        <article-title>Improving the Requirements Engineering Process through the Application of a Key Process Areas Approach</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>Mahmood Khan Niazi</string-name>
          <email>mkniazi@it.usyd.edu.au</email>
          <xref ref-type="aff" rid="aff0">0</xref>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
        <aff id="aff0">
          <label>0</label>
          <institution>I am thankful to Dr. Didar Zowghi Faculty of Information Technology, University of Technology Sydney for her time and guidance to complete this paper</institution>
        </aff>
        <aff id="aff1">
          <label>1</label>
          <institution>School of Information Technologies, University of Sydney</institution>
          ,
          <country country="AU">Australia</country>
        </aff>
      </contrib-group>
      <pub-date>
        <year>2002</year>
      </pub-date>
      <fpage>125</fpage>
      <lpage>139</lpage>
      <abstract>
        <p>The current software process improvement (SPI) standards have no specific section referring to requirements engineering (RE) process and they broadly treat it as a single activity in the overall development process. The RE process plays an important role in the software development process and its importance demands that it be recognized as a process in its own right and not simply as a phase of the software life-cycle. Research shows that in order to produce quality software greater attention must be given to the improvement of RE process. In this paper five key process areas (KPAs) have been identified from the research literature in order to improve the RE process. First, to support a goal-based approach in the RE process; second, to support the incremental and cyclical behaviours in the RE process; third, to encourage stakeholders involvement in the RE process; fourth, to support the management of RE process and fifth, to define a planning phase for the RE process. This research project aims to show that quality requirements will follow when the RE process supports these five KPAs. To implement these KPAs, a requirement elicitation, analysis and validation method (REAVM) is proposed. A framework has been developed from the research literature in order to evaluate the REAVM. A case study has also been conducted in order to test and evaluate the REAVM in the real world environment.</p>
      </abstract>
      <kwd-group>
        <kwd>Requirements engineering process</kwd>
        <kwd>Key process areas</kwd>
        <kwd>case study</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body>
    <sec id="sec-1">
      <title>1. Introduction</title>
      <p>
        Inaccurate, inadequate, or misunderstood requirements are the most common causes of poor
quality, cost overruns and late delivery of software systems (El Emam and Madhavji 1995).
Requirements problems are widely acknowledged to reduce the quality of software and to
impact on the effectiveness of the software development process (Sommerville 1996). Despite
the importance of requirements engineering, little work has been done on developing ways to
improve requirements process. Existing standards for SPI, i.e. Capability Maturity Model
(CMM)
        <xref ref-type="bibr" rid="ref4">(Paul et al 1993)</xref>
        ,
        <xref ref-type="bibr" rid="ref5">(Paul et al 1994)</xref>
        and ISO 9000 (Johnson 1993) series standards do
not address the requirements engineering adequately. There is no specific section referring to
requirements engineering in these standards and they consider requirements engineering as a
single activity in the development process. While “The importance of requirements engineering
demands that it be recognised as a complex process in its own right and not simply as a phase
of the software life-cycle”
        <xref ref-type="bibr" rid="ref11">(Sommerville et al 1997)</xref>
        .
      </p>
      <p>In this paper five KPAs have been identified from research literature in order to improve the
RE process. This research investigates the research question that: “If the five KPAs are
considered in the RE process then the RE process will be improved”. In order to address this
research question five KPAs have been implemented using a requirement elicitation, analysis
and validation method (REAVM). A process-oriented approach has been used as REAVM is
divided into five major phases and each process is an organised set of activities, which
transforms inputs to outputs. The objective is to achieve better results in the RE process and
enable requirements engineers to develop incrementally a more complete version of the
requirements document. A framework has been developed from the literature in order to
evaluate REAVM. A case study has also been conducted in order to see the behaviour of
REAVM in the real world environment.</p>
      <p>In Section 2 of the paper motivation and background is provided. In Section 3 different KPAs
are defined. REAVM is described in Section 4 while in Section 5 REAVM is evaluated through
framework and case study. Section 6 concludes the paper.</p>
    </sec>
    <sec id="sec-2">
      <title>2. Motivation and background</title>
      <p>
        Many software projects have failed because they contained a poor set of requirements (El
Emam and Madhavji 1995). No software process can keep delivery times, costs and product
quality under control if the requirements are poorly defined
        <xref ref-type="bibr" rid="ref10">(Sommerville et al 1998)</xref>
        . In order
to produce software, which closely matches the needs of an organisation, an application domain
and the stakeholders, great attention must be given to the RE process (Niazi 2000). The RE
process plays an important role in the software development process. The objective of a RE
process should be to develop a set of necessary, verifiable and attainable requirements, which
are acceptable to all the relevant stakeholders
        <xref ref-type="bibr" rid="ref10 ref13">(Kotonya and Sommerville 1998)</xref>
        .
Requirements engineering is an important process of the software life-cycle. It has been
observed that one can achieve better quality in software and systems development process if
the RE process is properly defined
        <xref ref-type="bibr" rid="ref10">(Sommerville et al 1998)</xref>
        and (El Emam and Madhavji
1995). Often the RE process is started without any planning, which results in poor quality
requirements and less control over the management of the whole RE process. A mismatch has
been observed between the problems experienced by industry and the techniques developed
from research in requirements engineering
        <xref ref-type="bibr" rid="ref11">(Sommerville et al 1997)</xref>
        . It is also observed that
many analysts have limited knowledge of the problem domain, which also results in poor
quality requirements and cost overruns
        <xref ref-type="bibr" rid="ref10 ref13">(Kotonya and Sommerville 1998)</xref>
        . Some examples of
fairly common problems with the RE process are as follows
        <xref ref-type="bibr" rid="ref11">(Sommerville et al 1997)</xref>
        ,
        <xref ref-type="bibr" rid="ref10 ref13">(Kotonya and Sommerville 1998)</xref>
        and (Hall et al 2001):
§
§
§
§
§
§
      </p>
      <p>Vague requirements</p>
      <p>Undefined requirements process
§ Inadequate requirements
traceability
Lack of stakeholder involvement.</p>
      <p>Business needs are not considered
Lack of requirements management
Lack of defined responsibilities
§
§
§
§
§</p>
      <sec id="sec-2-1">
        <title>The requirements do not reflect the real needs of the customers</title>
      </sec>
      <sec id="sec-2-2">
        <title>Requirements are inconsistent and/or</title>
        <p>incomplete
§ It is expensive to make changes to
requirements after they have been agreed</p>
      </sec>
      <sec id="sec-2-3">
        <title>There are misunderstandings between</title>
        <p>customers and software engineers</p>
      </sec>
      <sec id="sec-2-4">
        <title>Requirements growth</title>
      </sec>
      <sec id="sec-2-5">
        <title>Stakeholders communication problems</title>
        <p>
          The fundamental problems in requirements engineering have been identified by many
researchers e.g. (Hall et al 2001),
          <xref ref-type="bibr" rid="ref9">(Siddiqi and Chandra 1996)</xref>
          ,
          <xref ref-type="bibr" rid="ref1 ref3">(Nuseibeh and Easterbrook
2000)</xref>
          ,
          <xref ref-type="bibr" rid="ref1">(Nikula et al 2000)</xref>
          , (Morris et al 1998), (Kamsties et al 1998), and (El Emam and
Madhavji 1995). To highlight a few of these, Hall et al (2001) discussed the requirements
process problems in twelve software companies. Their main findings show that the
requirements process is a major source of problems in the software development process.
