<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Archiving and Interchange DTD v1.0 20120330//EN" "JATS-archivearticle1.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta />
    <article-meta>
      <title-group>
        <article-title>Feminist AI Research Network1⋆</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>María Estrada</string-name>
          <email>mestrada@tec.ac.cr</email>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Aurelio Sanabria</string-name>
          <email>ausanabria@tec.ac.cr</email>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Jeff Schmidt</string-name>
          <email>jschmidt@tec.ac.cr</email>
        </contrib>
        <contrib contrib-type="author">
          <string-name>Cesar Garita</string-name>
          <email>cesar@tec.ac.cr</email>
        </contrib>
      </contrib-group>
      <pub-date>
        <year>2025</year>
      </pub-date>
      <abstract>
        <p>Artificial intelligent systems have more frequently become involved assisting persons with their everyday life activities. However, if these systems are not designed properly, there are certain risks that need to be addressed in order to prevent negative effects of the application of this technology. These risks include managing biases in terms of gender, race and group stereotypes associated with potential end users. The f&lt;a+i&gt;r - Feminist AI Network, was created in order to develop new approaches on how AI data, algorithms, models, and systems can positively impact gender justice, quality of life, and social inclusion. This paper focuses on summarizing some of the most important challenges and results derived from the participation of the Costa Rica Institute of Technology (TEC) as a fund management partner in f&lt;a+i&gt;r.</p>
      </abstract>
      <kwd-group>
        <kwd>Feminist</kwd>
        <kwd>network</kwd>
        <kwd>artificial intelligence</kwd>
        <kwd>technology</kwd>
        <kwd>research</kwd>
        <kwd>equality</kwd>
        <kwd>inclusion</kwd>
        <kwd>2</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>1. Introduction</title>
      <p>
        Nowadays, existing Artificial Intelligence (AI) and algorithmic decision-making systems worldwide
are not free of gender, racial, and intersectional biases at its core of operation. Addressing this
embedded bias is crucial to unlock AI's potential for positive social impact. For example, voice
assistants are often configured with female voices by default, face or image recognition systems
may reflect societal stereotypes based on skin tones, and hiring algorithms can be trained on
historical data with gender disparities. These biases can infiltrate AI systems throughout their
development lifecycle, from
data
acquisition to
deployment, resulting in
unequal and
discriminatory impacts on specific populations [
        <xref ref-type="bibr" rid="ref1">1</xref>
        ].
      </p>
      <p>Therefore, it is necessary to take firm actions to prevent systems with these flaws from further
evolving in this direction, amplifying its undesirable discriminating consequences for certain
groups of people.</p>
      <p>
        As a result, the f&lt;a+i&gt;r – Feminist AI Research Network, was created to develop new approaches
on how AI and Automated Decision Making (ADM) data, algorithms, models, and systems can
positively impact social and gender justice, quality of life, and social inclusion [
        <xref ref-type="bibr" rid="ref2">2</xref>
        ]. Feminist AI
aims to make AI and emerging technologies more effective through the application of inclusion and
equality principles at its core.
      </p>
      <p>This alliance was created with the vision of a world where women and disempowered communities
are equal partners in decision making, design and development of AI tools.</p>
      <p>In this context, this paper focuses on summarizing some of the most important challenges and
results derived from the participation of the Costa Rica Institute of Technology (TEC) as a fund
management partner in this feminist AI research network [3]. The rest of this paper is organized
as follows. Section 2 provides a general description of the general structure and main results of the
f&lt;a+i&gt;r project. Section 3 focuses on the role of TEC as manager of the funds dedicated to the
support the operation of the network activities. Section 4 addresses the main challenges and
opportunities that were identified during the development of the project. Finally, Section 5 outlines
some conclusions and future work from which other related initiatives can benefit.</p>
    </sec>
    <sec id="sec-2">
      <title>2. The f&lt;a+i&gt;r project</title>
      <p>
        The f&lt;a+i&gt;r network aims to develop and implement feminist AI systems that foster equality and
inclusion, moving from research and community-driven prototyping to real-world pilots. [
        <xref ref-type="bibr" rid="ref2">2</xref>
        ] In
summary, the f&lt;a+i&gt;r network focuses on the following main objectives:
1. Build a body of quality research across international regions that creates multiple pathways
to pro-social feminist AI and ADM and uses human rights and design justice principles.
