref-type="bibr" rid="ref2">2</xref>
          ) is a general mathematical expression of the dynamic problem of optimizing the
development of the electric network.
        </p>
        <p>
          Each -th term of the criterion depends on the loads and other indicators at step , on the state  ()
at step  and on the state  ( − 1) at the previous step. Reduction to the form (
          <xref ref-type="bibr" rid="ref1">1</xref>
          ) is possible only
if the definition of the state used in the work is used. If the cost reduction criterion is used, then its
components are determined by the expression:
 (,  ()) = (  ( ()) +  (,  ())) · Π (1 + Π)−(+1) ,  = 1, 2, ...,  − 1
 (,  ( )) = (  ( ( )) +  (,  ( ))) · Π (1 + Π)− ,
(
          <xref ref-type="bibr" rid="ref3">3</xref>
          )
(
          <xref ref-type="bibr" rid="ref4">4</xref>
          )
where  ( ())– total capital investments for the event, implemented in the state  ();
 (,  ()) – expenses of the  -th year;  – normative coeficient of eficiency of capital investments;
Π– normative coeficient of reduction of diferent-time costs.
        </p>
        <p>
          In this way, it is shown that the technical and economic criterion used in practice can be reduced to
the form (
          <xref ref-type="bibr" rid="ref1">1</xref>
          ). The objective function (
          <xref ref-type="bibr" rid="ref1">1</xref>
          ) has the following properties:
• it is expressed as a sum,
• each component  (,  ) depends only on  and  and does not depend on the development
strategy before  .
        </p>
        <p>These properties are suficient for the application of the optimality principle of dynamic programming.
For network development optimization problems, the optimality principle is formulated as follows: the
optimal development of the network over time  + 1, ...,  from  () state to state  ( + 1) does
not depend on the transition strategy to  () from the initial state  (0). Such a formulation of the
optimality principle allows us to obtain a recurrent expression by which the minimum value of the
objective function is determined - the functional  (,  ), for development from  (0) to state  over
time  (see Figure2).
where { (,  )} is the set of available network development strategies one hour  before state  .
The component of the objective function for the zero-development step can be taken as constant:
 (0,  (0)) = const
The notation</p>
        <p>shows that the objective function is minimized for all network development
min
{(,)}
strategies from  (0) to this state  .
hour ( − 1) before state  ( − 1).
to is possible, as well as the notation { ( − 1,  ( − 1))}</p>
        <sec id="sec-1-1-1">
          <title>Let us introduce the notation { ( − 1) ⊂ }</title>
          <p>for the set of states  ( − 1)</p>
          <p>from which a transition
for the set of development strategies one
Minimization of the objective function can be performed in the following sequence
 (,  ) =</p>
          <p>min
{(−1)⊂}
︂{
 (,  ) +</p>
          <p>
            min
{(−1,(−1))}
[ (0,  (0)) + ... +  ( − 1,  ( − 1))]
︂}
. (7)
In the model of the development process of the electrical network under consideration,  (,  ) does
(
            <xref ref-type="bibr" rid="ref5">5</xref>
            )
(
            <xref ref-type="bibr" rid="ref6">6</xref>
            )
not depend on  ( − 1). In addition,
 ( − 1,  ( − 1)) =
therefore
          </p>
          <p>min
{(−1),(−1)}</p>
          <p>
            [ (0,  (0)) +  (1,  (
            <xref ref-type="bibr" rid="ref1">1</xref>
            )) + ... +  ( − 1,  ( − 1))] , (8)
 ( − 1,  ( − 1)) =  ( − 1,  ( − 1)) +
min
 ( − 1,  ( − 1)) .
          </p>
          <p>(9)
{(−1)⊂}</p>
          <p>Expression (9) is a recurrent dynamic programming formula that allows for a multi-step procedure
for optimizing the network development strategy in an hour  from the initial to any state  ().</p>
          <p>
            Minimizing the objective function by (
            <xref ref-type="bibr" rid="ref2">2</xref>
            ) is reduced to solving a certain set of dynamic programming
problems by (9), in which the objective function is minimized for development from the initial to some
given state. This procedure is performed by induction, starting from the first step  = 1 and ending
with the last  =  . For  = 1 can be taken
          </p>
          <p>( = 1,  ) =  (,  ) .</p>
          <p>The minimization of the objective function for the step  is carried out according to the following
scheme. The possible states { ()} of the network at the step  are considered. For each  ():
necessary for the calculation of  (,  ()) ;
condition
1) calculations of the technical and economic indicators of the network are carried out, which are
2) the set of states { ( − 1)}</p>
          <p>is determined, from which a transition to the state  () is possible.</p>
          <p>In the model under consideration, verification of possible transitions can be carried out under the
 ( − 1) ∩ () =  ( − 1) ;
3) according to (9) is calculated  (,  ()), which corresponds to the minimum value of the objective
function for the development of the network from  (0) to  ().</p>
          <p>To perform the calculation according to this scheme, it is necessary to tabulate the values of
 ( − 1,  ( − 1)) and  (,  ()) for the possible states { }.
3.1. Method for choosing the optimal strategy for developing electric networks with
renewable energy sources
The task of minimizing the costs of reconstruction and operation of the electric network is solved when
choosing the optimal option for its development. The task is formulated as follows: it is necessary to
ensure a given level of quality of functioning of the electric network at the minimum reduced costs
for its reconstruction and operation. The consumer can receive power according to the variants of
the electric network scheme (the variants of the scheme depend on the state in which the electric
network is as a result of the failure of certain of its elements). It is necessary to ensure a given level of
quality of functioning of the so that the resulting costs for reconstruction and operation are the smallest.
Therefore, the task is reduced to minimizing
(10)
(11)
(12)