          <xref ref-type="bibr" rid="ref9">Siddiqi and Chandra (1996)</xref>
          and
          <xref ref-type="bibr" rid="ref3">Nuseibeh and Easterbrook (2000)</xref>
          outlined the ongoing
research in requirements engineering and its future directions.
          <xref ref-type="bibr" rid="ref9">Siddiqi and Chandra (1996)</xref>
          mentioned a gap between current research and practice and in order to reduce this gap they
suggested a continuous discussion between researchers and practitioners. Nikula et al (2000)
analysed the requirements engineering practices in different organizations. Nikula et al (2000)
conducted a survey with twelve small and medium enterprises in order to get some numerical
data on the knowledge of current requirements engineering practices and the desire to improve
them. They presented the results of an empirical survey showing that the problem is not in the
practitioners’ lack of desire for improvement but in the management not knowing that many
requirements engineering issues can be solved with standard practices that are well
documented in the literature. El Emam and Madhavji (1995) described a field study and the
results indicate that there are seven key issues of greatest concern that must be addressed in a
successful RE process improvement effort: package consideration, managing the level of detail
of functional process models, examining the current system, user participation, managing
uncertainty, benefits of case tools and project management capability.
        </p>
        <p>
          The Capability Maturity Model (CMM)
          <xref ref-type="bibr" rid="ref4">(Paul et al 1993)</xref>
          ,
          <xref ref-type="bibr" rid="ref5">(Paul et al 1994)</xref>
          and ISO 9000
(Johnson 1993) series of standards share a common concern with quality and process
management. There is no specific section referring to requirements engineering in these
standards. The CMM is a valuable model for SPI but it is very hard to gain benefits when it is
applied to the requirements process. Only requirements management is treated in details and is
identified as a KPA for level 2 (repeatable) processes. But requirements management is only
one area of the requirements process. CMM does not provide any specific section for the other
areas of the RE process, i.e. requirements elicitation, requirements negotiation and
requirements validation. There is also no particular section to requirements engineering in ISO
9000 series standards and they do not say much about the activities involved in eliciting,
analysing, negotiating and validating the requirements
Sommerville et al (1997) and (Sommerville et al (1998) have published the RE process
maturity model which has been derived from the existing standards and has three levels, i.e.
Level 1-Initial, Level 2-repeatable and Level 3-Defined. This model can be used to assess
current RE process and it provides a template for requirements engineering practice
assessment. This model does not provide any general methodology for the improvement of the
RE process. However, it also does not provide KPAs like CMM but rather it organizes
different requirements practices with various deliverables in the RE process.
Requirements engineering is an important process of the software life-cycle. As no current SPI
standards adequately address the issues of RE process and they broadly treat requirements
engineering as a single activity in the overall development process, therefore, research in the
area of RE process improvement lies at the very core of requirements engineering research.
        </p>
      </sec>
    </sec>
    <sec id="sec-3">
      <title>3. Improving the Requirements Engineering Process</title>
      <p>The major objective of this research project is to improve the RE process. Because if the RE
process is improved, quality requirements can be achieved and the real needs of the
stakeholders can be reflected.</p>
      <p>
        Like CMM
        <xref ref-type="bibr" rid="ref4">(Paul et al 1993)</xref>
        and
        <xref ref-type="bibr" rid="ref5">(Paul et al 1994)</xref>
        , the following five KPAs have been
identified from research literature. This research project aims to show that quality requirements
will follow when the RE process supports the following:
§
      </p>
      <sec id="sec-3-1">
        <title>To support a goal-based approach in the RE process</title>
        <p>
          Goals are the high level objectives of the business, organisation or system which provide a
framework for the desired system (Anton 1997). Goals denote the objectives a system must
meet
          <xref ref-type="bibr" rid="ref1 ref3">(Nuseibeh and Easterbrook 2000)</xref>
          . Goals are useful for organising and justifying
requirements. Goals have been introduced into requirements engineering for a variety of
reasons, i.e. requirements acquisition, relating requirements to the organisational and business
context, clarifying requirements, documenting requirements, dealing with conflicts, assisting the
management of change and driving the initial design
          <xref ref-type="bibr" rid="ref10 ref13">(Yu and Mylopoulos 1998)</xref>
          and
(Lamsweerde 2001). Goals set an agenda by which requirements are discovered, analysed and
documented
          <xref ref-type="bibr" rid="ref10">(Sommerville et al 1998)</xref>
          . Normally it is difficult for the stakeholders to fully
understand the requirements of the organisation or application domain but with clear goals a
good understanding can be obtained. By focusing on goals initially instead of broad
requirements, analysts enable stakeholders to communicate using a language based on concepts
with which they are both comfortable and familiar (Anton 1997).