2. Foster new forms of multidisciplinary AI thinking and teamwork in order to catalyze
knowledge creation.
3. Incubate and grow a global south network of feminist scholars and multidisciplinary
experts to stimulate collaboration and extend the knowledge in the field.
      </p>
      <p>The project methodology regarding research and capacity building was based on the following
principles:</p>
      <p>From theory to action: the methodology moves beyond identifying "why" and "what" issues
exist in AI/ADM, and focuses on "how" to create concrete solutions. This involves
developing new AI/ADM tools, policies, and systems designed to promote social and
gender justice, improve quality of life, and rectify past exclusions.</p>
      <p>Design justice and collaboration: the most promising research ideas will be prototyped and
validated using design justice principles involving affected communities, academics,
activists, and technologists in the process, ensuring solutions are equitable and responsive
to real-world needs.</p>
      <p>Pilot and scale: successful prototypes will be piloted in partnership with public and private
sector entities, aiming to actively innovate and promote equity principles.</p>
      <p>Capacity building and regional focus: the methodology emphasizes strengthening regional
actors, building multidisciplinary teams, and fostering a deeper understanding of each
region's specific needs to leverage collective learning and strengthen the development of
"Feminist AI" within the global south.</p>
      <p>Furthermore, a “paper → prototype → pilot” methodology was followed. This approach prioritized
multidisciplinary collaboration, direct community input, and regional specificity, enabling the
development of algorithms and systems aimed at overcoming barriers to women's participation and
equality in the global south. Each stage took 6 months and they are briefly described next:</p>
      <p>Paper. Teams created scientific papers that outlined their project proposals based on
community need with the idea of advancing past the literature review stage, and qualify for
prototyping.</p>
      <p>Prototype. This phase involved intense user and community conversations to initially
create paper prototypes, in order to translate feminist AI research into real-world
applications. This phase also created multi-sector partnerships, and expanded the research
network, in preparation for the pilot phase.</p>
      <p>Pilot. In the pilot phase, research grantees received support to develop deployment
strategies, build sustainable partnerships, and actively demonstrate the real-world potential
of their Feminist AI concepts. This pilot phase emphasized collaborations with universities
and government to ensure the project's long-term growth and impact.
2.1.</p>
      <p>Administrative Structure
The &lt;A+&gt; Alliance is a global feminist coalition of technologists, activists, and academics, founded
in 2019 to revolutionize AI and Automated Decision-Making by centering the global south and
feminist principles. Its mission is to develop pro-social, gender-transformative technologies that
promote equality and inclusivity.</p>
      <p>In 2020, with support from the International Development Research Centre (IDRC, with head office
in Canada), they launched the Feminist AI Research Network (f&lt;a+i&gt;r&gt;). During 4 years from 2021
to 2024, Women at the Table (global civil society organization based in Geneva, Switzerland) and
Tecnológico de Costa Rica led the alliance, focusing on multilateral advocacy, notably through the
UN's Generation Equality Forum and the Commission on the Status of Women - CSW Expert
Group on Technology and Innovation. The f&lt;a+i&gt;r&gt; network also provided grants to cultivate
feminist AI research and collaboration in the global south.</p>
      <p>The alliance operated through decentralized regional hubs: Tecnológico Monterrey (Latin America
&amp; Caribbean), Chulalongkorn University (Southeast Asia), and the American University in Cairo
(Middle East &amp; North Africa). These hubs served as vital connectors, promoting feminist AI
concepts, building multidisciplinary teams, and addressing regional needs. They facilitated
knowledge sharing and nurtured the growth of Feminist AI in their respective areas (see Figure 1).
The hub leadership held weekly coordination meetings to strengthen global and regional networks,
enhance community engagement, foster collaborations, and provide mentorship through the
research-to-pilot process. These meetings facilitated knowledge exchange, iterative development,
and global collaboration on feminist AI.