for restrictions

=1</p>
          <p>︁(
 = ∑︁ 
′</p>
          <p>︁)

=1
︁(</p>
          <p>︁)
1 −  ′ = ∏︁ (︀ 1 −  ′︀) , or ln 1 −  s′etpoint
︁(</p>
          <p>︁)
= ∑︁ ln 1 −  ′

=1
where  (′) =  +  – costs for reconstruction and operation of the -th scheme of the
distribution network;  and – costs for reconstruction and operation, respectively;  – variant
distribution network;  – total number of operating states of the power network.
of the power supply scheme, ′– indicator of the quality of functioning for the -th scheme of the</p>
          <p>Since the study of the relative change in the value of costs has a number of advantages over the study
of absolute values [5], let us proceed to
 (′) =
(′) −  0(′) =
0(′)
 (′)
0 (′) − 1 =
 − 1,
where ′0 – indicator of the quality of functioning of the original scheme.</p>
          <p>Using the base point method, let us proceed from (17) to the criterion equation of the form:
 = ∑︁  (︀ ′)︀
where  (′) = Θ′
︁(
′
︁)
+ 
︁(
′︁) – dimensionless function to be minimized is equal to ( ′)
Θ′ =  – similarity criteria; ri (︁
′ , oi (︁
︁)
′
︁)
– functions that determine the physical
connections in the object for reconstruction and operation, respectively; ri , oi – functions that
include the initial specific cost indicators for reconstruction and operation, respectively.
for the constraint
1 −  s′etpoint = ∏︀ (︁</p>
          <p>=1
function is represented in the form
where  is the indefinite Lagrange multiplier.</p>
          <p>To determine , we will solve the system of equations:
Equation (12) is invariant with respect to any changes in cost and technical indicators that do not
Taking into account (12), the problem is rewritten as minimize
change the value of Θ′. This allows the solution to be generalized to a number of other cases.