        </p>
        <p>§</p>
      </sec>
      <sec id="sec-3-2">
        <title>To support the incremental and cyclical behaviours in the RE process</title>
        <p>
          Several studies
          <xref ref-type="bibr" rid="ref7">(Potts et al 1994)</xref>
          , (Boehm et al 1994),
          <xref ref-type="bibr" rid="ref11">(Sommerville et al 1997)</xref>
          and
          <xref ref-type="bibr" rid="ref10">(Sommerville et al 1998)</xref>
          strongly suggested that the requirements process is cyclical.
          <xref ref-type="bibr" rid="ref7">(Potts et
al 1994)</xref>
          have proposed a cyclical model, called the Inquiry Cycle that consists of three
iteratively repeated activities: expression, discussion and commitment. (Boehm et al 1994)
have proposed a requirements process model based on its spiral model of software
development (Boehm 1988), which establishes stakeholders’ “win” conditions and includes
steps in order to facilitate identification and negotiation of requirements trade-offs.
          <xref ref-type="bibr" rid="ref11">(Sommerville et al 1997)</xref>
          and
          <xref ref-type="bibr" rid="ref10">(Sommerville et al 1998)</xref>
          have also proposed a spiral model that
consists of three iterative activities: requirements elicitation, requirements analysis and
validation and requirements negotiation.
        </p>
        <p>
          The incremental behaviour is regarded as the most realistic approach to software development
for large-scale systems
          <xref ref-type="bibr" rid="ref6">(Pressman 1997)</xref>
          . Incremental behaviour uses an evolutionary approach
to development and contains the systematic and the 'development in steps' approach of the
traditional project life cycle (Sommerville 1996). Using this behaviour the functionality of the
system is produced and delivered to the customers in small increments which avoids the ‘Big
Bang’ effect, i.e. for a long time nothing happens and then, suddenly, there is a completely new
situation (Vliet 1993).
        </p>
        <p>§</p>
      </sec>
      <sec id="sec-3-3">
        <title>To encourage stakeholders involvement in the RE process</title>
        <p>
          In most case the concerned stakeholders are not involved in the RE process and their real needs
are not considered in the system
          <xref ref-type="bibr" rid="ref11">(Sommerville et al 1997)</xref>
          . Involving the stakeholders in the
development process can reduce their fear for example that the development of a software
system will result in loss of jobs. It is also possible that if a new system is installed in an
organisation without consulting the stakeholders, who would be affected by the system, then
they may feel that a new system is unnecessary and therefore they tend to not co-operate in its
specification. Stakeholders involvement in the RE process is one of the most important factors
that contribute to the success of the project
          <xref ref-type="bibr" rid="ref5 ref7 ref8">(Rauterberg and Strohm 1994)</xref>
          and (DeBillis and
Haapala 1995). With the stakeholders involvement less rework of the documentation items is
required, real requirements can be gathered and political conflicts are reduced (El Emam and
Madhavji 1995).
        </p>
        <p>§</p>
      </sec>
      <sec id="sec-3-4">
        <title>To support the management of RE process</title>
        <p>
          During the RE process new requirements emerge and existing requirements change at all stages
of the system development process. It is often the case that more than 50% of system’s
requirements will be modified before it is put into service
          <xref ref-type="bibr" rid="ref10 ref13">(Kotonya and Sommerville 1998)</xref>
          .
The RE process is a learning process, and ideas generated at one point may change at another
point. This evolution of requirements throughout the whole software development life cycle has
to be managed in order to ensure high-quality specifications. The management includes issues
such as information storage, organization, traceability and documentation. Requirements
management may look like an overhead in the RE process, but it is usually rewarded by better
customer satisfaction and lower system development costs.
        </p>
        <p>§</p>
      </sec>
      <sec id="sec-3-5">
        <title>To define a planning phase for the RE process</title>
        <p>Effective management of a software project depends on thoroughly planning the project
(Sommerville 1996). Normally the RE process is started without any planning and the
requirements engineers inevitably wish to start very quickly. The RE process will be an
unproductive exercise if started haphazardly and without planning. Particular attention should
be paid to the planning of the RE process.</p>
      </sec>
    </sec>
    <sec id="sec-4">
      <title>4. Implementation of five key process areas</title>
      <p>
        In order to implement the five KPAs a “Requirements Elicitation, Analysis and Validation
Method (REAVM)” has been developed. This method has a prescriptive nature because “a
good method should be prescriptive enough to be able to recommend what development activity
to do next”
        <xref ref-type="bibr" rid="ref2">(Nuseibeh 1994)</xref>
        . This method has been derived from the cyclical and incremental
models and has an iterative and feedback nature. The reason for the development of a method is
that a method is a systematic way of working by which one can achieve a desired result
        <xref ref-type="bibr" rid="ref12">(Wieringa 1996)</xref>
        . “A method provides a prescription for how to perform a collection of
activities, focusing on how a related set of techniques can be integrated, and providing
guidance on their use”
        <xref ref-type="bibr" rid="ref1 ref3">(Nuseibeh and Easterbrook 2000)</xref>
        . All the identified KPAs are
incorporated in this method
The development of a method is heavily dependent on a thorough definition of its processes,
roles, activities and interactions. Further recent trends, focusing on process technology, have
confirmed that a quality product can only be the result of a quality process (Aliee 1996). Thus a
process-oriented approach to method definition has been selected as the basis for this research
project. REAVM is divided into five major phases and each phase is an organised set of
activities which transforms inputs to outputs. Each phase takes an input, adds value to it and
provides an output. The output of a phase is used as an input for the next phase and so on.
      </p>
      <sec id="sec-4-1">
        <title>4.1.The structure of REAVM</title>
        <p>REAVM is derived from the cyclical and incremental models and is divided into five phases
(as shown in Figure 1):
§
§
§</p>
        <p>Planning.</p>
        <p>Requirements elicitation.</p>
        <p>Requirements analysis.</p>
        <p>§
§</p>
        <sec id="sec-4-1-1">
          <title>Requirements agreement.</title>
        </sec>
        <sec id="sec-4-1-2">
          <title>Requirements validation.</title>
        </sec>
      </sec>
      <sec id="sec-4-2">
        <title>4.2 The cyclical behaviour of REAVM</title>
        <p>
          Figure 2 illustrates proposed cyclical model that has been abstracted from different studies
          <xref ref-type="bibr" rid="ref7">(Potts et al 1994)</xref>
          , (Boehm et al 1994),
          <xref ref-type="bibr" rid="ref11">(Sommerville et al 1997)</xref>
          and
          <xref ref-type="bibr" rid="ref10">(Sommerville et al 1998)</xref>
          .