The main outputs of the project include:</p>
      <p>Published papers: a list of 25+ published papers was achieved during the project span.
Papers were published in different places including peer-reviewed journals, conference
proceedings, and repositories such as Feminist AI Pub Pub (https://feministai.pubpub.org/).
See for instance [4], [5], [6], [7], [8].</p>
      <p>
        Outreach activities: a long list of specific activities including workshops, web summits,
webinars, expert group meetings and roundtables were organized either in person or
online. The activities focused on diverse subjects related to f&lt;a+i&gt;r, such as: AI and
equality, technology and innovation for gender equality, ethical technology, feminist
foreign policies, AI for international development, among many others (see [9], [10], [11]).
Case studies booklet. A booklet was produced with material including each team’s
self-evaluation of their research process, multidisciplinary work and methodology, as well
as successes and lessons learned [
        <xref ref-type="bibr" rid="ref2">2</xref>
        ], [12].
      </p>
      <p>AI &amp; Equality Toolbox: a project partially funded by f&lt;a+i&gt;r, which hosts a community of
students, academics, data scientists and AI practitioners who believe in the responsibility of
technology creators to prioritize human rights principles
(https://aiequalitytoolbox.com/community/).</p>
      <p>Due to the massive amount of activities and results produced by the f&lt;a+i&gt;r network we will focus
only on activities under direct responsibility of the Costa Rican Institute of Technology team. For
further information about the results of the network please check the references cited above or the
final technical report available at the IDRC Digital Library3.</p>
      <p>3.</p>
    </sec>
    <sec id="sec-3">
      <title>Organization for Managing Funds</title>
      <p>As part of the A+ Alliance the responsibility of our institution (Costa Rica Institute of Technology)
was in charge of managing the funds of the project. This alliance coordinated the project Feminist
AI Research f&lt;A+i&gt;r: Incubating Feminist AI: From Paper to Prototype to Pilot.</p>
      <p>The governance of the project included the A+ alliance and three partners identified as project
hubs in different regions of the planet. Chulalongkorn University in Thailand (SEASIA Hub),
Jordan Open Source Initiative en Jordania, later changed to the Access to Knowledge for
Development Center (MENA Hub), and the Tecnológico de Monterrey en Latinoamérica (LAT
Hub).</p>
      <p>Decisions on activities, procedures and budget were taken on weekly meetings of the A+ Alliance
with the hub leaders. Agreements on budget lines and execution were passed to TEC Costa Rica for
execution and in case of being needed communication with IDRC was established.
As part of the A+ Alliance, the participation of TEC Costa Rica consisted primarily of managing
funds and working as liaison between IDRC and the A+ Alliance and Hubs administration. Other
tasks included technical advisory on some of the projects.</p>
      <p>Within our institution, the project changed the team in charge at the end of the second year.
Namely, during the first two years, the team consisted of three people that after the second year
were replaced mostly due to political changes of the institution and personal decisions. For the
final year a new project leader assumed the project and the team was expanded to guarantee a
successful final stage of the project.</p>
      <p>The team of the second year consisted of Financial support &amp; liaison, Administrative support &amp;
liaison with FUNDATEC (a foundation associated with the university), the vice-rector office for
research and extension, a project leader, A+ Alliance liaison &amp; technical support, a scientific
advisor, and the FUNDATEC auditor. Other parties involved were the University Rector (contract
signature) and Costa Rican Technological Foundation (funds transfers and auditing).
