      Abstract. Maintaining different but consistent views on the same pro-
      cess is often necessary in BPM projects. For example, a business analyst
      typically works on a business process model at a different level of ab-
      straction than an IT architect. These views evolve independently and
      synchronizing them is not trivial. In this demonstration, we showcase
      our Shared Process Model prototype that allows different stakeholders
      to work on different views of a business process model while keeping these
      views synchronized. In particular, we will look at scenarios where a busi-
      ness view and an IT view are modified and a subset of the modifications
      need to be propagated from one view to the other. This demonstration
      targets the general BPM audience interested in ensuring consistency be-
      tween various level of realisation of a business process model and solving
      the related round tripping problems. This demonstration will also appeal
      to people interested in process comparison and process merging — the
      two core techniques used by our prototype to propagate changes from
      one view to the other.


1   Relevance to BPM field
A business process model is used by different stakeholders for different purposes.
For example, a business analyst uses a business process model to document, an-
alyze and communicate a process while an IT architect uses a process model to
implement the process on a particular process engine. Both stakeholders use a
model that represents the same process but from a different perspective which
has different requirements. For example, the IT architect is interested in model-
ing the service invoked when a task is executed and the exception flow triggered
when the service invocation fails. For the business analyst, these implementation
details clutter the process and therefore should not appear in his view. Note that
the differences are not only IT refinements, i.e., the business view is not just a
subset of the IT view. We study the differences between the two perspectives in
more detail elsewhere [4].
    In this demo, we will showcase our Shared Process Model prototype. The
Shared Process Model supports parallel maintenance of different views of a the
same BPMN 2.0 model, a capability lacking in major BPM suites [2]. In Sect. 2,
we discuss the features, the supported scenarios, and an overview of the imple-
mented approach of our prototype. In Sect. 3, we describe a scenario that we
will use as screen-cast to highlight the features of the Shared Process Model. In
Sect. 4, we conclude with the limitations of the prototype and future work.
2   The Shared Process Model

The Shared Process Model is a research prototype built on top of the BPMN2
Modeler — an Eclipse-based graphical BPMN 2.0 model editor [1]. The Shared
Process Model provides to the users two different views on a process, a business
view and an IT view as illustrated by Fig. 1.




                        Fig. 1: The Shared Process Model

Supported operations: The Shared Process Model supports the independent
development of a business-view and an IT view of a process through tree key
operations:

get returns a copy of the current version of the IT or business view,
change allows the user to modify his copy of the IT or business view, and
update allows the user to synchronize his copy of the IT or business view with
   the Shared Process Model. Each change can be either designated as a com-
   mon or a private change. A common change is automatically propagated by
   the Shared Process Model to the other view whereas a private change is not.


Central features: The Shared Process Model allows a user to modify either
the business or the IT view and to propagate a subset of these modifications to
the other view. For example, the IT architect might decide to update changes
made to the main control-flow of the process as common but to keep private the
addition of the exception flow. The IT architect may need to propagate changes
to the business view because the initial business model is incomplete, contains
modeling errors, contradicts some IT requirements, or does not faithfully rep-
resent the actual business process. Propagating changes is also required when
the business or the IT requirements change. The reasons and frequency of these
updates are presented in more detail in a technical report [4].
    It also ensures that the two views remain consistent, i.e., the IT view is
a ‘faithful’ representation of the business view and vice et versa. The enxact
notions of consistency considered ad how they are ensured or checked is out of
scope of this paper but are presented in the technical report [4].
    Finally, the Shared Process Model provides a set of model refactoring oper-
ations to support the user in modifying a view while retaining its consistency
with the other view. For example, it provides refactoring operations to refine an
activity into a subprocess or into a set of activities together with the control-flow
between them, to specify that an activity is implemented as a script task or a
service task, and to simplify a portion of the process into a single activity.

                                         2
Shared Process Model implementation and change propagation: Fig. 2
illustrates the internal of our implementation a Shared Process Model: two
BPMN 2.0 process models representing the two views and correspondences (the
highlighted vertical arrows) relating the nodes of the two models. Note that cor-
respondences can point to multiple corresponding nodes and that some nodes of
the IT view do not have a corresponding node in the business view.