It is cyclical in that requirements become apparent from successive iterations in the context of
the requirements which emerge from previous iterations. Hence requirements which emerge in
the later iteration may limit requirements which emerge in the previous iteration. Therefore,
requirements may need to be modified in the light of information which emerges later.
        </p>
        <p>Stakeholders
Final requirements document</p>
        <p>Validation</p>
        <p>Consolidation</p>
        <p>Agreement Pre-review checking
checklists and Review by the DE, UR</p>
        <p>final and the analyst
requirements Agreement
statement New goals</p>
        <p>Goal Performa and
problems
In this cyclical model, five activities are repeated each iteration of the REAVM cycle. This
model works at two levels: Firstly, only one goal is considered for REAVM cycle. After first
cycle of REAVM, if sufficient information is not collected or some conflicts are still not
resolved then the same goal is re-considered for the second cycle of REAVM and so on.
Through this cyclical behaviour requirements will become apparent and it is possible that the
requirements generated in the later iteration may limit requirements generated in the previous
iteration. Secondly, after the completion of first goal then the second goal is considered for
REAVM cycle and as mentioned earlier requirements which emerge in the iteration of second
goal may limit requirements which emerged in the iteration of first goal. Hence requirements
elicited in each cycle of REAVM are validated with the previous elicited requirements for
consistency, completeness and feasibility.</p>
        <sec id="sec-4-2-1">
          <title>Initial requirements statement</title>
          <p>Elicitation
Analysis
Validation
Goal
Planning
Agreement</p>
        </sec>
        <sec id="sec-4-2-2">
          <title>Analysis Checklist</title>
        </sec>
        <sec id="sec-4-2-3">
          <title>Consolidated</title>
          <p>requirements document</p>
        </sec>
        <sec id="sec-4-2-4">
          <title>Final requirements statement Figure 2: Cyclical behaviour of REAVM 131</title>
        </sec>
      </sec>
      <sec id="sec-4-3">
        <title>4.3 Incremental behaviour of REAVM</title>
        <p>This method assumes that the requirements for large systems are incrementally gathered,
analysed and validated using multiple builds as shown in Figure 3. The initial planning for
build-1 is performed at the beginning of the project. Further planning is performed as and when
required, as new goals can emerge during different phases. The next three phases, elicitation,
analysis, and agreement are performed once for each build. The last phase, validation, is
performed after each build. This shows the incremental behaviour.</p>
        <sec id="sec-4-3-1">
          <title>Build-1</title>
        </sec>
        <sec id="sec-4-3-2">
          <title>Build-N</title>
        </sec>
        <sec id="sec-4-3-3">
          <title>Delivery of build-1</title>
        </sec>
        <sec id="sec-4-3-4">
          <title>Delivery of build-N</title>
        </sec>
      </sec>
      <sec id="sec-4-4">
        <title>4.4 Planning phase</title>
        <p>This is the first phase of REAVM. The aim of this phase is to provide some planning for the
subsequent phases of REAVM.</p>
        <p>Four types of stakeholders are identified during planning phase, i.e. the executive sponsor, the
analyst, the domain experts (DEs) and the user representatives (URs). The executive sponsor is
the manager or executive who is responsible for making executive level decisions and
commitments. The analyst is responsible for different tasks of REAVM. A domain expert is a
person who can provide detailed information on a narrow, well-defined topic. They have the
best available view of a particular domain area.</p>
        <p>In order to implement goal-based approach, the goal Performa (GP) is introduced in REAVM
to establish the goal and the flow of that goal from each DE and UR. According to
(Sommerville 1996) simple diagrams, supplemented by descriptions of the system entities, are
the appropriate starting points for describing system contexts. The GP is constructed by
assuming that the stakeholders have goals in their minds. One example of the GP is shown in
Table 1.</p>
        <p>In the planning phase different essential tasks are performed by the analyst, i.e. goal
identification, goal prioritisation, team organisation, assigning of responsibilities and
preparation of different materials to be used in different phases of REAVM. Teams are
organised according to the goals. Responsibilities are assigned to different stakeholders for
elicitation, analysis, agreement and validation phases. Also some materials are prepared which
can be used during different phases of REAVM. This material also contains the question lists to
be used during the elicitation phase.</p>
      </sec>
      <sec id="sec-4-5">
        <title>4.5 Requirements elicitation phase</title>
        <p>The goals which are created in the initial planning phase are taken as input. The goal which has
the highest priority number is considered first for elicitation and so on. The following steps are
performed in this phase:
§
§
§</p>
        <p>Defining high-level requirements.</p>
        <p>Determining the scope of the requirements.</p>
        <p>Generation of initial requirements statements.
6
Modification of AL1
Modification of application for licence (production) AL1</p>
        <p>Central Excise Circles, Domain Expert (AL1) and User Rep. (AL1)
The activity for collection of excise duty starts with an application for</p>
        <p>commencement of business, production. The application is lodged
circle office on prescribed forms (AL1) for issuing of licence
The current AL1 form does not contain all the required information</p>
        <p>Submission of an
application for Licence AL1</p>
        <p>Validity</p>
        <p>Yes
Issue Licence (L1)</p>
        <p>No
Source Name: Domain Expert (AL1)
The analyst facilitates the group discussions that elicit the requirements. In order to implement
stakeholders involvement KPA, the participants are encouraged to bring different ideas and
views about different problems. Participants are also invited to express their viewpoints about
any of the problems. Different questions are asked from each DE and UR using the lists of
questions prepared in the initial planning phase. Every participant is allowed to present his
viewpoint, if required.</p>
        <p>Through carefully facilitated discussions, the ideas and views about the above topics are
presented, examined and refined, so that by the end of the elicitation phase everyone is in
agreement. If necessary, interviews can be conducted with those who are not participating in
the meeting but they have some relation with the goal under consideration.</p>
        <p>At the end of the elicitation phase an initial requirements statement (as shown in Table 2) is
generated for each goal by the analyst and is given to each DE and UR for analysis and
discussion. It is important to note that in order to manage the requirements effectively each goal
has a unique identifier and all the requirements under that goal have their own identifiers. So
any requirement under a specific goal can be referred in any requirements document.</p>
      </sec>
      <sec id="sec-4-6">
        <title>4.6 Requirements analysis phase</title>
        <p>The goal of this phase is to find problems in the initial requirements statements generated in the
requirements elicitation phase of REAVM.</p>
        <p>In the requirements analysis phase the following types of checking is performed using the
analysis checklist (available from the author):
§ Completeness checking.