The second-year team consisted of financial support and liaison, administrative support and liaison
with FUNDATEC (a foundation associated with the university), the vice-rector's office for research
and extension, a project leader, A+ alliance liaison and technical support, a scientific advisor, the
University Rector and liaison with the rector during the first stage of the project, and the
FUNDATEC auditor. Other parties involved were the University Rector (contract signature) and the
Costa Rica Technological Foundation (funds transfers and auditing).</p>
      <sec id="sec-3-1">
        <title>3.1. The project from funds perspective</title>
        <p>An initial budget was created at the beginning of the project officially approved by IDRC. This
budget was established using Costa Rican currency due to IDRC requirements (this later
complicated the fund management quite a bit). Budget execution and changes in budget lines were
3 https://idl-bnc-idrc.dspacedirect.org/server/api/core/bitstreams/6dbd23a2-1d21-45bb-b7af-2a3f6f816bcf/content
managed in weekly meetings of the A+ Alliances and hub coordinators. The budget lines changes
and funds execution were reviewed and approved through a financial report submitted at the end
of every year of the project to IDRC. This submission and approval process took about 3 months
and after the approval and advancement of the funds for the next year were transferred in
Canadian dollars (CAD).</p>
        <p>The budget consisted of three major components: A+ Alliance operation, hubs administration
operation, and Research. Payments for the A+ Alliance and hubs administrators were made yearly
as an advance payment. The research projects (papers, pilots, and prototypes) had independent
schedules requiring tracking the completion of the projects, review of deliverables, and payment.
In the first two years, research projects were approved by a scientific committee, whereas in the
last year this was done by the coordination committee. After the approval of a given project we
began to formalize project contracts. Local legislation required that the contracts were established
in Spanish, and a copy of the contract in English was provided to project teams to facilitate the
signature process. Each team provided contact information, project signatory person, usually the
institution leader, and finally bank transfer information.</p>
        <p>When the contracts were received back, they were sent to the Rector of the university for
signature. Finally, the information for the initial bank transfer was sent by our FUNDATEC liaison
to FUNDATEC to transfer the initial 50% of the funds. The final 50% of the funds were transferred
after the finalization of the projects: at this point we checked the completion of the deliverables
with technical support. The recommendation of the technical support was passed to evaluation and
approval of the project leader who authorized the final release of the funds, which should be
coordinated with FUNDATEC.</p>
      </sec>
    </sec>
    <sec id="sec-4">
      <title>4. Challenges and Opportunities</title>
      <p>This section addresses the main challenges and opportunities identified during the course of the
project.</p>
      <sec id="sec-4-1">
        <title>4.1. Main challenges</title>
        <p>As with any project, multiple challenges arose and were dealt with. In the following sections we’ll
describe the main challenges encountered.</p>
        <sec id="sec-4-1-1">
          <title>4.1.1 Changes in the work team</title>
          <p>From the administration point of view, the project went through two stages marked by the change
of the team in charge. The change took place at the end of the second year of the project and was
mainly due to personal and professional decisions by team members.</p>
          <p>One of the main challenges of the project was the sudden and frequent changes in the authorities
of the university, which changed even three times in a period of two years. The first change
occurred when the rector and two vice-rector resigned, an interim team assumed the leadership for
a six month period and then elections took place changing the full team in charge of the university
management. This delayed internal administrative procedures such as the replacement of team
participants, which required approval of the Vice-rector of research and extension office.</p>
        </sec>
        <sec id="sec-4-1-2">
          <title>4.1.2 Exchange rates</title>
          <p>The first team submitted the financial report of the second year and committed to get it approved.
This approval took far longer than expected due a change in IDRC grant manager and exchange
rate variations that proved to be a real complication during all the project, start to finish.