=1
 = ∑︁  (︀ ′)︀
1 −  ′
︁)</p>
          <p>︁(
or ln 1 −  s′etpoint
︁)</p>
          <p>︁(
= ∑︀ ln 1 −  ′ ,
︁)
To solve the problem, we will use the method of indefinite Lagrange multipliers. The Lagrange
 (︁
1′, ..., ′)︁

=1
(︁ 1′,...,′)︁
︁)</p>
          <p>′
1 −  s′etpoint
= ∑︀
=1 ln 1 −  ′

=1

=1
]︃</p>
          <p>︁(
=
︁)</p>
          <p>;
 
′ −</p>
          <p>1
1 −  ′ = 0.
⎧
⎪
⎨
⎪⎩ln
︁(
︁(
︁)</p>
        </sec>
      </sec>
      <sec id="sec-1-2">
        <title>Substituting (13) into (11), we obtain Whence</title>
        <p>[︃ 
′ =1</p>
        <p>︁(
∑︁</p>
        <p>︁(
=  ′ ; 
1− ′

=1
︁)
︁(</p>
        <p>︁)
′ +  ∑︁ ln 1 −  ′
′
= −· ln
︁(</p>
        <p>︁)
1 −  ′ + .</p>
        <p>Then 
relative increase in costs for this scheme, respectively:</p>
        <p>The constant of integration  is determined from the boundary conditions: for ′ = i′0 ,  =
i0 = 1, where i′0 and i0 are the quality indicator of the functioning of the original scheme and the
 = 1 + · ln</p>
        <p>1 −  i′0 )︁ ;
︁)
︁(
 = 1 − · ln
ln 1 −  ′
1 −  ′
+ · ln
︁(</p>
        <p>1 −  i′0 )︁ ;

=
1 −   + ln 1 −  i′0 )︁ .</p>
        <p>︁(
 =1
1 ∑︁ (1 −  ) + ∑︁ ln 1 −  i′0 )︁

︁(
= ln 1 −  s′etpoint .</p>
        <p>︁)
︁)</p>
        <p>︁(
=1
 =
∑︀ (1 −  )</p>
        <p>1− s′etpoint
ln ⎝ ∏=︀1(1− i′0 )

=1
⎛
⎛
⎞
⎠
︁(
⎞
After substituting (14) into expression (13), we arrive at a system of  equations with unknowns ′:
︁(
ln 1 −  ′
︁)
=</p>
        <p>1 −  
=1
∑︀ (1 −  )</p>
        <p>=1
ln ⎜⎜⎝ ∏1︀− (︀1 − s′etpoii′0n t)︀ ⎟⎠⎟ + ln 1 −  i′0 )︁ .</p>
        <p>︁(
(13)
(14)
(15)</p>
        <p>According to (15), ′ the schemes of the distribution electric network are determined, which
correspond to its possible states and will provide the general specified level of quality of functioning
s′etpoint .</p>
        <p>With the change in the relations between electricity supply companies and consumers, the
requirements for the quality of electricity supply have reached a significantly higher level. Therefore, taking
into account the quality of functioning as an indicator by which the reliability and quality of electricity
are assessed when assessing the ways of reconstruction of distribution electric networks is necessary
and relatively easy to implement [6].</p>
        <p>According to the material presented above, it is possible to form the first stage of the iterative method
for determining the optimal strategy for reconstruction of the electric network. That is, at the first
stage, when considering the possible states of the electric network in which it is as a result of changes
in the state of its elements, those most probable schemes of the electric network are determined, which
have the greatest impact on the value of the integral indicator of the quality of functioning. Based on
the sensitivity analysis, the components of the quality of functioning with a determining impact on
the integral indicator for the corresponding schemes are determined. Based on this analysis, a set of
measures is formed   to achieve s′etpoint . That is, as a result of the first stage, the general problem
of obtaining a given value of the integral indicator of the quality of functioning is decomposed into
subproblems, in which individual cases are analyzed according to the graph of possible states of the
electrical network.</p>
        <p>The next stage of the method is the selection of the optimal strategy for the reconstruction of a
separate variant of the electrical network scheme with a significantly smaller set of possible strategies.
However, to select the optimal strategy for the development of the electrical network, it is necessary to
obtain conditions under which it is possible to select the optimal one from the set of strategies in terms
of costs for achieving a given value of the integral indicator of the quality of functioning.</p>
        <p>So, at the first stage, the value of the integral indicator of the quality of functioning ′ was obtained,
the value of which we must achieve as a result of performing certain measures for the reconstruction of
the  -th scheme.
rewritten as:</p>
        <p>Let us use the approach that was used in the first stage. Let us formulate the optimization problem
for a separate circuit in the form of (10), but taking into account that ′′ obtained in the first stage
corresponds to ′′ in the second stage, that is, the given value of the integral indicator of the
quality of functioning for a certain circuit of the electrical network. Taking this into account, (11) is
︁(
ln 1 −  i′s′etpoint
︁)
= ∑︁ ln 1 −  ′′ )︁ ,</p>
        <p>︁(