§ Necessity checking.</p>
        <p>§ General comments.</p>
        <p>
          Stakeholders analysed the requirements for completeness. Completeness means that no
requirements that are needed have been omitted, i.e. whether the elicited requirements have
covered all of the needs and objectives of the organisation, application domain and
stakeholders
          <xref ref-type="bibr" rid="ref10 ref13">(Kotonya and Sommerville 1998)</xref>
          ? An initial requirements statement can be
considered as complete when all of its parts are present and no postponed decision or no “to be
defined” statements, still exist. In completeness checking the incomplete requirements are
pinpointed.
Stakeholders analysed the requirements to see if the elicited requirements contribute to the
business goals of the organisation, i.e. whether the elicited requirements satisfy the needs and
objectives of the organisation, application domain and stakeholders. It is also analysed to
ascertain whether the elicited requirements are in fact necessary and solve the specific
problems.
        </p>
        <p>At the foot of the analysis checklist the stakeholders have to provide general comments about
the initial requirements statement. In general comments the stakeholders give their point of view
about the elicited requirements and mention whether or not they agree with the elicited
requirements, or want further modification. If they want further modification then that
modification is specified. They can also mention new goals, if any have emerged during the
elicitation and analysis phases.
6
Modification of AL1
Modification of application for licence (production) AL1</p>
        <p>Central Excise Circles, Domain Expert (AL1) and User Rep. (AL1)
The activity for collection of excise duty starts with an application for
commencement of business, production. The application is lodged with
circle office on prescribed forms (AL1) for issuing of licence</p>
        <p>The current AL1 form does not contain all the required information
the
Problems:
Elicited Requirements:
Requirement 1: The AL1 form shall be updated to contain all the required information and the new AL1
form shall contain the following production unit information:
Circle name, unit national tax number, unit licence number, unit name, unit address, unit telephone number,
unit fax number, unit paid up capital, unit licence expiry date.</p>
        <p>Requirement 2: Details regarding ownership:
• If an individual is the owner of the unit, then his national tax number, NIC number, name, address,
telephone number, fax number and email address shall be provided.
• If the unit is Registered Firm then the registration number, date of registration, expiry date and
issuance authority for the firm shall be provided.
…….
……..</p>
        <p>Requirement n: ________________</p>
      </sec>
      <sec id="sec-4-7">
        <title>4.7 Requirements agreement phase</title>
        <p>The agreement phase is the process of discussing the issues/problems pointed out by the DEs
and URs in the requirements analysis phase of REAVM and finding some agreement with which
all of the stakeholders can live. All the analysis checklists are discussed individually and the
objective of discussion is to solve the issues in particular checklist. All the stakeholders are
encouraged to give comments on the problems identified and the recommendations made by
them in different analysis checklists. Solutions are identified and issues are resolved to the
satisfaction of the parties involved. Generally, this will involve deletion of some requirements
and making changes to some of the requirements in order to improve them.</p>
        <p>In many cases, it is possible that some questions may be raised which cannot be answered, and
for which the stakeholders may not agree with the proposed solutions. This means that the
information available for the agreement is insufficient. In such cases, the unresolved issues are
forwarded again to another round of REAVM.</p>
        <p>If some new goals emerge then it is decided in the agreement phase whether these newly
emerged goals require some planning or not. If these goals do not require planning then these
goals are considered for elicitation. If these goals require planning then they are considered for
planning separately, i.e. these new goals should not be mixed up with those goals whose initial
planning has been performed.</p>
        <p>This phase is concluded by reviewing with the participants the information collected and the
decisions made. At the end of this phase, the final requirements statements (as shown in Table
3) and the agreement checklists (available from the author) are generated and forwarded to the
validation phase for validation and discussion.</p>
        <p>Goal Number: ___ Goal Name: ______ Description of Goal : ____
Final Elicited Requirements:
Requirement 1:</p>
        <p>Requirement n:</p>
      </sec>
      <sec id="sec-4-8">
        <title>4.8 Requirements validation phase</title>
        <p>This is the final phase of REAVM. In REAVM only one goal is considered for elicitation,
analysis and agreement at any one time. It is therefore possible that some infeasibility,
inconsistency and incompleteness may exist when all the goals are consolidated into one
document. It is also possible that some previous requirements may change because the
customers can change their minds, or even the environment of the system, laws or regulations
might change. Therefore, the objective of this phase is to check and remove such infeasibility,
inconsistency or incompleteness and to modify the changed requirements to the new
requirements.</p>
        <p>The final requirements statements generated in the agreement phase of REAVM are
consolidated into one requirements document after each cycle or build. Each goal has its own
serial number, so using this serial number all the final requirements statements are consolidated
sequentially into one document.</p>
        <p>The DEs and URs read and analyse the requirements document and look for different problems
e.g. changed requirements, inconsistencies, incompleteness and infeasibility. They note
different problems in the validation checklist-1 (available from the author). Each reviewer
notes the different problems identified by him in a separate validation checklist. They also give
recommendations for the solution of identified problems. After the completion of validation
checklists-1, each checklist is forwarded to the analyst with requirements document for cross
checking.</p>
        <p>The analyst reads and analyses the requirements document and each validation checklist-1. By
using his knowledge and understanding of the system the analyst looks at different problems and
recommendations given in the checklists. He gives comments on them using validation
checklist-2 (available from the author).</p>
        <p>Finally, these validation checklists are discussed, and agreed actions are performed. If some
requirements are incomplete then for those specific requirements the elicitation, analysis,
agreement and validation phases can be performed again. If some requirements are inconsistent
then meetings are held between the stakeholders, whose requirements are inconsistent, in order
to reach agreement and to remove these inconsistencies. If some requirements are infeasible
then those requirements are modified or eliminated and if some requirements are changed then
those requirements are modified according to new requirements.</p>
      </sec>
    </sec>
    <sec id="sec-5">
      <title>5. Evaluation of REAVM</title>
      <sec id="sec-5-1">
        <title>5.1. Evaluation of REAVM using framework</title>
        <p>
          REAVM has been evaluated using the evaluation framework developed from the research
literature
          <xref ref-type="bibr" rid="ref11">(Sommerville et al 1997)</xref>
          ,
          <xref ref-type="bibr" rid="ref10">(Sommerville et al 1998)</xref>
          and (El Emam and Madhavji
1995). This framework has been developed using five main criteria. First, it should be geared
to the RE process; second, it should clearly differentiate between the stages of RE process;
third, its dimensions should be well used and well known; fourth, it should have basic
objective to improve/assess the RE process and fifth, it should incorporate the objectives of
this research project. This framework has 4 components and 28 dimensions and provides a very
practical framework with which to evaluate the REAVM. Against each dimension, one of the
following assessments is made.