As the initial budget was made using Costa Rican currency (CRC), IDRC funds were transferred in
Canadian Dollars (CAD), but most of the transfers were made using US Dollars (USD). The Costa
Rican budget team was executed in CRC.</p>
          <p>During the first year, the team used a fixed exchange rate in order to guarantee numbers match the
initial budget and to simplify calculations on payments. This ad-hoc strategy also proved to be a
complication further down the project execution, since it required to make and remake multiple
times the financial reports following IDRC’s indications, delaying the advancement of money
needed to continue on schedule. For the second year the grant manager required the exchange rate
to be fixed to the day of each advancement transfer, linking transactions to advancements, and for
the final financial report it was required to use the exchange rate of the day in which the
transaction was made. This represented a significant effort that required to adjust all the
transactions of the three year duration of the project.</p>
        </sec>
        <sec id="sec-4-1-3">
          <title>4.1.3 Administrative delays</title>
          <p>Being the ones in charge with managing the budgets, a delay in the administrative procedures or
approval of financial reports would cause further delays for other partners. Legal and financial
reasons do not help the expected execution of the project by the other parties, who were very clear
about the disruption these delays were causing.</p>
          <p>As mentioned before, we managed payments for all 3 hubs, namely LAC, MENA and SEASIA and
the other partner of the A+Alliance located in Sweden, which involved coordinating
communications and payment deadlines in 4 different time zones. This was a bit challenging
because according to the contracts, specific timeframes (10 days) were set to comply with the
payments after finishing the projects, but the back and forth of emails sometimes took two or three
additional days.</p>
        </sec>
        <sec id="sec-4-1-4">
          <title>4.1.4 Contracts language</title>
          <p>Another issue arose when establishing contracts, as some institutions asked for contracts in their
own languages, which was impossible due to Costa Rican legislation. This issue delayed contract
signature and of course the beginning of the corresponding project, a particularly significant
problem in the last year of the project that did not allow for flexible deadlines as the grant agency
required all activities finished before the deadline of the project. Furthermore, in some cases, some
projects were not able to receive funds directly due to international restrictions, specially to the
MENA region. International restrictions did not apply to the project per se, rather national
legislation or policies restricted researchers of the MENA hub to participate in the network.</p>
        </sec>
        <sec id="sec-4-1-5">
          <title>4.1.5 Auditor and funding previsions</title>
          <p>Regarding specific issues of year three, at the end of the project an auditor was assigned to the
project by FUNDATEC. This assignment proved to be a great help in organizing and understanding
the complexities of the project, and especially in the preparation of the final financial report. Also,
IDRC grant officer let us know that the final 15% track of the project budget was going to be paid
after the approval of the final financial report. Most of the payments of the project were made in
advance, so no preparations were made to cover this final 15%. This required additional procedures
and paperwork to secure additional funding to cover that 15% by means of a loan, that was not
considered in the initial budget or as part of the strategic planification of the project.</p>
        </sec>
        <sec id="sec-4-1-6">
          <title>4.1.6 Outreach and promotion</title>
          <p>Finally, there were no planifications to promote and socialize results of the project at the local level
within our institution during the first two years of the project. A special assignment was made to a
local journalist to prepare a media package to correct this situation but a better coverage would
have been ideal. A local journalist received a specific assignment to develop a media package aimed
at rectifying this issue, although more comprehensive coverage would have been preferable.</p>
        </sec>
      </sec>
      <sec id="sec-4-2">
        <title>4.2. Main lessons learned</title>
        <p>After the end of the project valuable lessons were learned. Here we mention some of the most
relevant ones.</p>
        <p>Early involvement of an auditor is essential to establish accounting practices that allow the
generation of financial reports in an easy and timely manner. The initial absence of the auditor led
to the establishment of ad-hoc ways to manage expenses that ended increasing the workload and
general overhead causing unforeseen delays.</p>
        <p>The design of a clear communication and dissemination strategy for the project at an institutional
level is really important, as it enables better relations within the institutions and may end up
facilitating administrative procedures. The global communication plan worked well overall, but the
use of only English limited its reach and effectiveness locally.</p>
        <p>The effective exchange of knowledge and skills across local teams requires thorough preparation
and readiness. In academia, three years is a long commitment and personal priorities may change
or job opportunities may arise suddenly for some if not most of the team members. It is crucial to
set up a suitable infrastructure for teamwork support including management of: data, procedures,
legal records and general archival of information (meeting, agreements, etc). It is advisable to plan
for possible exits of one or more members of the team and not to rely on collective knowledge
when managing funds for very large projects.</p>
        <p>In a global project it is necessary to consider time in the schedule for administrative delays due to
time zone differences which may seem negligible but in the end they add up to sensible delays.