=1
where   is the set of alternative measures for the development of networks.</p>
        <p>To solve this problem, we will use the method of indefinite Lagrange multipliers (we assume the
continuity of variables).</p>
        <p>The Lagrange function for this problem will have the form:
 (1, ...,  ) = ∑︁  +  ∏︁ (1 −  )

=1

=1
(16)</p>
        <p>Diferentiating (16) with respect to the variables and equating them to zero, we obtain a system of
equations of the form:

′′ − 

′′ − 

∏︀

∏︀
=1, ̸=
=1,̸=
(1 −  ) = 0;
(1 −  ) = 0.</p>
        <p>The solution to this system of equations will be:</p>
        <p>∏︀
 =1, ̸=</p>
        <p>∏︀
 =1, ̸=
(1 −  )
(1 −  )</p>
        <p>=  ln() = 1 or</p>
        <p>ln()
The graphical interpretation of (17) is shown in Figure 3.</p>
        <p>Expression (17) is a generalized condition for choosing the optimal strategy for the development of
the electric network. Taking into account the discreteness of the unknowns, the optimality condition is

rewritten as  .</p>
        <p>ln()≈  ln(</p>
        <p>At the second stage, the optimal strategy is selected according to condition (17) by comparing the
ratio of increments for possible schemes of the electric network that correspond to the graph of the
states of its functioning (see Figure 4, the numbering of the schemes is adopted in accordance with
Figure 3).</p>
        <p>This approach does not require a return move. However, due to the discreteness of the variables, the
method requires a number of iterations, which may require refinement of the calculations at the first
stage.
3.2. Analysis of a given level of quality of operation of electrical networks
Let us illustrate the assessment of possible options for supplying consumers using the criterion of
quality of operation of the network using the example of a diagram of a fragment of a 10 kV distribution
electrical network, shown in Figure5.</p>
        <p>For the scheme, the state change graph, taking into account hierarchical transformations, will have
the form shown in Figure 6. The physical essence of the states of the research object is as follows:
• state 1 - all lines and switching equipment are functioning;
• state 2 - one circuit on the two-circuit section of the TS 543 - TS 456 line has failed, taking into
account the possible states of the remaining elements of the distribution network;
• state 3 - the second circuit on the two-circuit section of the TS 543 - TS 456 line has failed, taking
into account the possible
• states of the remaining elements of the distribution network;
• state 4 - one circuit on the two-circuit section of the TS 456 - TS 455 line has failed, taking into
account the possible states of the remaining elements of the distribution network;
• state 5 - the second circuit on the two-circuit section of the TS 456 - TS 455 line has failed, taking
into account the possible states of the remaining elements of the distribution network;
• state 6 – one circuit on the two-circuit section of the TS 455 – TS 457 line has failed, taking into
account the possible states of the remaining elements of the distribution network;
• state 7 – the second circuit on the two-circuit section of the TS 455 – TS 457 line has failed, taking
into account the possible states of the remaining elements of the distribution network;
• states 8 – 10 – all feeder consumers are disconnected from power supply as a result of relay
protection tripping together with the failure of one of the lines of the sections TS 543 – TS 456,
TS 456 – TS 455, TS 455 – TS 457, respectively;
• state 11 – all feeder consumers are disconnected from power supply as a result of relay protection
tripping together with the failure of the section F-165 – TS 543.</p>
        <p>A system of Kolmogorov equations is compiled based on the graph (Figure6). For the remaining
power supply options for consumers, state graphs and systems of equations are compiled based on
them, using similar rules and assumptions.</p>
        <p>The initial data for calculating the quality of functioning are given in Table 1 and Table 2.
The result of solving the system of Kolmogorov equations is given in Table 3.</p>
        <p>When calculating the quality of operation of the power supply options from adjacent feeders, the
resulting value is determined as the product of the quality of operation of the corresponding feeder and