        </p>
        <p>•
•
•</p>
        <p>Fulfils criteria. This means that the dimension fully describes the process or practice
that has a documented standard in REAVM.</p>
        <p>Partially fulfils criteria. This means that the dimension partially describes the
process or practice.</p>
        <p>Do not Fulfils criteria. This means that the dimension does not describe the process
or practice.</p>
        <p>As a whole, the REAVM performed well in the assessment criteria using the framework. An
overview of the REAVM evaluation using the framework is shown in Table 4. Out of 28
dimensions 18 fulfilled the criteria, 3 partially fulfilled the criteria and 7 did not fulfil the
criteria. REAVM fulfilled 64% of the criteria, partially fulfilled 11% of the criteria and did not
fulfil 25% of the criteria as shown in Figure 4.</p>
        <p>Evaluation of REAVM using framework
Do not Fulfil</p>
        <p>Criteria</p>
        <p>25%
Partially Fulfils</p>
        <p>Criteria
11%</p>
        <p>
          Fulfils Criteria
64%
In the requirements process maturity model of
          <xref ref-type="bibr" rid="ref11">(Sommerville et al 1997)</xref>
          and
          <xref ref-type="bibr" rid="ref10">(Sommerville et al
1998)</xref>
          , in order to assess the requirements process maturity, different points are scored to the
specified guidelines, i.e. 3 points are scored for standardized practice, 2 for normal use, 1 for
discretionary use and 0 for practices that are never used. The assessment criteria has been
adopted from the above model where the requirements process is considered matured if it gets
more than 55 points (50%) in the basic guidelines. If roughly 50% is considered an average
success criterion then satisfactory results have been achieved.
        </p>
      </sec>
      <sec id="sec-5-2">
        <title>5.2 Case study</title>
        <p>A case study was conducted at the XYZ Company. The main purpose of the company is to
enhance the efficiency and effectiveness of the Information Systems prevailing in public and
private sectors. This study was conducted in order to test and evaluate the REAVM in the real
Components</p>
        <p>Dimensions
Elicitation and Recording requirements sources
Planning for the Prioritising requirements</p>
        <p>REP. Developing system model</p>
        <p>Identifying stakeholders
Assigning of responsibilities
Examining the current system
Requirements elicitation
Use business concerns to drive requirements</p>
        <p>8</p>
        <p>Sub Total
Stakeholders
involvement in
the REP.
world environment. The case study was carried out with three main objectives. First, to test the
validity of REAVM. Second, to highlight areas where the REAVM has deficiencies. Third, to
show the practicality of REAVM in use. Before commencing the case study the introduction, its
purpose and relevant documentation of REAVM were provided to the XYZ Company. Group of
8 people and one team leader were selected for this case study by the authorities of XYZ
Company. The team leader communicated with the author through email for one month in order
to get good understanding of REAVM. Before commencing the study one week REAVM
training was provided to the stakeholders nominated for this case study.</p>
        <p>
          Fulfils
Criteria
In this case study, 8 goals were collected from the stakeholders. Then these goals were
prioritised and teams were organised and responsibilities were assigned to different
stakeholders. A separate initial requirements statement was generated for each goal. Each
initial requirements statement was analysed using separate analysis checklists. Issues raised in
the analysis checklist were resolved using an agreement checklist and a separate final
requirements statement was generated for each goal. All the final requirements statements were
consolidated into a final requirements document and this final requirements document was
reviewed by the DEs, URs and analyst using validation checklists. Finally, sixty-six
requirements were generated from these 8 goals.
At the end of this case study, a requirements review process was carried out by the
stakeholders who were involved in the case study in order to compare the REAVM with the
method used previously by XYZ Company. Author worked as an observer in this process. This
process contained four checklists, i.e. requirements elicitation, requirements modelling,
requirements verification and requirements management (available from the author). These
checklists have been developed using different literature (El Emam and Madhavji 1995),
          <xref ref-type="bibr" rid="ref11">(Sommerville et al 1997)</xref>
          <xref ref-type="bibr" rid="ref10">(Sommerville et al 1998)</xref>
          and
          <xref ref-type="bibr" rid="ref10 ref13">(Kotonya and Sommerville 1998)</xref>
          .
Each checklist were jointly completed by all the stakeholders who were involved in the case
study and at the end of this process a report was produced which compare REAVM with the
standard method used by the XYZ Company. Again the assessment criteria was adapted from
          <xref ref-type="bibr" rid="ref11">(Sommerville et al 1997)</xref>
          and
          <xref ref-type="bibr" rid="ref10">(Sommerville et al 1998)</xref>
          . In these checklists 4 points were given
to the guidelines which were very well defined, 3 points were given to the guidelines which
were adequately defined, 2 points were given to guidelines which were less than adequately
defined, 1 point was given to guidelines which were not defined very well and zero point was
given to guidelines which were not applicable.