Also under the same category of administrative delays, it would be beneficial to somehow allocate
time to consider political changes within institutions, since for instance, in our case we passed
through three authorities changes, which inevitably causes delays since new persons are adapting
to their new roles.</p>
        <p>Finally, it is recommended to include in the strategic planning a budget reserve to be used when
waiting for financial reports to get approval. These reserves should be at least 10% of the total
amount of the budget.</p>
      </sec>
    </sec>
    <sec id="sec-5">
      <title>5. Conclusions and Future Work</title>
      <p>A project of large size such as f&lt;A+i&gt;r requires a team consisting of multiple professionals with
experience and time, which is not always possible. If the team is small or without much experience,
we summarize our conclusions and recommendations next:
●
●</p>
      <p>Prepare for team members leaving the project, even when you don’t foresee the possibility
of change in the near future. This preparation must include extra-documentation and
establishing mechanisms for redundant information knowledge and skills within the team.
Do not trust the collective memory of the group, especially if there are multiple teams in
different countries.</p>
      <p>Secure an administrative assistant for the project, which will work as a liaison with
university authorities, bureaucratic procedures and logistics. Normally, academics dislike
●
●
●
●
bureaucracy, and someone who manages this part of the project is essential to avoid
burnout and reduce the risk of team members leaving the project abruptly.</p>
      <p>Have a financial advisor, professional accountant or auditor involved early in the project
and manage financial information in a detailed manner with an specially designed format
for the project: do not rely only on the report templates provided by the funding agency.
This will allow the team to respond quickly to changes in the presentation of the financial
information required by the funding agencies grant managers. This internal format should
be required to use by all parties involved in the project including your direct partners. We
insist in not letting the financial information be available only in the financial reports or as
an endless list of uncategorized financial transactions, especially if the team members
change, this will reduce the amount of work needed for team member transitions.
Work with your funding agency to ensure that financial information will be managed with
a minimal set of different currencies, especially in this kind of international projects where
a unique currency is recommended for all parties involved.</p>
      <p>Risk management should be a priority for the project leader and administrative staff of the
project. Some of the most important elements to consider are: administrative delays in
fund transfers that will affect all other teams, and securing additional funding at the end of
the project to be able to execute funds that the funding agency will transfer only after the
approval of the final report.</p>
      <p>Finally, prepare to make noise. A communication strategy is essential and must be part of
the planning. For this project a global communication strategy was established at the
beginning of the project, nonetheless every partner should have in place a local
communication strategy within their own institutions and country. This has multiple
advantages as it will make the members of the team well known within the institution
facilitating administrative procedures and future projects.
f&lt;A+i&gt;r was a beautiful project with amazing results. The interactions between hub leaders, A+
Alliance partners, researchers and other people involved in the project did not only work towards
the creation of a Feminist AI but also towards the enrichment of all the team members and
organizations.</p>
    </sec>
    <sec id="sec-6">
      <title>Acknowledgements</title>
      <p>The authors acknowledge the A+ Alliance and the f&lt;a+i&gt;r network partners for their contributions
that made this publication possible. This work was also supported by TEC research project “FAIR:
Feminist AI Research f&lt;A+i&gt;r: Incubating Feminist AI: From Paper to Prototype to Pilot”. This
work was carried out with the aid of a grant from the International Development Research Centre,
Ottawa, Canada. The views expressed herein do not necessarily represent those of IDRC or its
Board of Governors.</p>
    </sec>
    <sec id="sec-7">
      <title>Declaration on Generative AI</title>
      <p>During the preparation of this work, the authors used Google Gemini and Grammarly for grammar
and spelling check. After using this tool, the authors reviewed and edited the content as needed
and take full responsibility for the publication’s content.
[3] M. L. M. Cordero, “TEC colaboró en iniciativa global para el desarrollo de inteligencia
artificial feminista y ética,” Hoy en el TEC. Accessed: Apr. 23, 2025. [Online]. Available:
https://www.tec.ac.cr/hoyeneltec/2024/09/25/tec-colaboro-iniciativa-global-desarrollo-intelige
ncia-artificial-feminista-etica
[4] L. Alonso Alemany et al., “Bias assessment for experts in discrimination, not in computer
science,” in Proceedings of the First Workshop on Cross-Cultural Considerations in NLP (C3NLP),
S. Dev, V. Prabhakaran, D. Adelani, D. Hovy, and L. Benotti, Eds., Dubrovnik, Croatia:
Association for Computational Linguistics, May 2023, pp. 91–106. doi:
10.18653/v1/2023.c3nlp-1.10.