the fragment of the distribution network supplying consumers of the feeder F-165. For example, for
power supply from F-157, the resulting value of the quality of operation will be determined as follows:
The results of the calculations are shown in Figure.7.</p>
        <p>
          After analyzing the calculation results, it is possible to arrange the power supply centers according
to the connection priority: F-165 and F-157. Additional analysis is required for the remaining options.
For example, for TS457, electricity is received from F-185(
          <xref ref-type="bibr" rid="ref2">2</xref>
          ), and for TS456 - from F-185(
          <xref ref-type="bibr" rid="ref1">1</xref>
          ).
        </p>
        <p>Let’s check whether the existing network (Figure.1) will provide the quality of operation at the level
of 0.89. In this case, there is no need to determine the value of the reduced costs.</p>
        <p>Let’s calculate according to the expression ′ = 1
−</p>
        <sec id="sec-1-2-1">
          <title>1 −  ′ . According to Figure 7 for</title>
          <p>all substations of the network under consideration, the specified quality of operation is ensured.
∏4︀ (︁
=1
︁)</p>
        </sec>
      </sec>
    </sec>
    <sec id="sec-2">
      <title>4. Conclusions</title>
      <p>1. The development of renewable energy sources should lead to an improvement in the quality
of electricity supply. However, failure to take into account the state of electrical networks
to which RES are connected and the volumes of consumption may lead to the issuance of
technical conditions for the connection of sources of overestimated power. Under such conditions,
reconstruction of electrical networks is advisable.</p>
      <p>Limited financial resources require solving the problem of choosing priority areas of capital
investments during the reconstruction of electrical networks, in particular during the development
of renewable energy sources.
2. The work improves the method of determining the optimal strategy for the development of an
electrical model, which is based on building a dynamic model that takes into account time and
spatial relationships. Spatial relationships take into account changes in the network configuration,
and temporal relationships - the time diference between the implemented measures during the
development (reconstruction) of the electrical network. The proposed approach allows applying
the principle of optimality of dynamic programming and implementing a relatively simple
algorithm for finding the optimal strategy for the development of the electric network.
3. The choice of the optimal strategy for the development of electric networks is carried out according
to the criterion of the quality of functioning. Optimality conditions were obtained, which are
the ratio of the increments in the cost of measures performed at a certain step and the quality of
functioning in the state to which the performed measures led. This allowed reducing the number
of states considered when determining the optimal development strategy.
4. The examples of calculations given in the work show the feasibility of using a comprehensive
assessment of the options for solving both design and operational problems.</p>
    </sec>
    <sec id="sec-3">
      <title>Declaration on Generative AI</title>
      <p>The author(s) have not employed any Generative AI tools.</p>
    </sec>
  </body>
  <back>
    <ref-list>
      <ref id="ref1">
        <mixed-citation>
          [1]
          <string-name>
            <given-names>C.</given-names>
            <surname>Hong</surname>
          </string-name>
          ,
          <source>Power Grid Operation in a Market Environment</source>
          , John Wiley &amp; Sons, Ltd,
          <year>2016</year>
          . doi:https: //doi.org/10.1002/9781119083016.
        </mixed-citation>
      </ref>
      <ref id="ref2">
        <mixed-citation>
          [2]
          <string-name>
            <surname>K. B. Tawfiq</surname>
          </string-name>
          ,
          <article-title>Preface to the special issue “mathematical modeling and optimization of energy systems”</article-title>
          ,
          <source>Mathematics</source>
          <volume>13</volume>
          (
          <year>2025</year>