        </p>
        <p>As a whole, the REAVM did not perform exceptionally well when compared with the method
used by XYZ Company. A column chart is shown in Figure 5 where REAVM satisfied 70.23%
of the criteria and XYZ Company satisfied 55.95% of the criteria. Although REAVM did not
perform exceptionally well when compared with the method used by XYZ Company but it was
observed that the method followed by XYZ Company has some deficiencies, which have been
overcome in REAVM. Some of the important properties which have not been considered in the
methodology followed by XYZ Company are: consideration of sources of requirements for the
traceability, consideration of goals for the derivation of requirements, management of new
goals, unique identification of requirements for effective management, classification of
requirements and use of checklists and interaction matrix for the verification of collected
requirements. These deficiencies have been overcome in REAVM where sources of
requirements have been recorded in REAVM using GPs, a goal-based approach has been used
in REAVM in order to derive, analyse and document different requirements, new goals have
been managed by the use of checklists, requirements have been classified into related goals,
different checklists have been used in order to validate different requirements. In addition to all
these improvements stakeholders actively participated in all the phases of REAVM. A planning
phase has helped in the management of the whole REAVM process. Incremental and cyclical
behaviours have helped in the generation of requirements in steps and avoided the ‘Big Bang’
effect. Requirements management has given more control to the monitoring and effectively
generating different kinds of REAVM statements.</p>
        <p>C o m p a r i s o n o f R E A V M w i t h X Y Z C o m p a n y
1 0 0 . 0 0 %
8 0 . 0 0 %
6 0 . 0 0 %
4 0 . 0 0 %
2 0 . 0 0 %
0 . 0 0 %</p>
      </sec>
    </sec>
    <sec id="sec-6">
      <title>6. Conclusions</title>
      <p>For the improvement of RE process five KPAs were considered and it was believed that if
these KPAs have been considered then the RE process will be improved. To check whether RE
process has been improved or not it is important to check the results, which have been achieved
by using the framework and by conducting the case study. By using the framework, REAVM
achieved satisfactory results but in case study REAVM did not perform exceptionally well
when compared with the method used by XYZ Company.</p>
      <p>As a whole REAVM performed fairly well. It is believed that the KPAs selected for the
improvement of RE process are the best cluster in order to enhance the capability of the RE
process but the way these KPAs are structured into REAVM need further refinement and
improvement. It is also believed that REAVM can be further improved through large-scale case
studies.</p>
    </sec>
    <sec id="sec-7">
      <title>REFERENCES</title>
      <p>Aliee Shams Fereidoon (1996) Modelling the Behaviour of Processes using Collaborating</p>
      <p>Objects, PhD thesis, University of Manchester, Computer Science Department.
Anton Annie (1997) Goal Identification and Refinement in the Specification of
Software</p>
      <p>Based Information Systems, PhD thesis, Georgia Institute of Technology.</p>
      <p>Boehm B. W., Bose P., Horowitz E. and Lee M-J (1994) Software requirements as negotiated
win conditions, First International Conference on Requirements Engineering, 74-83.
Boehm B. W. (1988) A Spiral Model of Software Engineering Development and Enhancement,</p>
      <p>IEEE computer, 21(5), 61-72.</p>
      <p>DeBillis M., and Haapala C. (1995) User-Centric Software Engineering, IEEE Expert, 10(1),
34-41.</p>
      <p>El Emam Khalid and Madhavji H. Nazim (1995) A Field Study of Requirements Engineering
Practices in Information Systems Development, Second International Symposium on
Requirements Engineering, 68-80.</p>
      <p>Gonzoles M. Regina (1997) A Model Based Requirements Elicitation Method, The High</p>
      <p>Integrity Software Conference, Albuquerque, N.M.</p>
      <p>Gonzoles M. and Wolf L. Alexander (1996) A Facilitator Method for Upstream Design
Activities with Diverse Stakeholders, Second International Conference on
Requirements Engineering, 190-197.</p>
      <p>Hall Tracy, Beecham Sarah and Rainer Austen (2002) Requirements problems in twelve
software companies: An empirical analysis, IEE Proceedings- Software, August 2002.
Johnson P. (1993) ISO 9000 Meeting the New International Standards, McGraw-Hill.
Kamsties Erik, Hormann Klaus and Schlich Maud (1998) Requirements Engineering in Small
and Medium Enterprises, Requirements Engineering, 3(2), 84-90.</p>
      <p>Kotonya Gerald and Sommerville Ian (1998) Requirements Engineering Processes and</p>
      <p>Techniques, John Wiley &amp; Sons.</p>
      <p>Lamsweerde Axel van (2001) Goal-Oriented Requirements Engineering: A Guided Tour,
Proceedings of the 5th International Symposium on Requirements Engineering,
249261, IEEE CS Press.</p>
      <p>Macaulay Linda (1993) Requirements Capture as a Co-operative Activity, First International</p>
      <p>Symposium on Requirements Engineering, 174-181.</p>
      <p>Morris Philip, Masera Marcelo and Wilikens Marc (1998) Requirements Engineering and
Industrial Uptake, Third International Conference on Requirements Engineering,
130137.</p>
      <p>Niazi Mahmood (2000) A Method to Improve the Requirements Engineering Process, Fifth</p>
      <p>Australian Workshop on Requirements Engineering, 23-36.</p>
      <p>Sommerville I. (1996) Software Engineering Fifth Edition, Addison-Wesley.
Vliet Van Hans (1993) Software Engineering – Principles and Practice, John Wiley and Sons.</p>
    </sec>
    <sec id="sec-8">
      <title>Acknowledgments</title>
    </sec>
  </body>
  <back>
    <ref-list>
      <ref id="ref1">
        <mixed-citation>
          <string-name>
            <given-names>Nikula</given-names>
            <surname>Uolevi</surname>
          </string-name>
          , Fajaniemi Jorma and Kalviainen
          <string-name>
            <surname>Heikki</surname>
          </string-name>
          (
          <year>2000</year>
          )
          <article-title>Management View on Current Requirements Engineering Practices in Small and Medium Enterprises</article-title>
          , Fifth Australian Workshop on Requirements Engineering,
          <fpage>81</fpage>
          -
          <lpage>89</lpage>
          .
        </mixed-citation>
      </ref>
      <ref id="ref2">
        <mixed-citation>
          <string-name>
            <given-names>Nuseibeh</given-names>
            <surname>Bashar</surname>
          </string-name>
          (
          <year>1994</year>
          )
          <article-title>A Multi-Perspective Framework for Method Integration</article-title>
          ,
          <source>PhD thesis</source>
          , Imperial College of Science, Technology and Medicine, University of London, Department of Computing.