              Fig. 2: A example of Shared Process Model internals
   When a user modifies one view, let us say the IT view, and updates the Shared
Process Model, we compute the changes between the updated IT view and the
Shared Process Model version of the IT view (which represent the view before
the modifications) using a comparison framework [5]. The common changes,
formulated for the IT view, are translated into changes applicable to the business
view. The translation is based on the correspondences and, when navigating
correspondences with multiple targets in the business view, it uses structural
analysis on the business view. Finally, the common changes are merged using a
merging framework that we developed.


3   The Shared Process Model in Action

We now present a short scenario where the Shared Process Model is used to
synchronize a business and an IT view on a process. A screen-cast of featuring
this scenario is available on the project webpage [3]. This scenario features two
actors Alan, a business analyst and Paul, an IT architect.


Initialization of the Shared Model First, Alan captures the business process
model illustrated by Fig. 3. Alan initializes the Shared Process Model, which now
contains this process in both views and the appropriate correspondences. From
now on, Alan will work on the business view and Paul on the IT view. Alan asks
Paul to create an implementation of the process model.

                                        3
                       Fig. 3: Initial business process model
Private and Common Changes: Using refactoring operations, Paul refines
the specification of the activities by specifying their realization, some activities
are implemented as script tasks other by service tasks. He also adds the exception
flow. These changes are only relevant to the IT view. Therefore, Paul commits
the changes as private. Paul then realizes that he can optimize the control-flow
of the process and that Alan forgot one activity. These changes are relevant to
business view and Paul updates them as common. The IT view now displays the
process in Fig. 4 while the business view displays the process illustrated on top
of Fig. 2.




               Fig. 4: IT view after private and common changes
Private refactoring: Paul wants to convert the two human activities into
one. He uses the simplify selection refactoring wizard, which turns a selection of
elements into a single activity and reroutes the incident edges of the selection
accordingly. The refactoring also creates the correspondence between the two
business activities and the IT activity. This change is a private change. The
Shared Process Model now contains the two views illustrated by Fig. 2.

Common changes using correspondences Finally, Paul inserts a new ac-
tivity between ‘Validate Pin’ and ‘Input Transaction Data’ as a common change
which results in the IT view illustrated by Fig. 5. Looking at Fig. 2, one realizes
that the translation of this change, as described in Sect. 2, requires to navigate
the correspondences and to perform a structural analysis.




       Fig. 5: IT view after selection simplification and insertion of task
   Updating this change results in the business view illustrated by Fig. 6. The
two views have evolved and are now significantly different. However, the Shared

                                         4
Process Model is still able to propagate automatically changes between the two
views ensuring that they stay consistent maintaining the correspondences be-
tween its different elements.




                            Fig. 6: Final business view

4   Limitations and future work
In this prototype, we focused on the propagation of control-flow related modifi-
cations. The propagation of some attribute modifications such as, for example,
changing the type of an event is not implemented but could easily be added. We
also consider the implementation of a user interface allowing a user to approve
or reject the changes made by another user. For example, Alan could approve
only a subset of the common changes proposed by Paul.
    We only presented the modifications of two views: business and IT. The
Shared Process Model can be generalized to any two BPMN 2.0 views. The
architecture of the prototype as well as comparison and merging components
would scale up to a larger number of views. However, the correspondences would
require a more complex representation and management.
    We currently support scenarios where IT view and business view modifica-
tions are interleaved. Ultimately, we aim to integrate the Shared Process Model
in a modern BPM suite where models sit in a shared repository, the Shared
Process Model would then be a shared object in the repository and new sce-
narios would involve concurrent editing of the IT and business view. Support to
prevent, detect, and resolve conflicts arising from concurrent editing is necessary
for these scenarios.

References
1. The BPMN 2.0 Modeler available at http://eclipse.org/projects/project.php?
   id=soa.bpmn2-modeler
2. M. Castelo Branco, K. Czarnecki, J. Kuester, and H. Völzer. An Empirical Study
   on Consistency Management of Business and IT Process Models. available at http:
   //gsd.uwarterloo.ca/reportstudybpm
3. C. Favre, J. Kuester, and H. Völzer. The Artifact Consistency Management project:
   http://researcher.watson.ibm.com/researcher/view_project.php?id=3210
4. J. Kuester, H. Völzer, C. Favre, M. Castelo Branco, and K. Czarnecki. Supporting
   Different Process Views through a Shared Process Model. Technical report, IBM
   Research, RZ3823.
5. J. Küster, C. Gerth, A. Förster, and G. Engels. Detecting and resolving process
   model differences in the absence of a change log. Business Process Management,
   pages 244–260, 2008.



                                         5