          ). URL: https://www.mdpi.com/2227-7390/13/5/860. doi:
          <volume>10</volume>
          .3390/ math13050860.
        </mixed-citation>
      </ref>
      <ref id="ref3">
        <mixed-citation>
          [3]
          <string-name>
            <given-names>G.</given-names>
            <surname>Hadley</surname>
          </string-name>
          ,
          <string-name>
            <surname>Addison-Wesley Pub</surname>
          </string-name>
          . Co.,
          <year>1964</year>
          . URL: https://archive.org/details/ nonlineardynamic0000ghad.
        </mixed-citation>
      </ref>
      <ref id="ref4">
        <mixed-citation>
          [4]
          <string-name>
            <given-names>W.</given-names>
            <surname>Wójcik</surname>
          </string-name>
          ,
          <string-name>
            <given-names>P.</given-names>
            <surname>Lezhniuk</surname>
          </string-name>
          ,
          <string-name>
            <given-names>C.</given-names>
            <surname>Kaczmarek</surname>
          </string-name>
          ,
          <string-name>
            <given-names>V.</given-names>
            <surname>Komar</surname>
          </string-name>
          , I. Hunko,
          <string-name>
            <given-names>N.</given-names>
            <surname>Sobchuk</surname>
          </string-name>
          ,
          <string-name>
            <given-names>L.</given-names>
            <surname>Yesmakhanova</surname>
          </string-name>
          ,
          <string-name>
            <given-names>Z.</given-names>
            <surname>Shermantayeva</surname>
          </string-name>
          ,
          <article-title>Integrated assessment of the quality of functioning of local electric energy systems</article-title>
          ,
          <source>Energies</source>
          <volume>18</volume>
          (
          <year>2025</year>
          ). URL: https://www.mdpi.com/1996-1073/18/1/137. doi:
          <volume>10</volume>
          .3390/en18010137.
        </mixed-citation>
      </ref>
      <ref id="ref5">
        <mixed-citation>
          [5]
          <string-name>
            <given-names>E.</given-names>
            <surname>Szafranko</surname>
          </string-name>
          ,
          <string-name>
            <given-names>P.</given-names>
            <surname>Srokosz</surname>
          </string-name>
          ,
          <article-title>Applicability of the theory of similarity in an evaluation of building development variants</article-title>
          ,
          <source>Automation in Construction</source>
          <volume>104</volume>
          (
          <year>2019</year>
          )
          <fpage>322</fpage>
          -
          <lpage>330</lpage>
          . URL: https://www.sciencedirect. com/science/article/pii/S0926580518304485. doi:https://doi.org/10.1016/j.autcon.
          <year>2019</year>
          .
          <volume>04</volume>
          .010.
        </mixed-citation>
      </ref>
      <ref id="ref6">
        <mixed-citation>
          [6]
          <string-name>
            <given-names>P.</given-names>
            <surname>Lezhnyuk</surname>
          </string-name>
          ,
          <string-name>
            <given-names>V.</given-names>
            <surname>Komar</surname>
          </string-name>
          ,
          <string-name>
            <given-names>S.</given-names>
            <surname>Kravchuk</surname>
          </string-name>
          ,
          <string-name>
            <given-names>O.</given-names>
            <surname>Nanaka</surname>
          </string-name>
          ,
          <article-title>Providing fixed level of electric energy supply quality in conditions of renovation of power distribution electrical networks with renewable energy sources</article-title>
          ,
          <source>in: 2017 IEEE First Ukraine Conference on Electrical and Computer Engineering (UKRCON)</source>
          ,
          <year>2017</year>
          , pp.
          <fpage>379</fpage>
          -
          <lpage>383</lpage>
          . doi:
          <volume>10</volume>
          .1109/UKRCON.
          <year>2017</year>
          .
          <volume>8100514</volume>
          .
        </mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>