        </mixed-citation>
      </ref>
      <ref id="ref3">
        <mixed-citation>
          <string-name>
            <given-names>Nuseibeh</given-names>
            <surname>Bashar</surname>
          </string-name>
          and
          <string-name>
            <surname>Easterbrook S.</surname>
          </string-name>
          (
          <year>2000</year>
          )
          <article-title>Requirements Engineering: a roadmap</article-title>
          ,
          <source>Proceedings of International Conference on Software Engineering (ICSE-2000)</source>
          ,
          <year>June 2000</year>
          .
        </mixed-citation>
      </ref>
      <ref id="ref4">
        <mixed-citation>
          <string-name>
            <given-names>Paul</given-names>
            <surname>Mark</surname>
          </string-name>
          , Weber Charles, Curtis Bill and Chrissis
          <string-name>
            <surname>Mary</surname>
          </string-name>
          (
          <year>1993</year>
          )
          <article-title>Capability Maturity Model for software</article-title>
          ,
          <source>Version</source>
          <volume>1</volume>
          .1, CMU/SEI-93
          <string-name>
            <surname>-</surname>
          </string-name>
          TR-
          <volume>24</volume>
          , Software Engineering Institute USA.
        </mixed-citation>
      </ref>
      <ref id="ref5">
        <mixed-citation>
          <string-name>
            <given-names>Paul</given-names>
            <surname>Mark</surname>
          </string-name>
          , Weber Charles, Curtis Bill and Chrissis
          <string-name>
            <surname>Mary</surname>
          </string-name>
          (
          <year>1994</year>
          )
          <article-title>The Capability Maturity Model: Guidelines for Improving the Software Process</article-title>
          , Addision-Wesley.
        </mixed-citation>
      </ref>
      <ref id="ref6">
        <mixed-citation>
          <string-name>
            <surname>Pressman S. Roger</surname>
          </string-name>
          (
          <year>1997</year>
          )
          <article-title>Software Engineering - A Practitioner's Approach, The McGrawHill Companies</article-title>
          , Inc.
        </mixed-citation>
      </ref>
      <ref id="ref7">
        <mixed-citation>
          <string-name>
            <given-names>Potts C.</given-names>
            ,
            <surname>Takahashi</surname>
          </string-name>
          <string-name>
            <given-names>K.</given-names>
            , and
            <surname>Anton</surname>
          </string-name>
          <string-name>
            <surname>A.</surname>
          </string-name>
          (
          <year>1994</year>
          )
          <article-title>Inquiry-Based Requirements Analysis</article-title>
          ,
          <source>IEEE Software</source>
          ,
          <volume>11</volume>
          (
          <issue>2</issue>
          ),
          <fpage>21</fpage>
          -
          <lpage>32</lpage>
          .
        </mixed-citation>
      </ref>
      <ref id="ref8">
        <mixed-citation>
          <string-name>
            <surname>Rauterberg</surname>
            <given-names>M.</given-names>
          </string-name>
          and
          <string-name>
            <surname>Strohm</surname>
            <given-names>O.</given-names>
          </string-name>
          (
          <year>1994</year>
          )
          <article-title>About the Benefits of User-Oriented Requirements Engineering</article-title>
          ,
          <source>Proceedings of the First International Workshop on Requirements Engineering: Foundation of Software Quality (REFSQ'94).</source>
        </mixed-citation>
      </ref>
      <ref id="ref9">
        <mixed-citation>
          <string-name>
            <given-names>Siddiqi</given-names>
            <surname>Jawad and Chandra Shekaran</surname>
          </string-name>
          (
          <year>1996</year>
          )
          <article-title>Requirements Engineering: The Emerging Wisdom</article-title>
          , IEEE Software,
          <volume>13</volume>
          (
          <issue>2</issue>
          ),
          <fpage>15</fpage>
          -
          <lpage>19</lpage>
          .
        </mixed-citation>
      </ref>
      <ref id="ref10">
        <mixed-citation>
          <string-name>
            <surname>Sommerville</surname>
            <given-names>I.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Sawyer</surname>
            <given-names>P.</given-names>
          </string-name>
          and
          <string-name>
            <surname>Viller</surname>
            <given-names>S.</given-names>
          </string-name>
          (
          <year>1998</year>
          )
          <article-title>Improving the Requirements Process</article-title>
          , Fourth International Workshop on Requirements Engineering: Foundation of Software Quality,
          <fpage>71</fpage>
          -
          <lpage>84</lpage>
          .
        </mixed-citation>
      </ref>
      <ref id="ref11">
        <mixed-citation>
          <string-name>
            <surname>Sommerville</surname>
            <given-names>I.</given-names>
          </string-name>
          ,
          <string-name>
            <surname>Sawyer</surname>
            <given-names>P.</given-names>
          </string-name>
          and
          <string-name>
            <surname>Viller</surname>
            <given-names>S.</given-names>
          </string-name>
          (
          <year>1997</year>
          )
          <article-title>Requirements Process Improvement Through the Phased Introduction of Good Practice</article-title>
          ,
          <source>Software Process-Improvement and Practice</source>
          ,
          <volume>3</volume>
          ,
          <fpage>19</fpage>
          -
          <lpage>34</lpage>
          .
        </mixed-citation>
      </ref>
      <ref id="ref12">
        <mixed-citation>
          <string-name>
            <surname>Wieringa R. J.</surname>
          </string-name>
          (
          <year>1996</year>
          )
          <article-title>Requirements Engineering Frameworks for Understanding</article-title>
          , John Wiley &amp; Sons.
        </mixed-citation>
      </ref>
      <ref id="ref13">
        <mixed-citation>
          <string-name>
            <given-names>Yu E.</given-names>
            and
            <surname>Mylopoulos</surname>
          </string-name>
          <string-name>
            <surname>J.</surname>
          </string-name>
          (
          <year>1998</year>
          )
          <article-title>Why Goal-Oriented Requirements Engineering</article-title>
          , Fourth International Workshop on Requirements Engineering:
          <article-title>Foundation for Software Quality</article-title>
          .
        </mixed-citation>
      </ref>
    </ref-list>