[5] H. T. Biana, M. Jabar, H. Yabut, and R. Domingo, “Modified feminist self-defense: violence
against women in transit in Metro Manila,” J. Transp. Secur., vol. 16, no. 1, p. 11, Nov. 2023,
doi: 10.1007/s12198-023-00268-y.
[6] H. Maina, L. A. Alemany, G. Ivetta, M. Rajngewerc, B. Busaniche, and L. Benotti, “Exploring
Stereotypes and Biases in Language Technologies in Latin America,” Commun ACM, vol. 67,
no. 8, pp. 54–56, Aug. 2024, doi: 10.1145/3653322.
[7] M. Soudi, E. Ali, M. Bali, and N. Mabrouk, “Generative AI-Based Tutoring System for Upper
Egypt Community Schools,” in Proceedings of the 2023 Conference on Human Centered
Artificial Intelligence: Education and Practice, in HCAIep ’23. New York, NY, USA: Association
for Computing Machinery, Dec. 2023, pp. 16–21. doi: 10.1145/3633083.3633085.
[8] Red FAIR LAC, INTELIGENCIA ARTIFICIAL FEMINISTA Hacia una Agenda de Investigación
para América Latina y El Caribe. Editorial Tecnológica de Costa Rica, 2022. Accessed: Apr. 23,
2025. [Online]. Available: http://archive.org/details/inteligencia-artificial-feminista
[9] FCEI U. de Chile, Coloquio de Investigación 2023 “Chatbot feminista. Una aproximación desde el
codiseño participativo,” (May 10, 2023). Accessed: Apr. 23, 2025. [Online Video]. Available:
https://www.youtube.com/watch?v=5InoLUuvTSA
[10] “Global Toolkit on AI and the Rule of Law for the Judiciary.” Accessed: Apr. 23, 2025. [Online].</p>
      <p>Available: https://unesdoc.unesco.org/ark:/48223/pf0000387331/PDF/387331eng.pdf.multi
[11] Soraj Hongladarom, Inclusive AI and Design, (Sep. 18, 2023). Accessed: Apr. 23, 2025. [Online</p>
      <p>Video]. Available: https://www.youtube.com/watch?v=WOTtSncHMhI
[12] Red FAIR LAC, INTELIGENCIA ARTIFICIAL FEMINISTA Hacia una Agenda de Investigación
para América Latina y El Caribe. Editorial Tecnológica de Costa Rica, 2022. Accessed: Apr. 23,
2025. [Online]. Available: http://archive.org/details/inteligencia-artificial-feminista</p>
    </sec>
  </body>
  <back>
    <ref-list>
      <ref id="ref1">
        <mixed-citation>
          [1] “&lt;
          <string-name>
            <surname>Incubating Feminist</surname>
            <given-names>AI</given-names>
          </string-name>
          &gt; From paper to prototype · Feminist AI,” Fem.
          <source>AI</source>
          , Accessed: Oct.
          <volume>22</volume>
          ,
          <year>2024</year>
          . [Online]. Available: https://feministai.pubpub.org/incubating-feminist-ai
        </mixed-citation>
      </ref>
      <ref id="ref2">
        <mixed-citation>
          [2]
          <string-name>
            <given-names>C.</given-names>
            <surname>Kraft-Buchman</surname>
          </string-name>
          and
          <string-name>
            <given-names>J. S.</given-names>
            <surname>Peralta</surname>
          </string-name>
          , “
          <article-title>Advancing research on feminist artificial intelligence to advance gender equality and inclusion: final technical report</article-title>
          ,” Sep.
          <year>2024</year>
          , Accessed: Apr.
          <volume>09</volume>
          ,
          <year>2025</year>
          . [Online]. Available: https://hdl.handle.
          <source>net/10625/63547</source>
        </mixed-citation>
      </ref>
    </ref-list>
  </back>
</article>